Laserfiche WebLink
NOTES. <br />1, <br />2, <br />If the distance between cross—cuts are less then 150 the entire area between <br />corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br />The resurfacing requirements shall be in addition to County Standard Drawinq No, <br />R-29. <br />3. Resurfacing for Bell Holes shall meet these <br />the shoulder or lane, only that area shall b <br />4. If cross—cutting is performed on Local Roa( <br />Coat for that half of the roadway containinc <br />resurfacing. Section 2-5.03 (B-2). <br />Poved Shoulder �►1 <br />Working for YOU <br />D_ <br />W <br />requirements. If excavation occurs within <br />resufaced as shown. <br />s at intervals less then 150' a Seal <br />the trench can be used in lieu of <br />TRENCH CUTTING POLICY <br />CROSS CUTTING OF <br />COUNTY ROADWAYS <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />Approved by: <br />No. <br />Date; DEC 2014 <br />Revision Descriotion Date <br />Std. Dwg. No. R-36 <br />