Laserfiche WebLink
NOTES: <br />1 <br />2. <br />If the distance between cross—cuts are less then 150' the entire area between <br />corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br />The resurfacing requirements shall be in addition to County Standard Drawing No <br />R-29. <br />3. Resurfacing for Bell Holes shall meet* these <br />the shoulder or lane, only that area shall bo <br />�'. If cross—cutting is performed on Local Roac <br />Coat for that half of the roadway containing <br />resurfacing. Section 2-5.03 (B-2). <br />Paved Shoulder - <br />C <br />L <br />C3� <br />requirements. If excavation occurs within <br />resufaced as shown. <br />s it intervals less then 150' a Seal <br />the trench can be used in, lieu of <br />c W t or <br />Killi��►i ►� <br />COUNTY OF SAN JOAQUIN <br />DEPARTME <br />NT OF PUBLIC WORKS <br />Date: MAY 2015 <br />