Laserfiche WebLink
v-__� <br />Qs 9+00 <br />MORADA MIDDLE SCHOOL <br />SLURRY SEAL NORTH HALF OF STREET - <br />(19.9'± WIDTH C.L. TO LIP) WITHIN LIMITS <br />OF WATER MAIN CONSTRUCTION <br />EXIST. I �I <br />0 PUE �, - ^- BUS LANE <br />1 - // <br />i <br />�LO <br />I <br />co co <br />L+ <br />-co <br />Ex. FH Connected to Ex c? II <br />on-site system_ <br />r E- <br />A. C. P. <br />-A.C.P. <br />nI-31.1.31 NW)v' <br />V.-31 0±(SE) <br />n <br />o c� <br />ro <br />i p,.?�, •STI@4 *. ; a- vim 'o I'.c ; //� <br />�- <br />rn � Existing Parking <br />\t�-- <br />Cn <br />/ _ <br />111R W <br />. :� � 1 =• . ,F<,<.,: � - 4� r r, J :., _�_ .t ,/-Ex,�&G_i_ �..:..,:--� - - -- -- -- -- -- -- - --. _- -- - --- --- -•_ .- _.__ -- -•- Dw -- <br />1 r (rEx. &G 1 a . -� - <br />ee <br />Np, <. • 5 <br />PPO- . E�c� G ,..� ,..» ..,�. �.,� �,_ mr. ,�,...,.,. _ _,._ _..,_ ._.. . <br />Ex.C.G.&S _ %� e�C.,. - .^ _ _ _ _ _ ,_ -- -- -- r . _ __., �_ - Ex. C&G <br />- _ ..._.. _ > r- x2 Ga 1� <br />-H <br />- <br />6+00 17+00 18+0 } <br />10+00 11+00 -I 12+ _ 13+00 - 14+00 _ 15+00 4- _ CLL - 4 - - -.} - I - En of <br />- - 4- -} - -� - ---r }- - } - _ -Ex. <br />Tre ch <br />Ex._gC pike_-n�-.._�s_ ..-� :_,-__._� _ _ = _,, _ Ex Y. 1 EX;F <br />�� ... _ w _ -- --- _ _ _ _ <br />._ T _ -Jel BOy <br />_ ,..,.. ...s ., .....:.. ,:...r _ `;] EX Dwy,� EX Dwy. y <br />EX: DW«c wmb <br />Qw _ _ _ r <br />2" stab lOPUE <br />EASTVIEW -1 DRIVECQ <br />S CONSTRUCTION II <br />CL:, M17� BENCH MARK DATUM 20E U� <br />o BASIS OF STATIONING: � ATto <br />PBEGINNING OF IRON POF UR EIN IN RINYEAST IEWNDRIIVE, I I <br />I IRON PIN IN SURVEY 'MONUMENT BOX AT EAST BOUNDARY v' STATION: 18+18.65; ELEVATION = 37.68. I I I Cn <br />OF "WILKINSON MANOR, UNIT NO. 3" = STATION 10+00.00. <br />KEY MAP <br />QUASHNICK ROAD I__.L I _J- --J1 L l _� <br />I <br />l <br />MORAL <br />I <br />.- MIDDLE <br />SCHOOL, P <br />r I ROJECT SITE; <br />_ <br />iE <br />f { IT \ \ -- <br />I I .� ..L .}. - <br />_..i,II. _ <br />- EASTIEW DR ti - <br />1 r ri <br />T 1 II <br />1 <br />I <br />I k. MOSHER <br />ASHLEY LANE <br />_ <br />�1 - <br />- :_[�"'41-E <br />. <br />C <br />_1 <br />! l <br />.J X <br />ARADLANE <br />I <br />VICINITY MAP <br />N.T.S. <br />LEGENDABBREVIATIONS <br />T^ <br />lJ 1 <br />U <br />I 3 <br />w <br />0 <br />0 <br />w <br />o <br />dicb ® <br />CURB INLET CATCH BASIN <br />dicb m <br />HI <br />i <br />EXISTING STORM DRAIN MAINTENANCE HOLE with RIM ELEVATION <br />v-__� <br />Qs 9+00 <br />MORADA MIDDLE SCHOOL <br />SLURRY SEAL NORTH HALF OF STREET - <br />(19.9'± WIDTH C.L. TO LIP) WITHIN LIMITS <br />OF WATER MAIN CONSTRUCTION <br />EXIST. I �I <br />0 PUE �, - ^- BUS LANE <br />1 - // <br />i <br />�LO <br />I <br />co co <br />L+ <br />-co <br />Ex. FH Connected to Ex c? II <br />on-site system_ <br />r E- <br />A. C. P. <br />-A.C.P. <br />nI-31.1.31 NW)v' <br />V.-31 0±(SE) <br />n <br />o c� <br />ro <br />i p,.?�, •STI@4 *. ; a- vim 'o I'.c ; //� <br />�- <br />rn � Existing Parking <br />\t�-- <br />Cn <br />/ _ <br />111R W <br />. :� � 1 =• . ,F<,<.,: � - 4� r r, J :., _�_ .t ,/-Ex,�&G_i_ �..:..,:--� - - -- -- -- -- -- -- - --. _- -- - --- --- -•_ .- _.__ -- -•- Dw -- <br />1 r (rEx. &G 1 a . -� - <br />ee <br />Np, <. • 5 <br />PPO- . E�c� G ,..� ,..» ..,�. �.,� �,_ mr. ,�,...,.,. _ _,._ _..,_ ._.. . <br />Ex.C.G.&S _ %� e�C.,. - .^ _ _ _ _ _ ,_ -- -- -- r . _ __., �_ - Ex. C&G <br />- _ ..._.. _ > r- x2 Ga 1� <br />-H <br />- <br />6+00 17+00 18+0 } <br />10+00 11+00 -I 12+ _ 13+00 - 14+00 _ 15+00 4- _ CLL - 4 - - -.} - I - En of <br />- - 4- -} - -� - ---r }- - } - _ -Ex. <br />Tre ch <br />Ex._gC pike_-n�-.._�s_ ..