Laserfiche WebLink
NOTES: <br />1. <br />2. <br />If the distance between cross—cuts are less then 150 the entire area between <br />corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br />The resurfacing requirements shall be in addition to Countv Standard Drawina No. <br />R-29. <br />3. Resurfacing for Bell Holes shall meet these <br />the shoulder or lane, only that area shall b <br />4. If cross—cutting is performed on Local Roac <br />Coat for that half of the roadway containinc <br />resurfacing. Section 2-5.03 (B-2). <br />Paved Shoulder <br />Worlong for YOU <br />C3� <br />W <br />requirements, If excavation occurs within <br />resufaced as shown, <br />s it intervals less then 150' a Seal <br />the trench can be used in lieu of <br />w <br />C0UNVU U08 D tgAYS <br />COUNTY OF SAN JOAQUIN <br />DEPARTME <br />NT OF PUBLIC WORKS <br />No. <br />Date: DEC 2014 Revision Descriation I Date <br />