My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2018_PS-1803501 thru PS-1804000_ - PS-1803994
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2018
>
PS-1803501 thru PS-1804000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2018_PS-1803501 thru PS-1804000_ - PS-1803994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2024 2:37:28 PM
Creation date
6/14/2024 2:33:28 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1803994
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2018
Notes2
3511 E. Cherokee Road, Stockton
Type - Permit Process
Gas Station-Driveways & Median
Address
PO Box 1403, Lodi,CA 95241
Application
Wendt Construction
Supplemental fields
Cross Ref
PWP7110005
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PS -18o3994 <br />SPECIAL CONDITIONS FSR <br />ENCROACHMENT PERMIT <br />NoVenIbel 20, 2018 <br />1. Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes. <br />Two-way traffic shall be maintained during non -working hours with excavated areas backfilled or <br />plated. During working hours, two-way traffic control shall be maintained with one lane open and <br />appropriate flaggers. The contractor shall submit traffic control plans for all signing, detours, and <br />any lane closure impacting County right -of --way. Traffic control plans shall be submitted two <br />weeks prior to the closure date. <br />2. Access to all properties shall be maintained at all times except when work is occurring at the <br />access point. Minimal delays will be allowed to provide access within the work zone area. <br />Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br />contractor shall be replaced with in-kind or better materials. <br />3. Residents and businesses shall be notified in writing, as approved by the County, 48 hours in <br />advance of any impacts to their access. <br />4. Any areas where parking is to be restricted shall have signs noting the restrictions in place at <br />least 48 hours in advance. <br />5. School Buses shall be passed through the work zone with minimal delays. <br />6. Existing fences shall not be removed without written consent of the property owner. Such consent <br />shall be submitted to the County prior to the removal. Fences removed shall be restored with in- <br />kind or better materials. Restored fences shall not encroach into County right-of-way. <br />7. All destroyed or obliterated pavement markings must be replaced in kind by the permittee. Typical <br />pavement markings include but not limited to lane lines, centerlines, stop and stop ahead <br />legends, limit lines, raised pavement markers and miscellaneous delineators. <br />8. The Permittee is responsible for the preservation of survey monuments located within the area of <br />work herein permitted. Prior to the start of construction, survey monuments that potentially may <br />be disturbed shall be located and referenced by a Licensed Land Surveyor, and a Corner Record <br />filed with the County Surveyor, Any Survey Monuments disturbed during the course of <br />construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed <br />with the County Surveyor. (Land Surveyors' Act Section 8771) <br />9. Trenches shat( be maintained in a smooth and even condition to the satisfaction of the County <br />throughout the project limits at all times. <br />10. All trenches shall be completely backfilled or shored and plated at the end of each workday, and <br />the roadway restored to two-way traffic. If plating is to be used, a trench shoring and plating plan <br />suitable for traffic loadings shall be prepared by a registered civil engineer and submitted for prior <br />approval by the County. <br />11. The contractor shall use San Joaquin County Improvement Standard R-29 when backfilling <br />trenches within the County right-of-way. Where the existing road structural section <br />4 <br />s below <br />
The URL can be used to link to this page
Your browser does not support the video tag.