My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP7269 - SP7278
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP6718 - SP7507
>
SP7269 - SP7278
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 11:24:20 AM
Creation date
4/25/2024 8:12:44 AM
Metadata
Fields
Template:
Small Plans - SP
Project
West Country Club Reconstruction, Phase 9
Limits
De Ovan Avenue: Kirk Avenue to Ryde Avenue
Year
2020
Project Engineer
Hadi Tabatabaee
Roads Worked
De Ovan Ave.
Red Lines
Yes
Project #
221914
Districts
District 3
Supplemental fields
Classification
Record Drawings
Cross Ref
SP7269 - SP7278
Type
Reconstruction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r CC)RD DRAWING <br />;orrecflons By � <br />`` o C;har,Zn��� <br />See Sheet No.3 <br />isw��ti ��yfor Typical Section <br />Any Person Using This C3�rawing shore des i <br />All Information sy nspocting 'The sex9 o -t w,,i* <br />LO <br />EP/LIP N <br />41 <br />01 <br />' M - --- --J -- I"I - J�---- <br />DE OVAN AVENUE <br />J <br />L <br />U <br />25 <br />X26 <br />Const Exist <br />Utility locations are approximate. <br />Utility depths and locations are not shown on profile. <br />Hinge Point <br />'- Exist FL Rt Sta 25+75 <br />Elev. 101.50 <br />Conform <br />W <br />D <br />Z <br />W <br />Lij <br />I- 4' � <br />(TYP) <br />L _IJ <br />END PROJECT <br />CONFORM <br />Sta 26+33 <br />Elev. 102.01 <br />23+00 24+00 <br />OG 101.42 OG 101.68 <br />FG 100.88 FG 101.11 <br />COUNTY <br />OF SAN JOAQUIN <br />NO SCALE <br />PLAN AND PROFILE <br />DRAWN BY <br />DATE PROJECT <br />o <br />CHECKED <br />DATE <br />`ENGINEER <br />717 <br />....................... <br />Exist FL Lt <br />�rn <br />�rn <br />rno <br />00 <br />o� <br />SCALE <br />+ <br />o <br />+ <br />o <br />+ <br />o <br />+PROFILE <br />o <br />0 20 40 <br />80 100 Horiz <br />N_ <br />N_ <br />N_ <br />N <br />II - <br />0� <br />ole <br />Ili <br />sir <br />41 <br />�cj� <br />0 2 4 <br />10 Vert <br />U <br />- <br />— <br />J <br />23+00 24+00 <br />OG 101.42 OG 101.68 <br />FG 100.88 FG 101.11 <br />COUNTY <br />OF SAN JOAQUIN <br />NO SCALE <br />PLAN AND PROFILE <br />DRAWN BY <br />DATE PROJECT <br />DATE <br />CHECKED <br />DATE <br />`ENGINEER <br />717 <br />OG 101.75 <br />FG 101.33 <br />26+00 <br />OG 101.89 <br />FG 101.72 <br />WEST COUNTRY CLUB RECONSTRUCTION, PHASE 9 Sheet No. <br />(De Ovan Avenue: Kiri: Avenue to Ryde Avenue) 1 8 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.