-� :_,-__._� _ _ = _,, _ Ex Y. 1 EX;F <br />�� ... _ w _ -- --- _ _ _ _ <br />._ T _ -Jel BOy <br />_ ,..,.. ...s ., .....:.. ,:...r _ `;] EX Dwy,� EX Dwy. y <br />EX: DW«c wmb <br />Qw _ _ _ r <br />2" stab lOPUE <br />EASTVIEW -1 DRIVECQ <br />S CONSTRUCTION II <br />CL:, M17� BENCH MARK DATUM 20E U� <br />o BASIS OF STATIONING: � ATto <br />PBEGINNING OF IRON POF UR EIN IN RINYEAST IEWNDRIIVE, I I <br />I IRON PIN IN SURVEY 'MONUMENT BOX AT EAST BOUNDARY v' STATION: 18+18.65; ELEVATION = 37.68. I I I Cn <br />OF "WILKINSON MANOR, UNIT NO. 3" = STATION 10+00.00. <br />KEY MAP <br />QUASHNICK ROAD I__.L I _J- --J1 L l _� <br />I <br />l <br />MORAL <br />I <br />.- MIDDLE <br />SCHOOL, P <br />r I ROJECT SITE; <br />_ <br />iE <br />f { IT \ \ -- <br />I I .� ..L .}. - <br />_..i,II. _ <br />- EASTIEW DR ti - <br />1 r ri <br />T 1 II <br />1 <br />I <br />I k. MOSHER <br />ASHLEY LANE <br />_ <br />�1 - <br />- :_[�"'41-E <br />. <br />C <br />_1 <br />! l <br />.J X <br />ARADLANE <br />I <br />VICINITY MAP <br />N.T.S. <br />S:\Projects\2009\09016\dwg\09016_EASTIEW-KEY-REV 7-15-09.dwg 7/16/2009 10:28:02 AM PDT <br />G 510 <br />GENERAL NOTES <br />1. <br />LEGENDABBREVIATIONS <br />FEAR <br />EXISTING WATER LINE SIZE <br />[8T7W <br />PROPOSED WATER LINE SIZE <br />Ex.12" SD <br />EXISTING FLOW DIRECTION & SIZE OF STORM <br />dicb ® <br />CURB INLET CATCH BASIN <br />dicb m <br />DROP INLET CATCH BASIN <br />37.03 O <br />EXISTING STORM DRAIN MAINTENANCE HOLE with RIM ELEVATION <br />sdinh <br />Works Dept. prior t o implementation. <br />p p p <br />Z <br />INSTALL WATER VALVE <br />g <br />EXISTING WATER VALVE <br />Ab FH <br />INSTALL FIRE HYDRANT <br />V fh <br />EXISTING FIRE HYDRANT <br />cl <br />EXISTING BLOWOFF <br />0 wmb <br />EXISTING WATER SERVICE METER BOX <br />4. <br />INSTALL BACKFLOW PREVENTION DEVICE <br />® <br />INSTALL WATER METER IN BOX <br />DE <br />EXISTING ELECTRICAL VAULT <br />C�l­- <br />EXISTING STREET LIGHT <br />PP ,O' <br />POWER POLE <br />Jlt <br />HANDICAP RAMP <br />jurisdiction. The contractor shall be responsible for reporting all conflicts, errors, <br />I};E <br />TREE with TRUNK DIAMETER <br />omissions, etc. to the Engineer immediately upon discovery. If so directed by <br />37.43 <br />EXISTING PAVEMENT ELEVATION <br />the Director of Public Works or Building Dept., the contractor shall stop work <br />fl.05 <br />EXISTING GUTTER FLOWLINE ELEVATION <br />37.17 <br />EXISTING LIP OF GUTTER ELEVATION <br />lip <br />The Contractor shall install all traffic striping, markings, and legends per State of <br />37.45 <br />EXISTING TOP OF CURB ELEVATION <br />to <br />California Department of Transportation (Cal Trans) standards. Restorationn of <br />37.55 <br />EXISTING BACK OF WALK ELEVATION <br />bow <br />any damaged existing painted legends or signs is the responsibility of the <br />INV 33.08 <br />PIPE INVERT ELEVATION <br />A.C.P. <br />ASBESTOE CEMENT PIPE <br />EXIST or EX <br />EXISTING <br />R/W <br />RIGHT OF WAY <br />P.L. or P/L <br />PROPERTY LINE <br />C.L. or C/L <br />CENTERLINE <br />GB <br />GRADE BREAK <br />LP <br />LOW POINT <br />HP <br />HIGH POINT <br />TC <br />TOP OF CURB <br />BC <br />BEGIN CURVE <br />EC <br />END CURVE <br />dwy. <br />DRIVEWAY <br />clf <br />CHAIN LINK FENCE <br />10' PUE <br />PUBLIC UTILITY EASEMENT WITH WIDTH <br />LUSD <br />LODI UNIFIED SCHOOL DISTRICT <br />S:\Projects\2009\09016\dwg\09016_EASTIEW-KEY-REV 7-15-09.dwg 7/16/2009 10:28:02 AM PDT <br />G 510 <br />GENERAL NOTES <br />1. <br />All construction materials and workmanship