My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2018_PS-1802001 thru PS-1802500_ - PS-1802322
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2018
>
PS-1802001 thru PS-1802500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2018_PS-1802001 thru PS-1802500_ - PS-1802322
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2024 10:25:48 AM
Creation date
6/14/2024 10:24:37 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1802322
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2018
Notes2
W/S of Lammer Rd. 2800' S/O Valpico Rd.
Type - Permit Process
Relocation Reg Station
Install RTU Cabinet
(3) Vaults
Address
PO Box 930, Stockton,CA 95201
Application
Pacific Gas & Electric-Stockton
Supplemental fields
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Special Conditions for <br />ENCROACHMENT PERMIT <br />-2- <br />11. The contractor shall use San Joaquin County Improvement Standard R-29 when backfilling <br />trenches within the County right-of-way. Where the existing road structural section is below <br />standard, a minimum section of 3 inches of asphalt concrete over 8 inches of aggregate base <br />shall be required. <br />12. Class II Aggregate Base shoulder backing is required from the edge of pavement, a minimum of <br />4 -inches thick by 44eet wide. <br />13. Contractor shall establish existing roadway and drainage grades within the construction area. <br />Any repair to roadways and adjacent areas shall match existing grades. Any proposed grade <br />changes shall receive prior approval from County. <br />14. Above ground vaults, panels and/or other similar facilities will be allowed within the right-of-way if <br />located as far to the outside edge as possible. Utility vaults shall be located a minimum of 4)41 <br />from edge of pavement. <br />15. County roads shall be kept clean from mud and debris at all times along the access points and <br />work zone areas during entire project. All standard roadway striping and signage shall be clearly <br />visible, maintained and restored throughout the construction zone during and after the project. <br />16. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br />free of dirt, mud and debris during construction activities. The contractor shall provide daily, and <br />as determined to be necessary by County inspectors, street sweeping using a modern <br />mechanical or vacuum -assisted street sweeper. <br />17. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.