CITY OF TRACY STANDARD NOTES: <br />1. ALL WORK SHALL CONFORM TO THE CITY OF TRACY SPECIFICATIONS AND STANDARD PLANS. THE WORK IS SUBJECT TO THE <br />INSPECTION AND APPROVAL OF THE CITY ENGINEER, AND THE ENGINEERING DIVISION INSPECTORS. CONTACT ENGINEERING <br />DIVISION CONSTRUCTION MANAGEMENT AT (209)-831-4600, TWO WORKING DAYS (48 HOURS) PRIOR TO THE START OF <br />ANY WORK TO ARRANGE FOR INSPECTION. <br />2. THESE PLANS HAVE BEEN CHECKED BY THE CITY OF TRACY FOR CONFORMANCE WITH THE CITY'S MINIMUM <br />STANDARDS, BUT SUCH CHECKING BY THE CITY DOES NOT RELIEVE THE DEVELOPER FROM ITS RESPONSIBILITY TO FIND AND <br />CORRECT ERRORS, OMISSIONS OR MAKE CHANGES REQUIRED BY CONDITIONS DISCOVERED IN THE FIELD DURING THE <br />COURSE OF CONSTRUCTION. ANY REQUEST BY THE DEVELOPER TO CHANGE THESE PLANS SHALL BE SUBMITTED IN WRITING <br />TO THE CITY ENGINEER. <br />3. REFER TO THE FINAL MAP OF THIS TRACT FOR PROPERTY LINE DATA. <br />4, ALL REVISIONS TO THIS PLAN MUST BE REVIEWED BY THE CITY ENGINEER PRIOR TO CONSTRUCTION AND SHALL BE <br />ACCURATELY SHOWN ON REVISED PLANS STAMPED AND SIGNED BY THE CITY ENGINEER PRIOR TO THE INSTALLATION OF <br />THE IMPROVEMENTS. <br />5. ALL CONSTRUCTION STAKING FOR CURB, GUTTER, SIDEWALK, SANITARY SEWERS, STORM DRAINS, WATER LINES, FIRE <br />HYDRANTS, AND ELECTROLIERS, ETC., SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR. <br />6. THE EXISTING UTILITIES ARE PLOTTED FROM AVAILABLE RECORDS. THE DEVL PER SHALL TAKE PRECAUTIONARY MEASURES <br />TO <br />PROTECT THESE UTILITIES. THE DEVELOPER SHALL PERFORM NO EXCAVATION UNTIL ALL UTILITY AGENCIES AND THE <br />CITY OF TRACY HAVE BEEN NOTIFIED AND HAVE BEEN GIVEN THE OPPORTUNITY TO MARK THEIR FACILITIES IN THE FIELD. <br />NOTIFY UNDERGROUND SERVICE ALERT AT (800) 227-2600 AT LEAST TWO (2) WORKING DAYS PRIOR TO ANY EXCAVATION. <br />7, HOUSE SERVICES, FIRE HYDRANT LATERALS, GAS AND TELEPHONE LINES, AND ALL OTHER UNDERGROUND UTILITIES SHALL <br />BE INSTALLED PRIOR TO CURB, GUTTER, AND SIDEWALK CONSTRUCTION AND STREET PAVING. <br />8. SURVEY MONUMENTS SHALL BE FURNISHED AND INSTALLED BY THE DEVELOPER AT LOCATIONS SHOWN. SUBMIT A LETTER <br />OF CERTIFICATION FROM THE LICENSED LAND SURVEYOR CERTIFYING THAT ALL MONUMENTS ARE CENTERLINE <br />MONUMENTS AND ARE INSTALLED AND TAGGED IN ACCORDANCE WITHT THE APROVED FINAL MAP PRIOR TO TRACT <br />ACCEPTANCE. <br />9. ALL LINES ABANDONED DURING CONSTRUCTION SHALL BE REMOVED. <br />10. ALL SANITARY SEWER MAINS SHALL BE TELEVISION INSPECTED (TAPES SHALL BE GIVEN TO THE CITY OF TRACY), FLUSHED <br />WITH AN APPROVED SEWER BALL AND PASS A LEAKAGE TEST IN CONFORMANCE WITH CITY OF TRACY STANDARD <br />SPECIFICATIONS PRIOR TO ACCEPTANCE BY THE CITY. ALL TESTING SHALL BE PERFORMED AFTER THE COMPACTION