Laserfiche WebLink
4. <br />GENERAL NOTES: <br />1. ALL IMPROVEMENTS SHALL BE CONSTRUCTED IN STRICT ACCORDANCE WITH COUNTY OF SAN <br />JOAQUIN STANDARD SPECIFICATION AND PLANS, 2016 EDITION, AND ALL AMENDMENTS <br />THERETO TO DATE. ALL WORK SHALL BE INSPECTED BY COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS OR BUILDING DEPARTMENT. <br />2. ELEVATIONS SHOWN ARE NAVD88. BENCHMARK IS AS SHOWN ON THIS SHEET. <br />3. DRAWING NUMBERS SHOWN ON PLAN REFER TO S.J. COUNTY STANDARD DRAWING DETAILS. <br />4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING FROM DAMAGE ALL EXISTING <br />IMPROVEMENTS THAT ARE TO REMAIN. SUCH IMPROVEMENTS THAT ARE DAMAGED BY THE <br />CONTRACTOR, SHALL BE REPLACED AT HIS EXPENSE. <br />5. AN ENCROACHMENT PERMIT FROM THE SAN JOAQUIN COUNTY PUBLIC WORKS DEPARTMENT <br />CONTRACTOR IS REQUIRED PRIOR TO BEGINNING AN WORK IN THE COUNTY RIGHT OF WAY. A <br />SEPARATE ENCROACHMENT PERMIT FROM THE CITY OF STOCKTON IS REQUIRED FOR SANITARY <br />SEWER FACILITIES. CONTRACTOR SHALL NOTIFY COUNTY 48 HOURS IN ADVANCE OF PERFORMING <br />ANY WORK REQUIRED WITHIN THE PUBLIC RIGHT-OF-WAY. <br />6. WORK IN STREET RIGHT-OF-WAY IS SUBJECT TO THE APPROVAL AND ACCEPTANCE OF THE <br />COUNTY OF SAN JOAQUIN PUBLIC WORKS DEPARTMENT. <br />7. CONTRACTOR SHALL DEMOLISH, EXCAVATE, REMOVE AND DISPOSE OF ANY EXISTING <br />CONCRETE OR ASPHALT CONCRETE PAVING, CONCRETE CURB, GUTTER AND SIDEWALK AND <br />DELETERIOUS MATERIAL AS REQUIRED TO CONSTRUCT THE CONTRACT WORK, ALL EXCESS <br />MATERIAL GENERATED BY DEMOLITION, EXCAVATION AND GRADING SHALL BE DISPOSED OF <br />BY THE CONTRACTOR WITHIN 24 HRS. <br />8. EXCAVATION OF 5' OR MORE IN DEPTH WILL REQUIRE AN EXCAVATION PERMIT FROM THE <br />STATE OF CALIFORNIA DEPARTMENT OF INDUSTRIAL SAFETY. <br />9. THE PRICE BID FOR THIS WORK SHALL INCLUDE THE COST FOR ANY AND ALL PERMITS <br />REQUIRED TO COMPLETE THE PROJECT WORK. <br />10. EXISTING UTILITIES ARE SHOWN AS THEY ARE BELIEVED TO EXIST. THE OWNER AND THE <br />ENGINEER DO NOT ACCEPT RESPONSIBILITY FOR THEIR ACCURACY. PRIOR TO COMMENCING <br />ANY WORK, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO LOCATE THE EXISTING MAIN <br />AND SERVICE LINES. <br />11. PAYMENT FOR PAVEMENT WILL BE MADE ONLY FOR AREAS SHOWN ON THE PLANS. <br />REPLACEMENT OF PAVEMENT WHICH IS BROKEN OR CUT IN THE INSTALLATION OF THE WORK <br />COVERED IN THESE SPECIFICATIONS, AND WHICH LIES OUTSIDE OF SAID AREAS, SHALL BE <br />INCLUDED IN THE CONTRACTOR'S UNIT PRICE OF PAVEMENT, AND NO ADDITIONAL PAYMENT <br />SHALL BE MADE FOR SUCH WORK. <br />12. CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR <br />JOBSITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING <br />SAFETY OF ALL PERSONS AND PROPERTY, THAT THIS REQUIREMENT SHALL APPLY <br />CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND THAT THE <br />CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER, COUNTY AND THE ENGINEER <br />HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE <br />PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE <br />SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER. <br />13. WE CALL YOUR ATTENTION TO: SECTION 1540(a)(1) OF THE CONSTRUCTION SAFETY ORDERS <br />(TITLE 8 CALIFORNIA ADMINISTRATION CODE SECTION 1540), ISSUED BY THE OCCUPATIONAL <br />SAFETY AND HEALTH STANDARDS, BOARD PURSUANT TO THE CALIFORNIA OCCUPATIONAL <br />SAFETY AND HEALTH ACT OF 1973, AS AMENDED, WHICH STATES: "PRIOR TO OPENING AN <br />EXCAVATION, EFFORT SHALL BE MADE TO DETERMINE WHETHER UNDERGROUND <br />INSTALLATIONS; I.E. SEWER, WATER, FUEL, ELECTRIC LINES, ETC. WILL BE ENCOUNTERED AND, <br />IF SO, WHERE SUCH UNDERGROUND INSTALLATIONS ARE LOCATED. WHEN THE EXCAVATION <br />APPROACHES THE APPROXIMATE LOCATION OF SUCH INSTALLATION, THE EXACT LOCATION <br />SHALL BE DETERMINED BY CAREFUL PROBING OR HAND DIGGING; AND WHEN IT IS <br />UNCOVERED, ADEQUATE PROTECTION SHALL BE PROVIDED FOR THE EXISTING INSTALLATION. <br />ALL KNOWN OWNERS OF UNDERGROUND FACILITIES IN THE AREA CONCERNED SHALL BE <br />ADVISED OF PROPOSED WORK AT LEAST 48 HOURS PRIOR TO THE START OF ACTUAL <br />EXCAVATION". <br />14. DUST CONTROL SHALL BE PERFORMED AT ALL TIMES, AT THE CONTRACTOR'S EXPENSE, TO <br />MINIMIZE ANY DUST NUISANCE AND SHALL BE IN ACCORDANCE WITH SECTION 10 OF CALTRANS <br />STANDARD SPECIFICATIONS AND THE REQUIREMENTS OF SAN JOAQUIN COUNTY. <br />15. A TRAFFIC CONTROL PLAN (TCP) SHALL BE SUBMITTED TO AND DEEMED ACCEPTABLE BY <br />COUNTY PRIOR TO START OF WORK. THIS SHALL ADDRESS ALL PHASES OF WORK, WHICH WILL <br />IMPACT PUBLIC TRAFFIC. CONFORMANCE WITH THE TCP SHALL BE MAINTAINED AT ALL TIMES. <br />16. PRIOR TO COMMENCING ANY WORK, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO <br />HAVE EACH UTILITY COMPANY LOCATE IN THE FIELD THEIR MAIN AND SERVICE LINES. THE <br />CONTRACTOR SHALL NOTIFY MEMBERS OF THE UNDERGROUND SERVICE ALERT (U.S.A.) 48 <br />HOURS IN ADVANCE OF PERFORMING EXCAVATION WORK BY CALLING TOLL FREE NUMBER <br />800-227-2600. <br />17. CONTRACTOR SHALL PROVIDE CONSTRUCTION SIGNS AND TRAFFIC DEVICES FOR PUBLIC <br />SAFETY AND CONVENIENCE. CONTRACTOR SHALL KEEP TWO TRAFFIC LANES OPEN IN <br />ADJACENT PUBLIC STREETS AT ALL TIMES DURING CONSTRUCTION. <br />18. ALL STATIONS REFER TO DISTANCES ALONG STREET CENTERLINE, UNLESS OTHERWISE <br />NOTED. ALL STATIONS OFF