shall conform to the latest edition of <br />16. <br />Bedding for all pipe lines shall conform to County Standards. <br />the SJ County Public Improvement Design Standards, Construction Specifications <br />17. <br />Any CHANGES to the approved Improvement Plans and Specifications must be <br />and Standard Plans unless specifically shown otherwise on these plans. <br />prepared and certified by the "Civil Engineer" and shall be approved by the Public <br />2. <br />plans. <br />See Latest SJ County Standards for details called out on these p <br />Works Dept. prior t o implementation. <br />p p p <br />3. <br />The contractor shall make a site inspection prior to providing any proposals to <br />P P p 9 Y P p <br />18. <br />responsibility of the contractor. All <br />Material sampling and testing shall be the respo s y <br />I items not shown as bid item on the ro osal sheets, but <br />determine any and all to s s p p <br />results shall be sent to the County Inspector. <br />which may be necessary to perform a complete and acceptable job. <br />19, <br />Eastview Drive and Freesia Avenue shall remain open to traffic at all times. <br />4. <br />' z Inc. (Engineer) will not be responsible for or liable for an <br />umbach and Plazah <br />Ba ( g )Y <br />20. <br />ve d <br />II be approved <br />The contractor shall submit a Traffic Control Plan (TCP) which shall pp <br />unauthorized changes to or uses of these plans. All changes to these plans shall <br />by the County Public Works Dept. at a minimum of seventy-two (72) hours prior <br />be in writing and must be approved by Engineer and all local agencies having <br />to starting any work in the right-of-way. This plan shall be in accordance with <br />jurisdiction. The contractor shall be responsible for reporting all conflicts, errors, <br />the latest Caltrans Traffic Manual. No open trenches except at the time of work, <br />omissions, etc. to the Engineer immediately upon discovery. If so directed by <br />Use steel plates, backfill with A.C. cap. Conformance with the TCP shall be <br />the Director of Public Works or Building Dept., the contractor shall stop work <br />maintained at all times. <br />until mitigations can be made. Any costs incurred resulting from the contractor's <br />21. <br />The Contractor shall install all traffic striping, markings, and legends per State of <br />failure to stop as directed, shall be the responsibility of the contractor. <br />California Department of Transportation (Cal Trans) standards. Restorationn of <br />5. <br />It is agreed that field conditions may require changes to these plans. It is further <br />any damaged existing painted legends or signs is the responsibility of the <br />agreed that the Director of Public Works may require changes, alterations or <br />contractor and shall be included in his bid price. <br />these plans, when the Director deems them to b e necessary or <br />additions to rY <br />P � <br />22. <br />Drainage facilities shall be maintained during periods of inclement weath er, and <br />desirable for the proper completion of the work, provided that such changes, <br />restored to their original conditions upon completion of the work. <br />alterations and additions shall not exceed 10% of the original estimate of the <br />23. <br />GUARANTEE Clause (Sec. 3-4 of SJ County Specifications): The completed project, <br />cost for the improvements without prior approval of the county. <br />including all work, materials, devices and equipment, shall be guaranteed by the <br />6. <br />Contractor agrees that he shall assume sole and