OF <br />STREET BASE ROCK AND PRIOR TO PAVING. <br />11. ALL WATER LINES SHALL BE PRESSURE -TESTED, DISINFECTED, FLUSHED, AND TESTED FOR BACTERIA IN CONFORMANCE <br />WITH THE CITY OF TRACY DESIGN STANDARDS AND STANDARD SPECIFICATIONS PRIOR TO FINAL ACCEPTANCE BY THE CITY. <br />12. TESTING <br />(A) ALL INDEPENDENT LABORATORY INSPECTION CALLED FOR BY THE CITY ENGINEER WILL BE PAID FOR BY THE <br />DEVELOPER. <br />(B) ROADWAY SUB -BASE, BASE AND TRENCH BACKFILL COMPACTION TESTING SHALL BE PERFORMED BY A SOILS LAB <br />CONTRACTING WITH THE CITY OF TRACY. <br />(C) TESTS FOR R -VALUES ARE REQUIRED PRIOR TO THE INSTALLATION OF BASE ROCK. <br />(D) A MINIMUM OF 48 HOURS NOTICE IS REQUIRED TO SCHEDULE ALL SOILS TESTING SERVICES. <br />13. STREET SIGNS SHALL BE INSTALLED AT ALL INTERSECTIONS PER CITY DESIGN STANDARDS AND STANDARD SPECIFICATIONS. <br />14. TRAFFIC SIGNS SHALL BE INSTALLED IN CONFORMANCE WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES <br />(MUTCD) AND MUTCD CALIFORNIA SUPPLEMENTAL AT LOCATIONS SPECIFIED BY CITY DESIGN STANDARDS AND STANDARD <br />SPECIFICATIONS. <br />15. STREET STRIPING SHALL INCLUDE STOP BARS, CENTERLINE STRIPING OR MARKERS, CROSSWALKS AND ALL OTHER MARKINGS <br />REQUIRED BY THE CITY DESIGN STANDARDS AND STANDARD SPECIFICATIONS. STRIPING SHALL BE DONE WITH <br />THERMOPLASTIC AND REFLECTIVE MARKERS. STRIPING ON MAJOR ROADS SHALL BE CAT -TRACKED AND APPROVED PRIOR <br />TO FINAL INSTALLATION. <br />16. ALL TRENCHES SHALL BE RACK -FILLED IN ACCORDANCE WITH CITY DESIGN STANDARDS AND STANDARD SPECIFICATIONS. <br />COMPACTION SHALL BE ACHIEVED BY MECHANICAL MEANS. NO FLOODING, PONDING OR JETTING SHALL BE PERMITTED. <br />17. WHEN WIDENING THE PAVEMENT ON AN EXISTING ROAD, THE EXISTING PAVEMENT SHALL BE CUT TO A NEAT LINE AND <br />REMOVED BACK TO AN EXISTING ADEQUATE STRUCTURAL SECTION, OR TO THE ORIGINAL ROAD SECTION. AN <br />EXPLORATORY TRENCH, OR POT HOLING, MAY BE REQUIRED TO DETERMINE THE LIMITS OF PAVEMENT REMOVAL. <br />18. EXISTING CURB AND SIDEWALK WITHIN THE PROJECT LIMITS THAT ARE DAMAGED OR DISPLACED, EVEN THOUGH THEY WERE <br />NOT TO BE REMOVED, SHALL BE REPAIRED OR REPLACED PER CITY STANDARD PLANS EVEN IF DAMAGE OR DISPLACEMENT <br />OCCURRED PRIOR TO ANY WORK PERFORMED BY THE DEVELOPER. <br />19. AT THE INTERSECTION OF TWO STREETS, THE FULL STRUCTURAL SECTION OF THE MOST PROMINENT STREET SHALL BE <br />CONTINUED THROUGH THE INTERSECTION. <br />20. THE THICKNESS OF SUB -BASE, BASE AND SURFACING SHALL BE DETERMINED BY THE CITY ENGINEER BASED ON TRAFFIC <br />INDEX AND SOIL TEST FOR'R" VALUE TAKEN AFTER ROUGH GRADING AT THE LEVEL OF THE STREET SUB -GRADE. <br />21. ASBESTOS CEMENT PIPE (ACP) OR FITTINGS SHALL NOT BE USED WITHIN THE CITY OF TRACY. <br />22. ALL STREET