CENTERLINE ARE PERPENDICULAR TO OR RADIALLY OPPOSITE <br />CENTERLINE STATIONS. <br />19. PRIOR TO ACCEPTANCE OF THE PROJECT, THE CONTRACTOR SHALL DELIVER TO THE <br />ENGINEER, ONE SET OF NEATLY MARKED AS -BUILT RECORD DRAWINGS SHOWING THE <br />INFORMATION REQUIRED ABOVE. AS -BUILT RECORD DRAWINGS SHALL BE REVIEWED AND <br />THE COMPLETE AS -BUILT RECORD DRAWING SET SHALL BE CURRENT WITH ALL CHANGES <br />AND DEVIATIONS REDLINED AS A PRECONDITION TO THE FINAL PROGRESS PAYMENT <br />APPROVAL AND/OR FINAL ACCEPTANCE. ENGINEER TO PROVIDE A COPY OF AS BUILT <br />RECORDS TO S.J. COUNTY UPON COMPLETION OF WORK. <br />20. WHENEVER PAVEMENT IS BROKEN OR CUT IN THE INSTALLATION OF THE WORK COVERED <br />BY THE PLANS AND/OR SPECIFICATION, THE PAVEMENT SHALL BE REPLACED AFTER <br />PROPER BACKFILLING WITH PAVEMENT MATERIALS EQUAL OR BETTER THAN THE <br />MATERIALS USED IN THE ORIGINAL PAVING. ALL PAVEMENT CUTS SHALL BE REPAIRED IN <br />ACCORDANCE WITH THE COUNTY'S TRENCH CUTTING POLICY (SECTION 2-5.0 OF THE <br />IMPROVEMENT STANDARDS) AND DWGS R-36 AND R-37. THIS WILL REQUIRE THE <br />CONTRACTOR TO SEAL COAT OVER THE PAVED TRENCHES. <br />21. DRAINAGE FACILITIES SHALL BE MAINTAINED DURING PERIODS OF INCLEMENT WEATHER, <br />AND RESTORED TO THEIR ORIGINAL CONDITIONS UPON COMPLETION OF THE WORK. <br />22. THE CONTRACTOR IS RESPONSIBLE FOR THE PRESERVATION OF SURVEY MONUMENTS <br />LOCATED WITHIN THE AREA OF WORK HEREIN PERMITTED. PRIOR TO THE START <br />CONSTRUCTION, SURVEY MONUMENTS THAT POTENTIALLY MAY BE DISTURBED SHALL BE <br />LOCATED AND REFERENCED BY A LICENSED LAND SURVEYOR, AND A CORNER RECORD <br />FILED WITH THE COUNTY SURVEYOR. ANY SURVEY MONUMENTS DISTURBED DURING THE <br />COURSE OF CONSTRUCTION SHALL BE REESTABLISHED BY A LICENSED LAND SURVEYOR <br />AND ANOTHER CORNER RECORD FILED WITH THE COUNTY SURVEYOR. (LAND SURVEY'S <br />ACT SECTION 8771) <br />23. CONTRACTOR TO CONTACT THE CITY OF STOCKTON MUNICIPAL UTILITY DEPARTMENT TO <br />OBTAIN A PERMIT FOR THE INSTALLATION OF SANITARY SEWER LATERALS. THE CITY OF <br />STOCKTON WILL INSTALL THE CONNECTIONS ON THE EXISTING SANITARY SEWER LINE. <br />CONTRACTOR TO INSTALL THE SANITARY SEWER LATERAL AND CLEANOUT. <br />STORM DRAINAGE SYSTEM CONSTRUCTION NOTES: <br />1. CONTRACTOR SHALL PREVENT POSSIBLE STORM WATER POLLUTION FROM ENTERING INTO <br />STORM DRAINAGE CATCH BASINS DURING CONSTRUCTION. <br />UNAUTHORIZED CHANGES AND USES: <br />THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR <br />LIABLE FOR, UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. ALL <br />CHANGES TO THE PLANS MUST BE IN WRITING AND MUST BE APPROVED BY <br />THE PREPARER OF THESE PLANS. <br />PIPE