Laserfiche WebLink
� <br />1 <br />o <br />0 <br />_ <br />l <br />Dn <br />EC19-1614-13 <br />w <br />EC19-1614, D-1071cc <br />Ln <br />W <br />� <br />o FILERS LN;� <br />DFM-1614-02W <br />- z-i_'_�_- <br />♦,,� W TAYLOR RD <br />1 ��o <br />ECDA INVESTIGATION DIG <br />EC194614-A <br />ORDER #84007766 <br />I <br />rj <br />VICINITY MAP <br />LODI,CA <br />NOT TO SCALE <br />GENERAL NOTES: <br />CONTACT INFORMATION: <br />1. THIS DRAWING IS ISSUED FOR PERMIT. REFER TO CONTRACT DOCUMENTATION FOR ADDITIONAL CLARITY <br />3. COATING REMOVAL: <br />OF SCOPE OF WORK, <br />BEFORE REMOVING THE PIPE COATING ON PRE-1972 PIPE (DOES NOT INCLUDE PLASTIC TAPE OR FUSION <br />2. THIS DRAWING HAS BEEN CREATED BY REVIEW OF THE AS-BUILT DRAWINGS & RECORDS. ACCURACY IS <br />BONDED EPDXY COATINGS) THE FOLLOWING STEPS SHALL BE TAKEN: <br />MICH ELS, PROJECT MANAGER <br />DEPENDENT UPON THE SOURCE DOCUMENTS LISTED IN THE REFERENCE DOCUMENTS. <br />A. FOR ALL NON-EMERGENCY WORK, PRE-1972 PIPE WRAP MUST BE EVALUATED TO DETERMINE IF IT <br />Christopher Curtis (920)-392-9984 <br />3. UTILITIES SHOWN ON DRAWING ARE APPROXIMATE BASED UPON REVIEW OF PG&E DIG SHEET, DIGS <br />CONTAINS ASBESTOS PRIOR TO REMOVAL, <br />PLE, PG&E ENGINEER <br />BASIS MEMO, & GIs. CONTRACTOR TO CALL USA TO HAVE LOCATION OF THESE FACILITIES MARKED & <br />Be FOR EMERGENCY WORK ON PRE-1972 PIPE, ASSUME THE WRAP CONTAINS > 1% ASBESTOS UNTIL <br />Wayne Gilbert (925)-551-1849 <br />POTHOLE TO EXPOSE/VERIFY LOCATION. <br />THE WRAP CAN BE TESTED, <br />C. OBTAIN SAMPLES OF THE WRAP, & HAVE SAMPLES TESTED FOR ASBESTOS IN ACCORDANCE WITH <br />DA, PG&E ENGINEER <br />®AFETY <br />CONSTRUCTION NOTES: <br />WP 4711-01. <br />Assane Fall (925)-519-0812 <br />D. TEST RESULTS ARE TO BE INCLUDED WITH THE FINAL JOB PACKAGE. <br />SAFETY PLEDGE <br />1, UNDERGROUND SERVICE ALERT: CALL 811(1-800-227-2600) A MINIMUM OF 2 BUSINESS DAYS (NOT <br />E. FOLLOW PROCEDURE IN WP 4711-01 FOR REMOVAL OF PIPE WRAP. <br />I ALWAYS PUT SAFETY FIRST. <br />4. RESTORATION & CLEAN UP: <br />INCLUDING INITIAL DAY OF CONTACT) IN ADVANCE FOR THE MARKING OF UNDERGROUND UTILITIES, <br />A. RESTORATION OF PUBLIC STREETS, SIDEWALKS, CURBS, ETC, ABOVE PIPE BEDDING SHALL BE IN <br />I LOOK FOR AND ACT TO <br />INCLUDING ALL NON-UTILITIES BEFORE YOU DIG, GRADE, OR EXCAVATE, <br />ACCORDANCE WITH THE LATEST CITY, COUNTY, OR AGENCY STANDARDS, <br />RESOLVE UNSAFE SITUATIONS <br />2. UTILITY NOTES: <br />Be WHEREVER THERE ARE ROW CROPS, THE TOPSOIL SHALL BE REMOVED TO A DEPTH OF 12" & <br />SEQUENCE OF OPERATIONS: <br />I HELP AND ENCOURAGE <br />A. DIMENSIONS SHOWN ON THESE DRAWINGS ARE BASED ON THE BEST AVAILABLE INFORMATION <br />STORED ON SITE. UPON COMPLETION OF CONSTRUCTION, THE TOPSOIL SHALL BE RESTORED. TAKE <br />1. INSTALL BMPS. <br />OTHERS TO ACT SAFELY. <br />FROM SEVERAL SOURCES, & SHALL BE VERIFIED IN THE FIELD BY CONSTRUCTION PERSONNEL PRIOR <br />CARE TO PREVENT MIXING OF TOPSOIL & SUBSOIL. <br />2. EXCAVATE & EXPOSE PIPELINE AS SHOWN IN <br />LOCATION IMAGE(S) & <br />IDENTIFIED IN <br />TO EXCAVATION, <br />S. WELDING REQUIREMENTS: <br />ECDA DIG SHEET (FORM N). <br />Be THE INFORMATION SHOWN ON THESE DRAWINGS CONCERNING TYPE & LOCATION OF <br />A. INSTALL TEST STATIONS WITH THERMITE WELD CONNECTION IN ACCORDANCE WITH GAS T & D <br />3, COMPLETE PIPELINE INSPECTION IN ACCORDANCE WITH RMP-09 PROCEDURE <br />FOR <br />UNDERGROUND UTILITIES, PROPERTY LINES, & OTHER SUBSTRUCTURES