MONUMENTS, LOT CORNER, AND OTHER PERMANENT PIPE OR MONUMENTS DISTURBED DURING THE PROCESS <br />OF CONSTRUCTION SHALL BE REPLACED BEFORE ACCEPTANCE OF IMPROVEMENTS BY THE CITY OF TRACY. <br />23. THE DEVELOPER SHALL CONTROL DUST AT ALL TIMES DURING CONSTRUCTION AS REQUIRED BY THE CITY OF TRACY. <br />24. PRIOR TO TRENCHING FOR ANY SEWER, WATER, OR STORM DRAIN PIPE, THE DEVELOPER SHALL VERIFY, IN THE FIELD, THE <br />SIZE AND LOCATION OF THE EXISTING PIPE AT THE POINT OF CONNECTION. ANY DEVIATION FROM THE PLANS SHALL BE <br />RESOLVED BY THE DESIGN ENGINEER PRIOR TO TRENCHING. <br />25. MANHOLES, VALVES, CLEANOUTS, ETC., SHALL BE BROUGHT TO FINISH GRADE BY THE DEVELOPER AFTER THE FINAL PAVING <br />COURSE IS PLACED. <br />26. THE INSTALLATION OF EROSION CONTROL FACILITIES SHALL BE COMPLETED PRIOR TO OCTOBER 15 AND SHALL BE <br />MAINTAINED DAILY UNTIL APRIL 15. THESE FACILITIES SHALL CONTROL AND CONTAIN EROSION -CAUSED SILT DEPOSITS <br />AND PROVIDE FOR SAFE DISCHARGE OF SILT -FREE STORM WATER INTO EXISTING STORM DRAIN FACILITIES. DESIGN OF <br />THESE FACILITIES MUST BE UPDATED EACH YEAR PRIOR TO SEPTEMBER 30 AND SHALL BE APPROVED BY THE CITY ENGINEER. <br />27. IF, DURING CONSTRUCTION, ARCHAEOLOGICAL REMAINS ARE ENCOUNTERED, CONSTRUCTION IN THE VICINITY SHALL BE <br />HALTED, AN ARCHAEOLOGIST CONSULTED, AND THE CITY COMMUNITY DEVELOPMENT DEPARTMENT NOTIFIED. IF, IN THE <br />OPINION OF THE ARCHAEOLOGIST, THE REMAINS ARE SIGNIFICANT, MEASURES AS MY BE REQUIRED BY THE COMMUNITY <br />DEVELOPMENT DIRECTORS, SHALL BE TAKEN TO PROTECT THEM. <br />28. WORK SHALL BE RESTRICTED TO WEEKDAYS BETWEEN 7:30AM AND 7:OOPM AND WEEKENDS BETWEEN 9:OOAM AND 5:OOPM. <br />WORK WHICH REQUIRES ANY TRAFFIC LANE CLOSURES OR RESTRICTION OF THE TRAVELED WAY SHALL BE LIMITED TO <br />9:OOAM TO 3:30PM IN THE COMMUTE DIRECTION AND 8:00 AM TO 4:30 PM IN THE NON -COMMUTE DIRECTION. COMMUTE <br />DIRECTIONS SHALL BE AS DETERMINED BY THE CITY ENGINEER. <br />29. THE OVERTIME COST FOR INSPECTING WORK REQUIRING CITY INSPECTION, PERFORMED BEFORE 8:OOAM AND 5:OOPM, <br />SHALL BE PAID BY THE DEVELOPER BEFORE THE WORK IS AUTHORIZED. <br />30. CONSTRUCTIONS EQUIPMENT WHICH OPERATES AT A NOISE LEVEL IN EXCESS OF 85 DECIBELS (MEASURED ON THE <br />A -WEIGHTED SCALE DEFINED IN ANSI S-1.4) AT A DISTANCE OF 100 FEET FROM THE EQUIPMENT IS PROHIBITED. <br />31. THE DEVELOPER SHALL KEEP EXCAVATIONS FREE FROM WATER DURING CONSTRUCTION. THE STATIC WATER LEVEL SHALL <br />BE DRAWN DOWN A MINIMUM OF 2 FEET BELOW BOTTOM OF EXCAVATIONS TO MAINTAIN UNDISTURBED STATE OF <br />NATURAL SOILS AND ALLOW PLACEMENT OF ANY FILL TO SPECIFIED DENSITY. DISPOSAL OF WATER SHALL NOT DAMAGE <br />PROPERTY OR CREATE A PUBLIC NUISANCE. <br />32. DISPOSAL OF WATER INTO THE CITY SANITARY