My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2017_PS-1700501 thru PS-1701000_ - PS-1700586
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2017
>
PS-1700501 thru PS-1701000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2017_PS-1700501 thru PS-1701000_ - PS-1700586
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2024 11:20:25 AM
Creation date
6/13/2024 11:18:19 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1700586
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2017
Notes2
14900 W. Schulte Road, Tracy
Type - Permit Process
Roadway Widening
Address
3130 Airway Avenue, Costa Mesa, CA 92626
Application
Net Development
Supplemental fields
Cross Ref
PWP791705
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IY.�iiIiI�F'f �. <br />SPECIAL CONDITIONS FOR <br />ENCROACHMENT PERMIT <br />February 22, 2018 <br />1. Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes. <br />Two-way traffic shall be maintained during non -working hours with excavated areas backfilled or <br />plated. During working hours, two-way traffic control shall be maintained with one lane open and <br />appropriate flaggers. The contractor shall submit traffic control plans for all signing, detours, and <br />any lane closure impacting County right-of-way. Traffic control plans shall be submitted two <br />weeks prior to the closure date. <br />2. Access to all properties shall be maintained at all times except when work is occurring at the <br />access point. Minimal delays will be allowed to provide access within the work zone area. <br />Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br />contractor shall be replaced with in-kind or better materials. <br />3. Residents and businesses shall be notified in writing, as approved by the County, 48 hours in <br />advance of any impacts to their access. <br />4. School Buses shall be passed through the work zone with minimal delays. <br />5. All destroyed or obliterated pavement markings must be replaced in kind by the permittee. Typical <br />pavement markings include but not limited to lane lines, centerlines, stop and stop ahead <br />legends, limit lines, raised pavement markers and miscellaneous delineators. <br />6. The Permittee is responsible for the preservation of survey monuments located within the area of <br />work herein permitted. Prior to the start of construction, survey monuments that potentially may <br />be disturbed shall be located and referenced by a Licensed Land Surveyor, and a Corner Record <br />filed with the County Surveyor. Any Survey Monuments disturbed during the course of <br />construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed <br />with the County Surveyor. (Land Surveyors' Act Section 8771) <br />7. The contractor shall use San Joaquin County Improvement Standard R-29 when backfilling <br />trenches within the County right-of-way. Where the existing road structural section is below <br />standard, a minimum section of 3 inches of asphalt concrete over 8 inches of aggregate base <br />shall be required. <br />8. Paving for trench repair or road resurfacing shall be per Caltrans' specifications and shall not <br />occur between November 1 and March 31, without prior authorization from the San Joaquin <br />County Department of Public Works Field Engineering Division, contact them at 209-953-7421. <br />9. No paving joints are allowed within paved shoulder; contractor shall pave all the way to outer <br />edge of paved shoulder. <br />10. Class II Aggregate Base shoulder backing is required from the edge of pavement, a minimum of <br />4 -inches thick by 4 -feet wide. <br />11. Contractor shall establish existing roadway and drainage grades within the construction area. <br />Any repair to roadways and adjacent areas shall match existing grades. Any proposed grade <br />changes shall receive prior approval from County. <br />
The URL can be used to link to this page
Your browser does not support the video tag.