IS NOT GUARANTEED TO BE <br />CORROSION CONTROL MANUAL 0-10, 0-10.1, & 0-10.2. <br />EXTERNAL CORROSION DIRECT ASSESSMENT. <br />MICHELS® <br />ACCURATE OR ALL-INCLUSIVE, UNLESS OTHERWISE NOTED. CONSTRUCTION PERSONNEL ARE <br />6. PAINTING & COATING REQUIREMENTS: <br />4. COMPLETE "H" FORM INSPECTION, <br />RESPONSIBLE FOR MAKING ALL DETERMINATIONS AS TO THE TYPE & LOCATION OF UNDERGROUND <br />A. ALL EXPOSED PIPE & FITTINGS ARE TO BE PAINTED IN ACCORDANCE WITH GAS STANDARD E-30. ALL <br />S. PERFORM REPAIRS AS NEEDED. <br />UTILITIES &OTHER SUBSTRUCTURES AS NECESSARY TO AVOID DAMAGE OR ENCROACHMENTS. <br />COATING ON BURIED PIPE & FITTINGS ARE TO BE APPLIED IN ACCORDANCE WITH GAS STANDARD <br />6, RECOAT THE PIPELINE IN ACCORDANCE WITH <br />GAS STANDARD E-35, <br />817 Main Street <br />C. PROSPECTING IS REQUIRED AHEAD OF WORK, <br />E-35. <br />7. COMPLETE DOCUMENTATION AS REQUESTED <br />BY THE PROJECT ENGINEER. <br />Brownsville, WI <br />D. ALL EXCAVATIONS WITHIN EXISTING STATIONS SHALL BE HAND DUG OR EXCAVATED USING SOFT <br />Be FOR COATING SELECTIONS ON BURIED PIPE, SEE DIRECT BURIAL COATING SELECTIONS TABLE. <br />Be BACKFILL & COMPACT EXCAVATION PER PERMIT STANDARDS, <br />(920) 583-3132 <br />DIG METHODS (e.g. VACUUM EXCAVATIONS OR SIMILAR). <br />7. DOCUMENTATION OF INSPECTION OF EXISTING PIPELINE: <br />9. INSTALL PG&E GAS WARNING DECALS & PIPELINE <br />WWW,michels.us <br />MARKER DECALS AS NEEDED. <br />WHENEVER EXISTING BURIED GAS FACILITIES ARE EXCAVATED DURING ENGINEERING OR DURING <br />10. REMOVE BMPS. <br />CONSTRUCTION, AN A-FORM (TD-411013-03401) SHALL BE COMPLETED FOR THE GENERAL INSPECTION. <br />11, RESTORE PROJECT SITE, <br />THIS ALSO APPLIES TO GAS FACILITIES BEING DEACTIVATED. THE COMPLETED A-FORM SHALL BE <br />SUBMITTED WITH THE FINAL JOB PACKAGE, <br />ISSUED <br />8, COPIES OF REFERENCE DRAWINGS ARE AVAILABLE TO FIELD PERSONNEL (PG&E, INSPECTION OR <br />FOR <br />CONTRACTOR) ON AN AS NEEDED BASIS, CONTACT THE CONTRACT ENGINEER IDENTIFIED IN CONTACTS <br />TO OBTAIN COPIES OF REFERNECE DRAWINGS, <br />PERMIT <br />APPROVED <br />GM <br />THIS DRAWING IS FOR <br />BY <br />SUPV <br />VISUAL REFERENCE ONLY, <br />DSGN <br />WARNING: <br />SCALE ISAPPROXIMATE. <br />EC194614 <br />D-1071 <br />THIS DOCUMENT CONTAINS CONFIDENTIAL, PROPRIETARY <br />• <br />LOCATION OF EXISTING <br />AND PROPOSED <br />A <br />INFORMATION THAT ISTHE SOLE PROPERTY OF PACIFIC <br />STRUCTURES IS <br />C <br />9/23/2013 <br />MODIFY WORK AREA SITE <br />86007766 <br />RML <br />DWN RML <br />DFM-1614-02& <br />DFM-1614-04 <br />GAS AND ELECTRIC COMPANY AND IS INTENDED FOR USE <br />APPROXIMATE, ANY AND <br />B <br />9/18/2019 <br />ISSUED FOR PERMIT <br />84007766 <br />RML <br />CHKD <br />ONLY BY AUTHORIZED PACIFIC GAS AND ELECTRIC <br />ALL DIMENSIONS ARE <br />ECDA <br />INVESTIGATION DIG <br />COMPANY EMPLOYEES & AGENTS. COPYRIGHT PACIFIC <br />below. <br />APPROXIMATE, ORIGINAL <br />q <br />8/,16/2019 <br />ISSUED FOR REVIEW <br />84007766 <br />RML <br />OK <br />N0. <br />DATE <br />DESCRIPTION <br />GM/SPEC <br />DWN <br />CHKD <br />SUPV <br />APVD BY <br />DATE 9/23/2019 <br />GAS AND ELECTRIC COMPANY. <br />Know what's <br />Call before dig. <br />DRAWING SIZE 11"x17". <br />IMAGESOURCE: <br />LODI, CALIFORNIA <br />you <br />y 9 <br />MICROSOFT BING <br />SHEET <br />C <br />SCALES <br />REVISIONS <br />AS SHOWN <br />84007766 <br />JOB # 192158 <br />1 OF 3 <br />REV <br />