Laserfiche WebLink
m <br />1P <br />PAVEMENT REPAIR <br />Location Quantity (SQYD) <br />Sta 58+70 38 <br />DRIVEWAYS (TYPE D) <br />Location Quantity (SQYD) <br />42 Locations 383 <br />DRIVEWAYS (TYPE E) <br />Location Quantity (SQYD) <br />11 Locations 112 <br />PENETRATION TREATMENT <br />Location Quantity (SQYD) <br />Hibbard Rd/ Harney Ln West 30 <br />Hibbard Rd/ Harney Ln East 33 <br />Total 63 <br />PREPARE CONCRETE BRIDGE DECK SURFACE <br />Location Quantity (SQFT) <br />Sta 51 +40 TO 52+10 2,304 <br />FURNISH BRIDGE DECK TREATMENT MATERIAL <br />Location Quantity (GAL) <br />Sta 51 +40 TO 52+10 38 <br />MISCELLANEOUS ARES (DOWN DRAIN) <br />Location Quantity (SQYD) <br />4 Locations 3.5 <br />SHOULDER BACKING <br />Location Quantity (TON) <br />Sta 10+53 to Sta 76+17 526 <br />GEOSYNTHETIC PAVEMENT INTERLAYER <br />(PAVING FABRIC) <br />Location Quantity (SQYD) <br />Sta 52+10 to Sto 76+17 4,358 <br />HOT <br />MIX <br />ASPHALT <br />(TYPE A) <br />Location <br />Quantity (LF) <br />Quantity <br />(TON) <br />Hibbard Road <br />(Lt) <br />111 <br />Sta 49+72 <br />TO <br />Sta 10+53 to <br />Sta. <br />51 +40 <br />Sta 52+56 <br />1,691 <br />Sta 52+10 to <br />Sta. <br />75+67 <br />Sta 52+66 <br />840 <br />Sta 75+67 to <br />Sta. <br />76+17 <br />28 <br />Pavement Repair <br />Tota 1 467 <br />13 <br />Driveways <br />75 <br />Tapered Edge <br />44 <br />AC Dike <br />1 <br />Miscellaneous <br />Areas <br />(Down Drain) <br />1 <br />Atkinson Road <br />Conform <br />19 <br />Total <br />2,712 <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />Jeff v 3/2020 5• Za •Za <br />GRIND EXISTING BRIDGE DECK <br />Location Quantity (SQYD) <br />Sta 51 +40 TO 52+10 256 <br />TREATED SURFACE FRICTION TEST <br />Location Quantity (EA) <br />Sta 51+40 TO 52+10 1 <br />NO SCALE I SUMMARY OF QUANTITIES <br />CHECKED DATE <br />PLANING ASPHALT CONCRETE PAVEMENT <br />Location Quantity (SQYD) <br />Hibbard Road <br />Sta 10+53 to Sta 51 +40 8,455 <br />Sta 52+10 to Sta 53+10 311 <br />Conform (Harney Lane) 19 <br />Atkinson Road Conform <br />Conform 12 <br />Total 8,797 <br />INSTALL CROSS PIPE <br />Location Quantity (LF) <br />Sta 37+50 57 <br />Sta 39+12 26 <br />Total 83 <br />PLACE HOT <br />MIX ASPHALT <br />DIKE (TYPE A) <br />Location <br />Quantity (LF) <br />Sta 49+72 <br />TO <br />50+83 <br />(Lt) <br />111 <br />Sta 49+72 <br />TO <br />50+93 <br />(Rt) <br />121 <br />Sta 52+56 <br />TO <br />53+75 <br />(Lt) <br />119 <br />Sta 52+66 <br />TO <br />53+82 <br />(Rt) <br />116 <br />Tota 1 467 <br />TREAT BRIDGE DECKS <br />Location Quantity (SQFT) <br />Sta Ai Z �. 2,304 <br />a! ! z S.. <br />nom.jo. 10 <br />�, Inspw. inq 110w fit' <br />HIBBARD ROAD RESURFACING Sheet No. <br />(Tokay Colony Road to Harney Lane) 6 of 6 <br />