My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
E427 - E433
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer E
>
E304 thru E433
>
E427 - E433
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 12:16:07 PM
Creation date
5/3/2024 12:01:45 PM
Metadata
Fields
Template:
Large Plans - LP
Project
Eight Mile Road Improvements
Limits
Davis Road to Pearson Road
Year
1992
Project Engineer
Karen Kinsa
Roads Worked
Eight Mile Rd.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
E427 - E433
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Conform at E.P. <br />8y �. <br />Existing Conform <br />Width <br />0.30' Asphalt Concrete over <br />shaped and compacted native material. <br />TYPE D <br />Conform at E.P. <br />>k *R — Conform to <br />existing radii <br />Existing Conform <br />Width <br />Variable depth Asphalt Concrete <br />over existing paved driveway. <br />TYPE E <br />TYPICAL DRIVEWAYS <br />PLAN <br />)PE PROTE( <br />See Note Below <br />Existing Surface <br />----- ----- * * ------- -------- <br />1.00' Asphalt Concrete <br />PAVEMENT REPAIR DETAIL <br />NOTE: Width, length and locations <br />to be determined by Engineer. <br />dw 6'f <br />Dncrete <br />Top of Existing Bank <br />4 4 A <br />A a ` <br />F rt a4 41aa <br />• Conform to4:_ <br />existing slope —� 2 <br />ete a>, <br />SECTION A <br />ION DETAIL <br />RECORD DRAWING <br />Comwtlons By <br />No Changes By ' <br />Date -/1-- -7-1?z <br />Any Person Using This Draw��nh Site Of Worhould k <br />All Information By Inspecting <br />RECONSTRUCT PULL BOX <br />Location Quandt <br />Sta. 375+55 (Rt.) 1 Each <br />PAVEMENT REPAIR <br />Location Quandt <br />104 sites throughout project 2)321 S.Y. <br />PLANING ASPHALT <br />CONCRETE PAVEMENT <br />Location <br />Quandt <br />Sta. <br />239+50 to Sta. 240+00 <br />178 <br />S.Y. <br />Davis <br />Road Intersection <br />178 <br />S.Y. <br />U.P.R.R. Xing <br />444 <br />S.Y. <br />Sta. <br />302410 to Sta. 302+50 <br />142 <br />S.Y. <br />Sta. <br />314+75 to Sta. 315+25 <br />178 <br />S.Y. <br />West <br />Lane Intersection <br />922 <br />S.Y. <br />Sta. <br />401 +50 to Sta. 402+00 <br />178 <br />S.Y. <br />Tota <br />EARTHWORK <br />2,220 S.Y. <br />(ROADWAY WIDENING) <br />Location Quandt <br />Sta. 343+70 to Sta. 348+20 (Lt.) 4.5 Sta. <br />Sta. 343+70 to Sta. 349+10 (Rt.) 5.4 Sta. <br />Sta. 351 +00 to Sta. 355+40 <br />(Lt. & Rt.) 8.8 Sta. <br />Total 18.7 Sta. <br />SHOULDER BACKING <br />Location Quandt <br />Sta. 249+50 to Sta. 402+00 4,115 Tons <br />ASPHALT CONCRETE DIKE <br />(TYPE C — LOW DIKE) <br />Location Quanht <br />U.F.R. R. 51n7 1.940 I.. F. <br />DRIVEWAYS (Type D) <br />Location Quandt <br />4 sites throughout project 117 S.Y. <br />DRIVEWAYS (Type E) <br />Location Quandt <br />26 sites throughout project 1,431 S.Y. <br />ASPHALT CONCRETE <br />(Type B) <br />Location <br />Quantity <br />Roadway <br />7,204 <br />Tons <br />Davis Road Intersection <br />204 <br />Tons <br />West Lane Intersection <br />237 <br />Tons <br />Ham Lane Intersection <br />25 <br />Tons <br />Leach Road Intersection <br />6 <br />Tons <br />Roadway Widening <br />875 <br />Tons <br />Driveways — Type D <br />30 <br />Tons <br />Driveways — Type E <br />160 <br />Tons <br />Pavement Repair <br />1,667 <br />Tons <br />A.C. Dike (Type, C — Low Dike) <br />13 <br />Tons <br />Total <br />10,421 <br />Tons <br />PAVEMENT REINFORCING <br />FABRIC <br />Location <br />Quandt <br />Sta. 240+00 to <br />Sta 265+27 <br />6,739 <br />S.Y. <br />Sta. 266+40 to <br />Sta. 302+10 <br />9,520 <br />S.Y. <br />Sta. 315+25 to <br />Sta. 401+50 <br />23,000 <br />S.Y. <br />Total <br />39,259 <br />S.Y. <br />SACKED CONCRETE <br />SLOPE PROTECTION <br />Location '. Quantit <br />Stc. 348-60I (Rt.) 9 C.}'. (F) <br />(F) —denotes final pay quantity <br />Location Quandt <br />Intersection of Eight Mile Rd. <br />and West Lane Lump Sum <br />DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE SUBMITTED DATE APPROVED DATE r SHEET TOTAL <br />�qz ,o �% GQUNTY �F SAN JOAQUIN NO SCALE CONSTRUCTION DETAILS EIGHT MILE ROAD IMPRO�itMENTS No SHEETS <br />4192 Of (/-1—( ¢�9Z '�� � 9�s/�i �� ��� AND NOTES Davis Road to Pearson Road <br />7 7 <br />FILE NA E DRAWER SHEET NO. ACAD <br />D:\EIGHT\NOTES <br />
The URL can be used to link to this page
Your browser does not support the video tag.