SEWER SYSTEM IS STRICTLY PROHIBITED. DISPOSAL OF WATER IN TO <br />EXISTING STORM DRAIN SYSTEM MUST BE APPROVED IN WRITING BY THE CITY ENGINEER. <br />33. DEVELOPER SHALL MAINTAIN ALL STREETS, SIDEWALKS, AND ALL OTHER PUBLIC RIGHT-OF-WAY IN A CLEAN, SAFE AND <br />USABLE CONDITION THROUGHOUT THE COURSE OF CONSTRUCTION. ALL SPILLS OF SOIL, ROCK, CONSTRUCTION DEBRIS, <br />ETC., SHALL BE REMOVED IMMEDIATELY FROM PUBLICLY OWNED PROPERTY. ALL ADJACENT PROPERTY, PRIVATE OR PUBLIC, <br />SHALL BE MAINTAINED IN A CLEAN, SAFE AND USABLE CONDITION. THE DEVELOPER SHALL PROVIDE FOR SAFE, <br />UNOBSTRUCTED ACCESS TO PRIVATE PROPERTY ADJACENT TO WORK THROUGHOUT THE PERIOD OF CONSTRUCTION. <br />GENERAL NOTES: <br />1. ALL GRADING SHALL BE DONE IN ACCORDANCE WITH RECOMMENDATIONS IN THE GEOTECHNICAL AND FOUNDATION <br />INVESTIGATION PREPARED FOR THIS SITE BY ENGEO, DATED JULY 8, 2014, FILE NO. 11243.000.000 AND PER THE <br />PAVEMENT RECOMMENDATIONS MEMORANDUM PROVIDED BY ENGEO, DATED FEBRUARY 16, 2016. <br />2. BENCHMARK: <br />CITY OF TRACY BENCHMARK NUMBER 2015 PER RECORD OF SURVEY OF THE GEODETIC CONTROL NETWORK, RECORDED <br />TOP OF A STEEL PIN IN A MONUMENT WELL AT THE INTERSECTION OF SCHULTE ROAD AND HANSEN ROAD. <br />ELEVATION = 180.32 (CITY OF TRACY NAVD 1988 DATUM) <br />3. PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR SHALL CONTACT THE CITY'S PUBLIC WORKS DEPARTMENT AT <br />(209) 831-6460 AND REQUEST PRE CONSTRUCTION CONFERENCE. <br />4. ALL REVISIONS TO THIS PLAN MUST BE REVIEWED BY THE DEVELOPMENT AND ENGINEERING SERVICE DEPT. PRIOR TO <br />CONSTRUCTION AND SHALL BE ACCURATELY SHOWN ON REVISED PLANS SIGNED BY THE CITY ENGINEER. <br />5. ALL STREET IMPROVEMENTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE PROVISIONS OF THE CURRENT CITY <br />ORDINANCE CODE, STATE STANDARD SPECIFICATIONS, AND CITY OR COUNTY STANDARD PLANS. THE IMPROVEMENTS ARE <br />SUBJECT TO INSPECTION AND APPROVAL OF THE DEVELOPMENT AND ENGINEERING SERVICE DEPARTMENT. <br />CONTACT PUBLIC WORKS CONSTRUCTION INSPECTION AT 209-831-4600 AT LEAST TWO WORKING DAYS PRIOR TO THE <br />START OF ANY WORK TO ARRANGE FOR INSPECTION. <br />6. NOTIFY UNDERGROUND SERVICE ALERT 800-227-2600 AT LEAST TWO (2) WORKING DAYS PRIOR TO ANY EXCAVATION. <br />THE USA AUTHORIZATION NUMBER SHALL BE KEPT AT THE1 OB SITE. <br />7. THE CONTRACTOR 15 REQUIRED BY STATE LAW TO ACTIVELY RESEARCH WORK AREA PRIOR TO CONSTRUCTION. <br />CONTRACTOR SHALL REFERENCE MONUMENTS AND REPLACE THOSE DAMAGED OR REMOVED DURING CONSTRUCTION. <br />8. SHOULD IT APPEAR THAT THE WORK TO BE DONE, OR ANY MATTER RELATIVE THERETO 15 NOT SUFFICIENTLY DETAILED OR <br />EXPLAINED ON THESE PLANS, THE CONTRACTOR SHALL CONTACT ENGINEER FOR SUCH FURTHER EXPLANATIONS AS MAY BE <br />NECESSARY. <br />9. NO TREES SHALL BE REMOVED UNLESS THEY ARE SHOWN AND NOTED TO BE REMOVED ON THE IMPROVEMENT PLANS. ALL <br />TREES CONFLICTING WITH GRADING, UTILITIES, OR OTHER IMPROVEMENTS, OR OVERHANGING THE SIDEWALK OR <br />PAVEMENT 50 AS TO FORM A NUISANCE OR HAZARD, SHALL BE TRIMMED AND PROPERLY GRADED AND SEALED. THE DRIP <br />LINE OF TREES TO BE SAVED WILL BE FENCED, AND NO GRADING SHALL TAKE PLACE WITHIN THIS FENCED AREA. <br />10. THE THICKNESS OF SUBBASE, BASE, AND SURFACING SHALL BE BASED ON TRAFFIC INDEX AND SOIL TEST FOR "R" VALUE = 5. <br />11. ALL LINES ABANDONED DURING CONSTRUCTION SHALL BE REMOVED (UNLESS OTHERWISE NOTED AND APPROVED BY CITY <br />OF TRACY INSPECTOR). <br />12. CONTRACTOR SHALL CONTROL DUST AT ALL TIMES DURING CONSTRUCTION AS REQUIRED BY CITY OF TRACY. <br />13. MANHOLES, VALVES,CLEANOUTS ETC. SHALL BE BROUGHT TO FINISH GRADE PER TRACY STD. 114 AFTER THE FINAL PAVING <br />COURSE IS PLACED. PER TRACY STD. 301. MANHOLES SHALL HAVE GRADE RINGS OF 18" MIN TO 24" MAXIMUM. <br />14. RECORDING EXISTING CONDITIONS - EXISTING CONDITIONS THROUGHOUT THE PROJECT SITE THAT ARE LOCATED WITHIN <br />THE PUBLIC RIGHT -OF -WAV OR CITY MAINTAINED EASEMENTS SHALL BE PHOTOGRAPHED AND VIDEOTAPED BY THE <br />CONTRACTOR BEFORE STARTING CONSTRUCTION. RECORDING SHALL INCLUDE AND SHOW EVERY DETAIL OF EXISTING <br />IMPROVEMENTS, INCLUDING THE CURRENT CONDITION OF THE CURB, GUTTER, SIDEWALK, SIGNS, LANDSCAPING, <br />STREETLIGHTS, STRUCTURES NEAR THE PROJECT INCLUDING THE FACE OF BUILDINGS, CANOPIES, SHADES, FENCES, AND <br />ANY OTHER FEATURES WITHIN THE LIMITS OF WORK. PHOTOS AND VIDEOTAPE SHALL BE DELIVERED TO THE ENGINEER. <br />15. PRIOR TO CONSTRUCTION ACTIVITY AND WITHIN 30 DAYS OF PROJECT AWARD, ALL SURVEY MONUMENTS THAT MAY <br />POTENTIALLY BE DISTURBED DURING CONSTRUCTION, MUST BE LOCATED AND REFERENCED BY A LICENSED LAND <br />SURVEYOR AND A CORNER RECORD OR RECORD OF SURVEY MUST BE FILED WITH THE COUNTY SURVEYOR. ANY SURVEY <br />MONUMENTS DISTURBED DURING THE COURSE OF CONSTRUCTION MUST BE REESTABLISHED BY A LICENSED LAND <br />SURVEYOR, A NEW MONUMENT SET, AND ANOTHER CORNER RECORD OR RECORD OF SURVEY FILED WITH THE COUNTY <br />SURVEYOR (LAND SURVEYORS' ACT SECTION 8771). CONTRACTOR IS RESPONSIBLE FOR REPLACEMENT AND RECORDING OF <br />SURVEY MONUMENTS DISTURBED DURING CONSTRUCTION IN ACCORDANCE WITH CITY OF TRACY OR SAN JUAQUIN <br />COUNTY STANDARD PLANS AND SPECIFICATIONS, WHICHEVER IS APPLICABLE. <br />EROSION & SEDIMENT CONTROL MEASURES <br />1. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE EFFECTIVE FOR THE DURATION OF CONSTRUCTION <br />2. AFTER THE UNDERGROUND STORM DRAIN SYSTEM IS INSTALLED, THE CATCH BASINS WILL BE INSTALLED (AS SOON AS <br />PRACTICAL) AND ROCK BARRIER BAGS WILL BE PLACED AROUND THOSE CATCH BASINS AS SHOWN ON THIS PLAN UNTIL <br />THIS SITE IS PAVED. <br />3. SHOULD THE ON-SITE STORM DRAINS NOT BE INSTALLED COMPLETELY BY OCTOBER 15, THE CONTRACTOR SHALL <br />CONSTRUCT TEMPORARY SEDIMENT BASINS AT THE EXISTING STORM PIPES STUBBED TO THE SITE. <br />4. PERSON RESPONSIBLE FOR IMPLEMENTATION OF EROSION AND SEDIMENTATION PLAN. <br />NAME: TBD <br />COMPANY: TBD <br />ADDRE.SS:TBD <br />PHONE: TBD <br />S. THE CONTRACTOR SHALL PLACE 3"-6" COARSE AGGREGATE AS A GRAVEL ROADWAY 0 2" MIN. THICK FOR THE FULL WIDTH <br />AND 50 FEET LONG) AT EACH D/W ENTRANCE TO SITE. ANY MUD THAT IS TRACKED ONTO PUBLIC STREETS SHALL BE <br />REMOVED THAT SAME DAY AND AS REQUIRED BY THE CITY OF TRACY. <br />6. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED UNTIL DISTURBED AREAS ARE STABILIZED AND CHANGES TO THIS <br />EROSION AND SEDIMENT CONTROL PLAN SHALL BE MADE TO MEET FIELD CONDITIONS ONLY WITH THE APPROVAL OF OR <br />AT THE DIRECTION OF THE QSP. <br />7. ALL PAVED AREAS SHALL BE KEPT CLEAR OF EARTH MATERIAL AND DEBRIS. THE SITE SHALL BE MAINTAINED SO AS TO <br />MINIMIZE SEDIMENT -LADEN RUN-OFF TO ANY STORM DRAINAGE SYSTEM. <br />B. THIS PLAN COVERS ONLY THE FIRST WINTER FOLLOWING GRADING. PLANS ARE TO BE RESUBMITTED FOR CITY APPROVAL <br />PRIOR TO THE SEPTEMBER FIRST OF EACH SUBSEQUENT YEAR UNTIL THE SITE IMPROVEMENTS ARE ACCEPTED BY THE CITY. <br />9. ALL EROSION CONTROL FACILITIES MUST BE INSPECTED AND REPAIRED AT THE END OF EACH WORKING DAY DURING THE <br />RAINY SEASON. <br />10. SEDIMENT BASINS SHALL BE CLEANED OUT WHENEVER SEDIMENT REACHES THE SEDIMENT CLEANOUT LEVEL INDICATED ON <br />THE PLANS. <br />11. BORROW AREAS AND TEMPORARY STOCKPILES SHALL BE PROTECTED WITH APPROPRIATE EROSION CONTROL MEASURES TO <br />THE SATISFACTION OF THE CITY ENGINEER. <br />12. ALL CUT AND FILL SLOPES ARE TO BE PROTECTED TO PREVENT OVERBANK FLOW. <br />13. INLETS WHICH ARE NOT USED IN CONJUNCTION WITH ROCK BARRIER BAGS OR SEDIMENT BASINS SHOULD BE COVERED, OR <br />OTHERWISE ADJUSTED TO PREVENT INFLOW, UNLESS THE AREA DRAINED 15 UNDISTURBED OR STABILIZED. <br />14. THIS PLAN MAY NOT COVER ALL THE SITUATIONS THAT ARISE DURING CONSTRUCTION DUE TO ANTICIPATED FIELD <br />CONDITIONS. VARIATIONS MAY BE MADE TO THE PLAN IN THE FIELD SUBJECT TO THE APPROVAL OF THE ENGINEER. <br />15. DETAILS FOR THE CONSTRUCTION OF FACILITIES ARE SHOWN ON THESE PLANS. <br />16. MASS GRADED AREAS SHALL HAVE A SOIL BINDER APPLIED UPON COMPLETION OF GRADING AS SPECIFIED IN THE SWPPP <br />17. A SWPPP HAS BEEN PREPARED SPECIFICALLY FOR THIS PROJECT. CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTING SWPPP <br />INCLUDING QSP SERVICES. <br />18. CONTRACTOR SHALL HYDROSEED ALL DISTURBED AREAS NOT RECEIVING FINAL LANDSCAPING