SAVE THESE INSTRUCTIONS
<br />SLIM I I tR MOUNTING (see Fig. 1)
<br />1. Luminaire is intended to be mounted to a 2 318" od (2"pipe size) x min. 5"
<br />long tenon.
<br />2.Open or remove door (wiring instructions step #2).
<br />3. With power disconnected, slip luminaire over tenon, passing field supply wires
<br />through into luminaire. Adjust the (6) set screws to level luminaire, then tighten
<br />all (6) set screws to 150 in -Ib in an alternating fashion. Recheck torque on all
<br />set screws.
<br />4. Proceed to the wiring instructions section below.
<br />ARM MOUNTING (see Fig° 2>
<br />1. Ensure that the power is disconnected.
<br />2. Ensure that pole is drilled per the pattern at right, remove any burrs or sharp
<br />edges from the center wire way hole.
<br />3. Insert the field supply wires through the wire way of backplate (item 2), and
<br />through the pole wire way hole, insert backplate through the top of the pole,
<br />oriented as shown, and align holes in backplate with holes in pole.
<br />4. Insert (2) rods (items 5) through the pole holes and thread into backplate
<br />(item 2), until flush with inward -facing surface of backplate.
<br />5. Slip adapter plate (item 3, round poles only, curved side facing pole) and
<br />rectangular arm (item 4) over the (2) rods (items 5) making sure the rods run
<br />through the extruded grooves. pass field supply wires through the arm.
<br />6. Open or remove luminaire door (wiring instructions step #2).
<br />7, Insert the field supply wires through the wire way hole in the luminaire
<br />housing, and the (2) rods (items 5) through the corresponding mounting holes.
<br />8. Secure the housing to the end of the arm using (2) each flat washer, lock
<br />washer, and nut (items 6, 7 and 8), if necessary, adjust rods (item 5) so that
<br />the threads completely penetrate backplate and nuts, torque nuts to 150 in -Ib.
<br />9. Proceed to the wiring instructions section below.
<br />Maintenance Notes
<br />FIGURE 1
<br />•
<br />'Fr SET SCREWS
<br />was --b
<br />FIGURE 2
<br />A
<br />2 1l2" 0 3/8"
<br />0 5/8"
<br />03/8"
<br />VIEW A
<br />Bacl<plate must be
<br />shown as oriented
<br />1. Disconnect power before servicing. note especially that drivers must be powered down at least one minute
<br />before plugging or unplugging any connectors on the output side, or led damage may result.
<br />2. The door contains the drivers) and transformer, if applicable, and can be removed by referring to wiring
<br />instructions step #2.
<br />Warning: see note 1.
<br />3. The photocell receptacle, if so equipped, may be rotated by loosening the two screws on top, turning to desired
<br />position, and securely re -tightening screws.
<br />93058569 Rev A
<br />2041 SBIh Ave Clr E, eratlenton, FL 34203 800 345-4928 ON•
<br />l ) www.beaconproducis.com '
<br />SAVE THESE INSTRUCTIONS
<br />PK2 MOUNTING (see Fig. 3 and Fig. 4)
<br />1. Luminaire Is intended to be mounted to a 2 3/8" OD (2"pipe size) x min. 5" long tenon.
<br />2, Open or remove door (wiring instructions step #2).
<br />3. With power disconnected, slip luminalre over tenon, passing field supply wires through Into luminaire. Remove knuckle cover to weave wiring
<br />through the swivel area. Adjust the (4) set screws snug tight, then torque all (4) set screws to 150 in -Ib In an alternating fashion. Recheck torque on
<br />all set screws.
<br />4. With cover removed, loosen adjustment screw to change positioning angle, tighten screw securely and replace cover with all gaskets/seals in
<br />original position to maintain weather tightness, do not adjust over 30 degrees above horizontal.
<br />Fixtures with sensors should be mounted parallel with ground (horizontal) in order to not diminish range and accuracy of sensors.
<br />5. Proceed to the wiring instructions section below.
<br />FIGURE 3
<br />Vertical PK2 Mounting '
<br />NOTE DO NOT EXCcrD
<br />300 UPWARD ANGLE.
<br />Note that in vertical orientation that 600 0
<br />shouId line up with indicator line. 11
<br />FIGURE 4
<br />K2 Mounting
<br />Horizontal P
<br />NOTE: DO NOT EXCEED
<br />300 UPWARD ANGLE.
<br />ADJUSTMENT SCRE1
<br />COVER WITf
<br />DEGREE TICK MARK
<br />ng Instructions (all mounting types)
<br />1. These instructions presume that the luminaire has already been mounted (as per above) with field supply wiring (from pole) extended into
<br />driver/wiring compartment. Disconnect power before perf
<br />orming these steps.
<br />2, Open door by loosening two key -slotted screws, pushing door forward, and swinging down. If desired, door may then be removed by unplugging two
<br />connectors and lifting door out.
<br />3. Check supply voltage
<br />against luminaire rating label. Supply Wring must be 12-18 gauge for use with terminal block. Strip supply wire ends 3/8"-
<br />7/16", pass through supplied open cable tie and hook up to terminal block. Refer to the factory wiring installed at the opposite side of the terminal
<br />block, matching the hot wire to factory black wire, neutral (or opposite phase) to factory white wire, and ground to factory green wire. Connection is
<br />made by pressing each terminal block tab with screwdriver or finger, inserting wire, and releasing tab, note: although there are extra spaces on the
<br />terminal block, the luminaire is not intended or rated for pass-through wiring connections.
<br />4. Pull cable tie closed to secure wiring. Work out any slack in wiring between cable tie and pole/mounting surface,
<br />5. If Sheet
<br />door was removed, reconnect connectors if unplugged and orient door back In housing's door track so that wiring will be Inside housing when
<br />closed (see Fig. 5). Swing door to be horizontally flush with housing, sliding door backward so that screws are within slot portion of key -slot. Ensure
<br />wiring Is not pinched. Tighten two key -slotted screws to 30 in -lbs each (see Fig. 6).
<br />s. Turn on power and test luminalre.
<br />FIGURE 5 FIGURE 6
<br />/ � KEY -SLOT
<br />*I
<br />m
<br />VIEW B
<br />93056569 Rev A t4
<br />2041 551h Ave CIr E, Bradanlon, FL 34203 (B00) 345-4928 www.beamnproducls.wm ®" "�" '�"O
<br />Contractor:
<br />LENZ1 50LAR
<br />LENZI INCORPORATED
<br />51-15#1007527
<br />g47 N. CLUFF AVE, SUITE B I
<br />LODI, CA 95240
<br />(209) 224-5950
<br />www.lenzlcon5tructlonand5obr,com
<br />Project:
<br />SOLAR LIGHT POLE
<br />3222 COLLIER RD, EAST
<br />ACAMPO CA 95220
<br />Project Details:
<br />PV ARRAY: 550 W
<br />BATTERY BANK: 224 Ah, 5.4 kW
<br />REVISIONS
<br />DESCRIPTION
<br />DATE
<br />REV
<br />PERMIT SET
<br />12/31/2019
<br />A
<br />T1tle:
<br />VIPER INSTALL
<br />INSTRUCTIONS
<br />Sheet Number:
<br />D2,
<br />Sheet Slze:
<br />ANSI B- 17 11 X I I"
<br />DESIGN DRAFTING BY:
<br />AARON CARDWELL
<br />SepiSOlar
<br />POWER BY DESIGN
<br />Reviewed Approved by:
<br />CM
<br />
|