complete responsibility for job <br />Developer (through the Contractor) against faulty workmanship and materials <br />site conditions during the course of construction of the project, including safety <br />for a period of one year after final acceptance by the Director of Public Works. <br />for all persons and property; that this requirement shall apply continuously and <br />The Developer (through the Contractor) shall be responsible for all repairs <br />not be limited to normal working hours; and that the Contractor shall defend, <br />and/or replacements including all labor, materials, equipment, devices, <br />indemnify and hold the Owner, San Joaquin County and Civil Engineer harmless <br />plant and other items of work necessary. To secure this guarantee, a Bond or other <br />from any and all liability, real or alleged, in connection with the performance of <br />security shall be provided by the Contractor in the amount of 20010 of the value of work <br />work on this project, excepting for liability arising from the sole negligence of the <br />estimated by the Engineer. Said Bond shall continue in full force and effect for a period <br />Owner or Civil Engineer. <br />of one year from the date of the formal acceptance of the work by the Director of <br />7. <br />The contractor shall obtain all necessary encroachment permits for the project <br />Public Works or Board of Supervisors. <br />and be in receipt of such permits and approved plans prior to beginning of <br />24. <br />INSPECTION DURING CONSTRUCTION Clause (Sec. 3-5 of SJ County Specifications): <br />construction. <br />Any improvements constructed to these Specifications and which it is intended that the <br />8. <br />A pre -construction meeting shall be scheduled by the Contractor prior to <br />County will assume maintenance responsibility, must be inspected during construction <br />construction. The Contractor shall notify the Engineer, County Inspector and all <br />by an authorized agent of the Developer and Director. Each phase of construction <br />utility agencies at least one week prior to the date of the meeting. The <br />must be inspected and approved prior to proceeding to the subsequent phases. <br />Contractor's job superintendent and all major sub -contractors shall attend. <br />Any improvements constructed without inspection as provided above or constructed <br />9. <br />Excavation safety requirements include obtaining a CAL OSHA permit or letter of <br />contrary to the orders or instructions of the authorized agent of the Developer and <br />notification to the County before commencing excavations over five feet deep. <br />Director will be deemed as not complying with San Joaquin County Standards and <br />Refer to SJ County Construction Specification for additional requirements. <br />Specifications, and will not be accepted by San Joaquin County for maintenance <br />10. <br />Contractor is to verify the depth and/or location in the field of all existing utilities <br />purposes. <br />11. <br />before the start of construction. <br />All valve boxes are to be set flush with the finsh grade, unless otherwise <br />The County Department of Public Works will perform field inspection for this project. <br />indicated. <br />The Civil Engineer, Director and Developer, or their agents, shall at all times, have <br />12. <br />Engineer shall be provided with compaction tests of all trenches under asphalt <br />access to the work during its construction, and shall be furnished with every reasonable <br />and roadway compaction, prior to paving. Contractor is responsible for