WITH A NATIVE <br />NON -IRRIGATED MIX. USE VALLEY HABITAT - TRACY MIX BY PACIFIC COAST SEED. <br />SAN JOAQUIN COUNTY GENERAL NOTES: <br />1. AN ENCROACHMENT PERMIT FROM SAN JOAQUIN COUNTY IS REQUIRED FOR ALL WORK WITHIN THE COUNTY'S <br />RIGHT-OF-WAY. <br />2. WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE SAN JOAQUIN COUNTY IMPROVEMENT STANDARDS AND THE <br />CALTRANS STANDARD SPECIFICATIONS. ANY PROPOSED MODIFICATIONS TO THE PLANS SHALL BE APPROVED BY THE <br />COUNTY PRIOR TO PERFORMING THE WORK. <br />3. THE CONTRACTOR SHALL SUBMIT TRAFFIC CONTROL PLANS FOR ALL SIGNING, DETOURS, AND ANY LANE CLOSURE <br />IMPACTING COUNTY RIGHT -OF -WAV. TRAFFIC CONTROL PLANS SHALL BE SUBMITTED FOR APPROVAL TWO WEEKS PRIOR <br />TO THE CLOSURE DATE. <br />4. TRAFFIC CONTROLS FOR ALL ROADS SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION. DURING WORKING HOURS, <br />TWO-WAY TRAFFIC CONTROL SHALL BE MAINTAINED WITH ONE LANE OPEN AND APPROPRIATE FLAGGERS. TRAFFIC <br />CONTROL DELAYS SHALL NOT EXCEED 15 MINUTES. TWO WAY TRAFFIC SHALL BE MAINTAINED DURING NON -WORKING <br />HOURS WITH EXCAVATED AREAS RACKFILLED OR PLATED. <br />S. ACCESS TO ALL PROPERTIES SHALL BE MAINTAINED AT ALL TIMES EXCEPT WHEN WORK IS OCCURRING AT THE ACCESS <br />POINT. MINIMAL DELAYS WILL BE ALLOWED TO PROVIDE ACCESS WITHIN THE WORK ZONE AREA. DRIVEWAY ACCESS SHALL <br />BE FULLY RESTORED AT THE END OF EACH WORKDAY. DRIVEWAYS DISTURBED BY THE CONTRACTOR SHALL BE REPLACED <br />WITH IN-KIND OR BETTER MATERIALS. <br />6. RESIDENTS AND BUSINESSES SHALL BE NOTIFIED IN WRITING, AS APPROVED BY THE COUNTY, 48 HOURS IN ADVANCE OF <br />ANY IMPACTS TO THEIR ACCESS. <br />7. ANY AREAS WHERE PARKING IS TO BE RESTRICTED SHALL HAVE SIGNS NOTING THE RESTRICTIONS IN PLACE AT LEAST 48 <br />HOURS IN ADVANCE. <br />8. ALL DESTROYED OR OBLITERATED PAVEMENT MARKINGS MUST BE REPLACED IN KIND BY THE PERMITTEE. TYPICAL <br />PAVEMENT MARKINGS INCLUDE BUT NOT LIMITED TO LANE LINES, CENTERLINES, STOP AND STOP AHEAD LEGENDS, LIMIT <br />LINES, RAISED PAVEMENT MARKERS AND MISCELLANEOUS DELINEATORS. <br />9. ALL STANDARD ROADWAY STRIPING AND SIGNAGE SHALL BE CLEARLY VISIBLE, MAINTAINED AND RESTORED THROUGHOUT <br />THE CONSTRUCTION ZONE DURING AND AFTER THE PROJECT. <br />10. IN ADDITION TO STANDARD DUST CONTROL MEASURES, STREETS SHALL BE MAINTAINED IN A CLEAN CONDITION, FREE OF <br />DIRT, MUD AND DEBRIS DURING CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHALL PROVIDE DAILY, OR AS NEEDED, <br />STREET SWEEPING USING A MODERN MECHANICAL OR VACUUM -ASSISTED STREET SWEEPER. <br />11. THE CONTRACTOR SHALL NOT CONDUCT CONSTRUCTION OPERATIONS IN RAIN OR HEAVY FOG CONDITIONS. <br />12. THE CONTRACTOR WILL BE RESPONSIBLE FOR SCHEDULING INSPECTION AND TESTING OF