SPECIFICATIONS: <br />STORM DRAINAGE PIPE SHALL BE SDR 26 RUBBER GASKETED PVC PIPE AS PER SAN <br />JOAQUIN COUNTY STANDARD SPECIFICATIONS UNLESS NOTED OTHERWISE ON THE PLAN. <br />ALL WATER SERVICES SHALL CONFORM TO SAN JOAQUIN COUNTY SPECIFICATIONS. <br />BACKFILL SHALL CONFORM TO SAN JOAQUIN COUNTY STANDARD PLAN NUMBER R-29. <br />TRENCHING NOTE: <br />THE CONTRACTOR SHALL PROVIDE ALL SHORING, BRACING, SLOPING OR OTHER PROVISIONS <br />NECESSARY TO PROTECT WORKMAN FOR ALL AREAS TO BE EXCAVATED TO A DEPTH OF 5' <br />OR MORE. EXCAVATIONS OF 5 FEET OR MORE IN DEPTH WILL REQUIRE AN EXCAVATIONS <br />PERMIT FROM THE STATE OF CALIFORNIA DEPARTMENT OF INDUSTRIAL SAFETY. FOR <br />TRENCHES 5 FEET OR MORE IN DEPTH, THE CONTRACTOR SHALL COMPLY WITH SECTION <br />5-1.02A OF THE CALTRANS STANDARDS, SECTION 6705 OF THE STATE OF CALIFORNIA <br />LABOR CODE, AND ANY LOCAL CODES OR ORDINANCES. <br />BENCHMARK.- <br />BENCHMARK <br />ENCHMARK:BENCHMARK - COS 413 <br />DESCRIPTION: BRASS DISK MARKING COS MONUMENT STAMPED "14S-7 LS 6670" 5 FEET <br />EASE OF THE WEST CURB ON WILSON WAY APPROXIMATELY 100 FEET NORTH OF BRADFORD <br />STREET. <br />ELEVATION = 18.76' (NAVD88). <br />ABBREVIATIONS: <br />AC <br />ASPHALT CONCRETE <br />MH <br />BOW <br />BACK OF WALK <br />MIN. <br />C.O.S. <br />CITY OF STOCKTON <br />NO. <br />CB <br />CATCH BASIN <br />PL <br />CL <br />CENTER LINE <br />PP <br />CONC. <br />CONCRETE <br />P.U.E. <br />CONST. <br />CONSTRUCT <br />PVC <br />D/W <br />DRIVEWAY <br />S <br />DWG. <br />DRAWING <br />SD <br />EP <br />EDGE OF PAVEMENT <br />STD. <br />EX. <br />EXISTING <br />SS <br />FH <br />FIRE HYDRANT <br />SPN <br />GR <br />GRATE <br />TBM <br />TELE. <br />TYP <br />UG <br />WM <br />LEGEND <br />PROPOSED DESCRIPTION <br />FENCE <br />WALL <br />PROPERTY LINE <br />CENTERLINE <br />EDGE OF PAVEMENT <br />--� ELECTROLIER <br />UTILITY POLE WITH GUY WIRE <br />UTILITY POLE <br />8" W <br />WATER LINE <br />DATE: <br />WATER VALVE <br />SCALE: <br />FIRE HYDRANT <br />DRAWN: <br />WATER SERVICE <br />DESIGN: <br />W <br />WATER METER <br />SS <br />SEWER LINE <br />O <br />SEWER CLEAN OUT <br />24"SD <br />STORM DRAIN LINE <br />0 STORM DRAIN MAINTENANCE HOLE <br />® CATCH BASIN <br />2�J.O EXISTING GRADE <br />23.56 BOW PROPOSED GRADE <br />SAWCUT, REMOVE, & REPLACE <br />PROPOSED PAVEMENT <br />REVISIONS <br />MAINTENANCE HOLE <br />MINIMUM <br />NUMBER <br />PROPERTY LINE <br />POWER POLE <br />PUBLIC UTILITY EASEMENT <br />POLYVINYL CHLORIDE <br />SLOPE <br />STORM DRAIN <br />STANDARD <br />SANITARY SEWER <br />STANDARD PLAN NUMBER <br />TEMPORARY BENCH MARK <br />TELEPHONE <br />TYPICAL <br />UNDERGROUND <br />WATER METER <br />EXISTING <br />81 X - <br />---C2"SS - <br />0 <br />-[-24"SD - <br />I N0.1 DESCRIPTION I DATE I BY I <br />CONSTRUCTION STAKING: <br />1. CONSTRUCTION STAKING IS NORMALLY PERFORMED BY THE ENGINEER WHO PREPARED <br />THE PLAN. THIS PERMITS APPROPRIATE ON-SITE INTERPRETATION AND ADJUSTMENT <br />OF THE PLANS, IF NECESSARY. THIS NOTE GIVES FORMAL NOTICE THAT THE FIRM OF <br />WONG ENGINEERS, INC., CANNOT AND WILL NOT, TAKE RESPONSIBILITY FOR ERRORS <br />OR OMISSIONS, IF ANY, WHICH MIGHT OCCUR AND WHICH COULD HAVE BEEN <br />AVOIDED OR DETECTED AND/OR CORRECTED AND MITIGATED HAD WONG ENGINEERS, <br />INC., PERFORMED THE CONSTRUCTION STAKING WORK. <br />2. ALL REFERENCES TO CONTRACTOR SHALL MEAN CONTRACTOR FOR SITEWORK SHOWN <br />ON THESE CIVIL PLANS ONLY. <br />3. IF WONG ENGINEERS, INC. IS RETAINED TO DO THE CONSTRUCTION STAKING, WONG <br />ENGINEERS, INC. WILL SET ALL STAKES AND PROVIDE CUT SHEETS FOR THIS PROJECT. <br />IT IS EXPECTED THAT ONE SET OF STAKES WILL BE SUFFICIENT FOR EACH PHASE OF <br />THE PROJECT. CARE SHOULD BE TAKEN TO PROTECT STAKES. THE COST OF STAKING <br />IS BORNE BY THE DEVELOPER. THE CONTRACTOR SHALL REQUEST STAKES FROM WONG <br />ENGINEERS, INC. WHEN HE IS READY TO USE THEM AND SHALL BE RESPONSIBLE FOR <br />THEIR PRESERVATION FOR HIS FUTURE USE. SAID REQUEST MUST BE MADE AT LEAST <br />72 HOURS PRIOR TO THE TIME THE STAKES WILL BE REQUIRED. SHOULD THE WORK <br />NEED TO BE RESTAKED, FOR THE CONTRACTOR'S USE, THE CONTRACTOR SHALL BE <br />RESPONSIBLE TO WONG ENGINEERS, INC. FOR THE COST OF RESTAKING. SHOULD THE <br />CONTRACTOR DESTROY STAKES WHICH ARE NEEDED FOR IMPROVEMENTS OTHER THAN <br />HIS OWN, HE SHALL ALSO BE RESPONSIBLE FOR THE COST OF RESTAKING TO <br />RETURN THE JOB TO ITS ORIGINAL CONDITION. <br />UTILITY SERVICES PROVIDED BY: <br />1. STORM DRAINAGE: SAN JOAQUIN COUNTY <br />2. ELECTRICITY: P.G.&E. <br />3. NATURAL GAS: P.G.&E. <br />4. TELEPHONE: ATT <br />5. SANITARY SEWER: _CITY OF STOCKTON <br />6. WATER: CALIFORNIA WATER SERVICE <br />SHEET INDEX: <br />NO. DESCRIPTION <br />1. TITLE SHEET &NOTES <br />2. PLAN &PROFILE <br />3. EROSION CONTROL PLAN 8c DETAILS <br />See Note 1 Below <br />Existing - <br />6" Min- I 6" Pavement 6" �-6" Min <br />(TYP) (TYP) <br />�\ See Note 2 Below - \ <br />Compact in 12" max \ \\ 3'-0" <br />layers to a min relative_ - <br />\i compaction of 95% - - - - i <br />�\ \ under pavement and \ - - Var <br />Var 90% outside pavement. -- - <br />- Op - Compact in 24" max - OD+12" <br />k1orsmpaction <br />to a min relativeOD/2\!