My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2019_PS-1903001 thru PS-1903500_ - PS-1903155
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2019
>
PS-1903001 thru PS-1903500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2019_PS-1903001 thru PS-1903500_ - PS-1903155
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2024 2:57:55 PM
Creation date
6/14/2024 2:56:56 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1903155
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2019
Notes2
E/S Hubbard Rd. 1,667' N/O Cherokee Rd.
Type - Permit Process
Bell Hole
Bore (up to 12 inch Dia)
Address
5555 E. Olive RM#300III, Fresno,CA 93727
Application
AT&T-Fresno
Supplemental fields
Cross Ref
PWP730079
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3616 HUI=F BARD RD. <br />HUBBARD RD. & CHEROKEE RD. <br />AERIAL CROSSING, PL. GB & ANCHOR <br />WORK AREA 7 OF 7 <br />PHASE 7 OF 3 <br />SHOULDER C30A <br />ON NPE III <br />CLOSED BARRICADE <br />LOC 15 <br />ROADNWORK T .A.N, S 4AoT <br />c2o-2 POLE F100' SHOULDER T <br />PL ANCHO R��� <br />PL. GB <br />.O.P. 40' MAX. <br />20' MAX, ? <br />r <br />ROAD <br />WORK <br />AHEAD <br />w2o-1 <br />LOCATION MAP <br />WORK AREA <br />r� <br />V Ci <br />Cnwch Of GDd <br />• (swNah day) Stocttm <br />al <br />oAirgas Slur• <br />Hdlantl 0.�IgnmNrt <br />8 Brake N <br />OG LIN <br />ROAD <br />WORK <br />AHEAD <br />W20-1 <br />3816 HUBBARD RD. <br />END <br />ROAD WORK <br />/ G20-2 <br />�Q. SHOULDE C30A <br />O CLOSED <br />ON TYPE III <br />BARRICADE <br />SPEED <br />4o CHEROKEE RD. <br />SHOULDER <br />WORK <br />T.A.N.S.A.T. <br />® W21-5 <br />PC)I E 110' SHOULDER TAPER 250' <br />SPEED <br />4o CHEROKEE 50 <br />RD. <br />moo N <br />MAX. <br />CONTACT PROPERTY OWNERS) 72 <br />HOURS PRIOR TO START OF WORK, <br />ACCESS TO DRIVEWAYS MUST BE <br />MAINTAINED AT ALL TIMES, <br />ROAD <br />WORK <br />AHEAD <br />E '- <br />LI <br />END <br />ROAD WORK <br />G20-2 <br />LEGEND <br />=PORTABLE FLASHIPIG BEACON IP. F. B.) <br />.�-1 =TYPE III BARRICADE W/SIGN (5'H z 4'W) <br />}� =TYPE II BARRICADE W/SIGN (3'H x 2'W) <br />• = 28" (11cm) TRAFFIC CONES W/ 13" )5cm) REFLECTIVE SLEEVE <br />FOR DAY/NIGHT USE OR DELINEATORS IF DAY USE ONLY <br />T =TRAFFIC CONE WITH CLIP ON SIGN <br />j =TYPEI Wt SIGN <br />b =EXISTING SIGN <br />O=SIGNALIZED INTERSECTION <br />LASHING ARROWBOARD <br />=HIGH LEVEL WARNING DEVICE (FLAGTREE) <br />•} = FLAGGER <br />TANSAT =TOW AWAY NO STOPPING ANY TIME <br />® =EXISTING DRIVEWAY <br />® =WORK ZONE (ACTIVITY AREA) LIMITS <br />y =DI RECTION OF TRAFFIC <br />ISSUE I DATE <br />1 08-10-19 <br />2 <br />MAINTAIN DRIVEWAY ACCESS <br />AT ALL TIMES <br />PHASE 1 OF 3 <br />HYPE OF CONSTRUCTION: <br />AERIAL CROSSING , PL. GB 0( ANCHOR <br />JOB NUMBER: /'1V 1 IV <br />V LM <br />PAGE: TC -Y OF SCALE: <br />TC -3 1 pan <br />
The URL can be used to link to this page
Your browser does not support the video tag.