My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP7303 - SP7308
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP6718 - SP7507
>
SP7303 - SP7308
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 11:26:54 AM
Creation date
4/26/2024 8:26:56 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Horner Avenue Resurfacing
Limits
Drake Avenue to Walker Lane
Year
2020
Project Engineer
Ryan Yamada
Roads Worked
Horner Ave.
Red Lines
Yes
Project #
221915
Districts
District 2
Supplemental fields
Classification
Record Drawings
Cross Ref
SP7303 - SP7308
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
01 <br />0 � <br />m <br />■ <br />Remove Subbase, Base, and Roadway Surfacing (Var) <br />Place 0.25' HMA <br />q Const <br />�IT�> <br />iLln <br />/ \ Ully IrLli uZ1Y / \ <br />W HORNER <br />D4 I <br />SD sS 36 sD 38 SS sD SD 39 <br />01 0 D <br />I' I EP <br />w <br />I � <br />o I� w �I <br />� z zl <br />IQI wl <br />Q <br />■ <br />Remove Subbase, Base, and Roadway Surfacing (Var) <br />Place 0.25' HMA <br />100' EP Taper Transition <br />0 0 <br />- <br />EP + 0 <br />+ <br />'� HORNER <br />X49 N50 <br />o S <br />+ EPg+ <br />100' EP Taper Transition <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />1iLIY / <br />AVE <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />\ 11 �z;: <br />u�� <br />I I <br />� Const <br />J` <br />N N 52 N N DQ N <br />N N SS N N 53 N <br />C - <br />RECORD DRAW111%. <br />Correctlons BV— .._ <br />Mo Cha ngeu DW <br />Date �.,._� L <br />Any Pe sm ins Drawingg `3hoi :4i <br />A l Information By Inspecting the srte Of W -r <br />COUNTY <br />OF SAN <br />JOAQUIN <br />NO SCALE <br />PLAN <br />DRAWN BY <br />DATE <br />PROJECT ENGINEER <br />DATE <br />CHECKEEDD <br />DATES <br />Nung Ho <br />03/20 <br />43/31/Z <br />��.�u�JE/ <br />1-31 �0� <br />M <br />Conform <br />EP <br />R <br />N' <br />AVENUE N <br />N 55 N <br />R <br />END PROJECT <br />HORNER AVENUE <br />HORNER AVENUE RESURFACING <br />(Drake Avenue to Walker Lane) <br />MtSsl <br />0 <br />Qi <br />V) <br />Sheet No. <br />5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.