- of 85%. ompact in 6" layers <br />TTT to a min relative <br />compaction of 90%. <br />10" Min D 10" Min 10" Min OD - -10" Min <br />O 2 <br />+ 2D OD <br />+ 20" Min in <br />0" Min <br />RIGID CONDUIT FLEXIBLE CONDUIT <br />NOTES: <br />1. New pavement shall be 1" thicker than existing pavement, minimum <br />of 0.25 Ft. New base shall be 1" thicker than existing base, min of 0.50 Ft. <br />2. Select native material or imported granular material as approved by the Director <br />of Public Works. Backfill with materials equal to or better than the existing <br />pavement and base in quality. <br />3. Relative compaction of materials shall be tested in accordance with <br />the State of California, Dept. of Transportation Testing Manuals, test <br />method No. California 216 or 231. <br />4. All existing pavement shall be neatly cut to line prior to trench excavation. <br />5. Jetting or ponding will be permitted within the street right-of-way with <br />a 3 year bond, when approved by the Director of Public Works. <br />6. When shown by soil composition and compactability, ninety percent (90%) <br />compaction may be used, when approved by the Director of Public Works. <br />7. Special bedding and backfill requirements may be shown on the plans or <br />specified in the special provisions. <br />O Approved by: <br />TYPICAL TRENCH BACKFILL �i•-> <br />{ r� No. Revision Descri tion Date <br />COUNTY OF SAN JOAQUIN - <br />`"'''- DEPARTMENT OF PUBLIC WORKS <br />,W&Jdng <br />for Y10. 1 Date: DEC 2014 Std. Dwg. No. R-29 <br />800-227-2600 <br />.,c F OE v_ <br />�. <br />C3/ <br />N'�O_m SE01 <br />S�� LAND S6, <br />C��PGNpRY C. <br />NO. 7600 <br />EX. 12-31-2018 <br />LO <br />qTF OF C A0� <br />WONG ENGINEERS, INC. <br />PLANNING ENGINEERING SURVEYING <br />4578 FEATHER RIVER DRIVE, SUITE A <br />STOCKTON, CALIFORNIA (209)476-0011 <br />CR.CDATE 12/30/16 L.S.E. 7 <br />7600 <br />* <br />IMPROVEMENT PLANS FOR <br />MICHAEL <br />AVENUE <br />WONG ENGINEERS INC. <br />CONSULTING CIVIL ENGINEERS <br />STOCKTON, CALIFORNIA <br />VICINITY MAP <br />NOT TO SCALE <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />APPROVED AS "ENCROACHMENT PERMIT PLAN SET" <br />APPROVED FOR WORK WITH11111 COUNTY RIGHT-OF-WAY ONLY <br />QRpFESS/ON <br />htv��O�PcrpRY clb <br />�c l �y APPROVED: Zi <br />DATE <br />Z <br />NO. 48717 m <br />a EXPIRES: 9-30-2018 � R.C.E. N0.: Q EXP. DATE: 3 1 <br />CIV IL <br />F OCA\�FENCROACHMEN_4202'1071 <br />DATE <br />F <br />PERMIT NO: ISSUED: Z Z' h} BY: <br />JOB NO.: <br />3904 <br />DATE: <br />DEC. 2016 <br />SCALE: <br />AS SHOWN <br />DRAWN: <br />WS <br />DESIGN: <br />WE <br />CHECKED: <br />ZCW <br />MICHAEL AVENUE <br />TITLE SHEET <br />STOCKTON SHEET <br />CALIFORNIA <br />1 <br />OF THREE <br />FILE 3904 <br />