Laserfiche WebLink
PLANING ROADWAY SURFACING <br />Location Quantity (SQYD) <br />Sta 18+92 to Sta 19+92 284 <br />Sta 62+88 to Sta 63+88 529 <br />Total 813 <br />PAVEMENT REPAIR <br />Location Quantity (SQYD) <br />13 Locations 155 <br />Total 155 <br />SHOULDER BACKING <br />Location Quantity (TON) <br />Sto 18+92 to Sta 59+96 (Lt) 104 <br />Sto 18+92 to Sta 63+88 (Rt) 22 <br />Total 126 <br />COUNTY OF SAN JOAQUIN NO SCALE <br />DRAWN BY DATE PROJECT ENGINEER <br />Cnov (�Zi OSepr2019 <br />DRIVEWAY (TYPE E) <br />Location Quantity (SQYD) <br />5 Locations 2,237 <br />Total 2,237 <br />Location Quantity (SQYD) <br />South East corner Frontage Rd and <br />Acampo Road 22 <br />Tota 122 <br />SUMMARY OF QUANTITIES <br />DATE CHECKED BY DATE <br />/1-i1-/ F ovtk+ 10&"�"'` Il /2.1/19 <br />HOT MIX ASPHALT (TYPE A) <br />Location Quantity (TON) <br />Mainline Resurfacing 1,952 <br />Pavement Repair 6 <br />Driveways 192 <br />Place HMA (Misc Areas) 4 <br />Tota 12,154 <br />PLACE HOT MIX ASPHALT <br />(MISCELLANEOUS AREAS) <br />Location Quantity (LF) <br />Various Locations <br />Sta 24+28 (Rt) to Sta 57+03 (Rt) 339 <br />Tota 1339 <br />GEOSYNTHETIC PAVEMENT <br />INTERLAYER (PAVING FABRIC) <br />Location Quantity (SQYD) <br />Sta 18+92 to Sta 63+88 11,490 <br />Total 11,490 <br />NORTH 99 FRONTAGE ROAD (EAST) RESURFACINGI Sheet No. <br />(890' North of Woodbridge Road to Acampo Road) 6 of 6 <br />N <br />MCORD DRAWING <br />Correatlons By_,_.____ <br />i <br />o <br />, <br />x= o Changes <br />Uate <br />r 01 Person Usin <br />is Drawing Shou <br />information By Inspecting The Site titn. i, <br />m <br />z <br />0 <br />COUNTY OF SAN JOAQUIN NO SCALE <br />DRAWN BY DATE PROJECT ENGINEER <br />Cnov (�Zi OSepr2019 <br />DRIVEWAY (TYPE E) <br />Location Quantity (SQYD) <br />5 Locations 2,237 <br />Total 2,237 <br />Location Quantity (SQYD) <br />South East corner Frontage Rd and <br />Acampo Road 22 <br />Tota 122 <br />SUMMARY OF QUANTITIES <br />DATE CHECKED BY DATE <br />/1-i1-/ F ovtk+ 10&"�"'` Il /2.1/19 <br />HOT MIX ASPHALT (TYPE A) <br />Location Quantity (TON) <br />Mainline Resurfacing 1,952 <br />Pavement Repair 6 <br />Driveways 192 <br />Place HMA (Misc Areas) 4 <br />Tota 12,154 <br />PLACE HOT MIX ASPHALT <br />(MISCELLANEOUS AREAS) <br />Location Quantity (LF) <br />Various Locations <br />Sta 24+28 (Rt) to Sta 57+03 (Rt) 339 <br />Tota 1339 <br />GEOSYNTHETIC PAVEMENT <br />INTERLAYER (PAVING FABRIC) <br />Location Quantity (SQYD) <br />Sta 18+92 to Sta 63+88 11,490 <br />Total 11,490 <br />NORTH 99 FRONTAGE ROAD (EAST) RESURFACINGI Sheet No. <br />(890' North of Woodbridge Road to Acampo Road) 6 of 6 <br />