the cost <br />facility for ascertaining that the materials and the workmenship are in accordance with <br />the requirements and intentions of these specifications, special provisions, and plans. <br />13. <br />of all testing. <br />All work will be required to be inspected by the Public Works Dept. They shall be <br />All work done and all material furnished shall be subject to review. The review of the <br />work or materials shall not relieve the Contractor and Developer of any of their <br />notified not less than 24 hours in advance of commencement of work. Unless <br />obligations to fulfill their Contract as prescribed. <br />otherwise noted on PERMIT. <br />14. <br />Utility Pipe horizontal and vertical clearances shall comply with State Health <br />Standards. <br />15. <br />All testing for leakage or overdeflection shall be witnessed by the Public Works <br />Inspector. <br />WATER SYSTEM NOTES: <br />1. Water used in any phase of construction, such as backfill compaction, dust <br />control,I testing <br />or other work herein required, shall be <br />included in the unit price <br />or lump sum bid for the respective item of construction or items of work. <br />2. The Contractor shall obtain a permit or permission from the County for use of <br />water from fire hydrants for construction perposes. See also Dust Control Notes, <br />note 5. <br />3. Installed Water Service shall be at least three feet from other services, tees, <br />valves and blow -offs. <br />4. All water lines shall have a minimum cover of 30". <br />5. Water mains shall bE� CL. 150 PVC (AWWA C-900) or alternate pipe conforming <br />to the County specifications. Class 200 PVC (or Ductile Iron Pipe) shall be used <br />where noted on these plans. <br />6. Separation of water and storm drain or sewer mains (including crossings) and <br />storm or sewer laterals crossing over water mains, shall meet or exceed the <br />Department of <br />Health Services. <br />latest standards of the State of California <br />P <br />n standards. <br />LINES shall be <br />pressure tested <br />per the latest County 7. ALL WATER p p Y <br />Pipelines failing pressure test shall be repaired and retested. Contractor to <br />provide all necessary equipment for testing and provide at least 48 hours notice <br />to County. <br />8. All water lines shall be disinfected, flushed and tested for bacteria in <br />conformance with the San Joaquin County Health Code Requirements prior to <br />connecting to existing water line. <br />11. THE CONTRACTOR SHALL notify the County for approval prior to connecting the <br />water line to existing water main. Backflow prevention devices utilized in the <br />separation of new and old mains shall be certified per County standards. <br />12. FIRE HYDRANT BID shall include the following: Tee, 6"lateral, 6"valve and <br />complete fire hydrant assembly. <br />13. Install a reflective, blue marker at 12" from the center line of the street, towards <br />hydrant, to denote the fire hydrant location. <br />14. Install Locator Wire in Water Main trench per San Joaquin County Standard W-8. <br />15. Any Hot Taps shall be performed under inspection of San Joaquin County <br />(Wilkinson Manor Maintenance District). Contact the Maintenance District at <br />(209) 468-3090, 48 hours minimum, prior to construction or any other possible <br />interruption to customers water service. <br />16. Installed Water Meter shall be Sensus brand, measurable in gallons. An <br />attachment connector spud shall be provided. <br />PAVING NOTES <br />1. Any Asphalt Concrete surface to be removed