Laserfiche WebLink
2. Cross• -cutting is allowed under the same conditions as Section 2- <br />5.02(B)(3). if cross -cuts occur within the 150 feet minimum interval, <br />resurfacing may be substituted with a slurry seal for that half of <br />the roadway. (See County Standard Drawing No. R-36). <br />2 5.0� Exceptions <br />Excavation is prohibited in newly renovated County roadways for three (3) <br />years after a notice of completion has been filed for a roadway improvement <br />project, or a new roadway has been accepted. The Director of Public Works <br />may approve exceptions that are in the best interest of the public, including <br />but not limited to: <br />A. An emergency fhat endangers life or property. <br />B. For repair or modificafiion to prevent interruption of essential utility <br />service. <br />C. For relocation work that is mandated by County, State or Federal <br />law. <br />D. For service for buildings where no other reasonable ineans of <br />providing service exists. <br />E. For potholing fo verify ufiilifiy depth or location. <br />F. For frenchless excavations greater than three feet in depth of cover <br />over the utility facility, and not requiring a significant surface <br />incision greater than industry bore pit standards. <br />Exceptions must be requested and submitted in wrifing to the Department. <br />Payment of a nonrefundable processing fee is also required. Exceptions <br />will be reviewed using the Departments Action Approval process, which <br />requires the recommendation of a Deputy Director. <br />Q•3 <br />