ALL FACILITIES CONSTRUCTED <br />UNDER THIS CONTRACT WITH A MINIMUM 24 HOUR NOTICE TO THE COUNTY. ALL TESTING MUST CONFORM TO THE <br />STANDARD SPECIFICATIONS. <br />13. THE CONTRACTOR IS RESPONSIBLE FOR THE PRESERVATION OF SURVEY MONUMENTS LOCATED WITHIN THE WORK AREA. <br />PRIOR TO THE START OF CONSTRUCTION, SURVEY MONUMENTS THAT POTENTIALLY MAY BE DISTURBED SHALL BE LOCATED <br />AND REFERENCED BY A LICENSED LAND SURVEYOR, AND A CORNER RECORD FILED WITH THE COUNTY SURVEYOR. ANY <br />SURVEY MONUMENTS DISTURBED DURING THE COURSE OF CONSTRUCTION SHALL BE REESTABLISHED BY A LICENSED LAND <br />SURVEYOR AND ANOTHER CORNER RECORD FILED WITH THE COUNTY SURVEYOR. (LAND SURVEYORS' ALT SECTION 8771) <br />14. ALL PAVING WORK MUST CONFORM TO THE CALTRANS STANDARD SPECIFICATIONS SECTION 39. HOT MIX ASPHALT (HMA) <br />SHALL BE TYPE A. ASPHALT BINDER USED IN HMA MUST BE PG 64-10 AND AGGREGATE MUST COMPLY WITH THE Pz-INCH <br />HMA TYPE A GRADATION TABLE. ASPHALT PLACEMENT SHALL CONFORM TO THE FOLLOWING SCHEDULE: <br />Top Next LowerAll Other Lower <br />Layer Thickness Layer Thickness Layer Thickness <br />Total Thickness N0. O7 foot foot foot) <br />Shown on Plans LayersMax. Min. Max. Min. Max. <br />0.20 - foot or less 1 <br />0.25 loot 2 0.12 0.13 0.12 0.13 <br />0.30 - 0.45 foot 2 0.15 0.20 0.15 0.25 <br />0.46 - foot or more b 0.15 0.20 0.15 0.25 0.15 0.4 <br />a When Gemynthetrc Pavement Interlayer (Paving Fabm). mat or grid* shown to be placed between <br />layers of HMA, the thickness of HMA above the Geosynthetic Pavement Interlayer (Pavmg Fabric) must <br />be cortsidered to be the'Tofal Thickness Shown on Pins' for the purpose of spreading and compacting <br />the HMA above the Geosynthetic Pavement Intedayer (Paving Fabric). The minimum M thickness of <br />HMA over Geosyntheoc Pave=ni IMedayer (Paving Fabrx), mat or grid mull be 0 12 foot <br />b At least 2 layem must be placed d total thickness fs 0 45 -foot At least S layers must be placed if <br />toil th,ckrress m more Nan 045 - foot and less than 0.90. foot At least 4 layers must be paced if total <br />thickness ,s 0.90 - foot or more For Miscellaneous Areas or Pavement Repair, M least 2 layers must be <br />placed K tail thickness ,s 0.50 foot <br />15. AGGREGATE BASE AND SHOULDERS MUST BE CLASS 2 MEETING THE 14" MAXIMUM AGGREGATE GRADING. COMPACT EACH <br />LAYER TO AT LEAST 95 PERCENT RELATIVE COMPACTION. <br />F00 <br />QBOFESSI <br />No.7 7 <br />a} <br />V OF CALIF <br />SHEET <br />C2.1 <br />OF 15 SHEETS <br />Z <br />CL <br />CL <br />I - <br />Z <br />LiJ <br />2 <br />W <br />i <br />Fr_ <br />W <br />W <br />Q <br />O <br />Z <br />_2 <br />DO <br />Qm <br />O <br />W <br />W <br />J <br />U <br />N <br />SHEET <br />C2.1 <br />OF 15 SHEETS <br />