shall be sawcut to a neat, straight <br />line parallel with the street centerline and the exposed edge shall be tacked with <br />emulsion prior to paving. Any existing concrete surface to be removed shall be <br />sawcut to a neat, straight line. <br />2. The CONTRACTOR small pay for compaction tests for subgrade. If compaction <br />test fails, contractor shall pay for additional testing. <br />3. Whenever pavement: is broken or cut in the installation of the work covered by <br />these plans and or specifications, the pavement shall be replaced after proper <br />backfilling with pavement materials equal to or better than the materials used in <br />the original paving. <br />4. The north half of Eastview Drive, within the limits of the water main contruction, <br />shall be slurry sealed as part of this project. <br />SCALE: C=40' <br />UTILITY NOTES <br />1• Existing underground utilities were plotted from available records. Completeness <br />leteness <br />and accuracy of existing utility locations shown in these plans are not <br />guaranteed. <br />2. Existing underground utilities shall be protected. The contractor shall be <br />responsible for contacting all utility agencies to mark their utilities in the field at <br />least 48 hours before excavation. The contractor shall notify and coordinate all <br />work with any agency requiring removal or relocation of their utilities. Call <br />"USA" (800) 227-2600. <br />3. Non -potable water shall be used for trench compaction and dust control. <br />Contact San Joaquin County Utility Maintenance Dept., Ron Rall, (209) 468-3091 <br />with questions. <br />DUST CONTROL NOTES <br />1. DustControl is the Contractors sole responsibility during <br />construction. <br />Contractor shall take all necessary precautions to keep dust to a minimum. Cost <br />of Dust Control to be included in the bid. <br />2. All motors shall be kept properly tuned and maintained. <br />3. The area disturbed by excavation activities should be minimized at all times. <br />4. All material transported on or off-site shall either be sufficiently watered or <br />securely covered to prevent excessive amount of dust. <br />5. Non -potable water shall be used for compaction and dust control. Contact San <br />Joaquin County Utility Maintenance Dept., Ron Rall, (209) 468-3091 with <br />questions. <br />6. All operations shall comply with the requirements of the San Joaquin Valley <br />Unified Air Pollution Control District <br />EROSION CONTROL NOTES <br />1. Streets adjacent to the project site should be swept as needed to remove silt <br />which may have accumulated from construction activities; daily if needed. <br />2. The contractor shall be responsible for determining, installing & maintaining any <br />Best Management Practices (BMPs) required for this project. BMPs may include <br />catch basin filters and regular street sweeping. <br />3. All catch basins adjacent to construction area shall be sealed by filters until the <br />completion of the project. If the work extends into the rainy season, other <br />measures may be taken as required by the County at no additional cost to the <br />owner. All storm drainage traps shall be cleaned prior to acceptance of work. No <br />eroded soil shall be allowed in the Public Right of Way. <br />SERVICES: <br />WATER - WILKINSON MANOR MAINTENANCE DISTRICT <br />STORM DRAINAGE (EASTVIEW DRIVE) - SAN JOAQUIN COUNTY <br />SHEET INDEX <br />1 TITLE SHEET <br />2 IMPROVEMENT PLAN <br />3 DETAIL SHEET <br />o QRCFESS/ONC <br />�A E. Poe <br />42764 <br />F%P.3/31 /1 <br />�IV1� �P <br />qTF OF <br />