<br />1
<br />o
<br />0
<br />_
<br />l
<br />Dn
<br />EC19-1614-13
<br />w
<br />EC19-1614, D-1071cc
<br />Ln
<br />W
<br />�
<br />o FILERS LN;�
<br />DFM-1614-02W
<br />- z-i_'_�_-
<br />♦,,� W TAYLOR RD
<br />1 ��o
<br />ECDA INVESTIGATION DIG
<br />EC194614-A
<br />ORDER #84007766
<br />I
<br />rj
<br />VICINITY MAP
<br />LODI,CA
<br />NOT TO SCALE
<br />GENERAL NOTES:
<br />CONTACT INFORMATION:
<br />1. THIS DRAWING IS ISSUED FOR PERMIT. REFER TO CONTRACT DOCUMENTATION FOR ADDITIONAL CLARITY
<br />3. COATING REMOVAL:
<br />OF SCOPE OF WORK,
<br />BEFORE REMOVING THE PIPE COATING ON PRE-1972 PIPE (DOES NOT INCLUDE PLASTIC TAPE OR FUSION
<br />2. THIS DRAWING HAS BEEN CREATED BY REVIEW OF THE AS-BUILT DRAWINGS & RECORDS. ACCURACY IS
<br />BONDED EPDXY COATINGS) THE FOLLOWING STEPS SHALL BE TAKEN:
<br />MICH ELS, PROJECT MANAGER
<br />DEPENDENT UPON THE SOURCE DOCUMENTS LISTED IN THE REFERENCE DOCUMENTS.
<br />A. FOR ALL NON-EMERGENCY WORK, PRE-1972 PIPE WRAP MUST BE EVALUATED TO DETERMINE IF IT
<br />Christopher Curtis (920)-392-9984
<br />3. UTILITIES SHOWN ON DRAWING ARE APPROXIMATE BASED UPON REVIEW OF PG&E DIG SHEET, DIGS
<br />CONTAINS ASBESTOS PRIOR TO REMOVAL,
<br />PLE, PG&E ENGINEER
<br />BASIS MEMO, & GIs. CONTRACTOR TO CALL USA TO HAVE LOCATION OF THESE FACILITIES MARKED &
<br />Be FOR EMERGENCY WORK ON PRE-1972 PIPE, ASSUME THE WRAP CONTAINS > 1% ASBESTOS UNTIL
<br />Wayne Gilbert (925)-551-1849
<br />POTHOLE TO EXPOSE/VERIFY LOCATION.
<br />THE WRAP CAN BE TESTED,
<br />C. OBTAIN SAMPLES OF THE WRAP, & HAVE SAMPLES TESTED FOR ASBESTOS IN ACCORDANCE WITH
<br />DA, PG&E ENGINEER
<br />®AFETY
<br />CONSTRUCTION NOTES:
<br />WP 4711-01.
<br />Assane Fall (925)-519-0812
<br />D. TEST RESULTS ARE TO BE INCLUDED WITH THE FINAL JOB PACKAGE.
<br />SAFETY PLEDGE
<br />1, UNDERGROUND SERVICE ALERT: CALL 811(1-800-227-2600) A MINIMUM OF 2 BUSINESS DAYS (NOT
<br />E. FOLLOW PROCEDURE IN WP 4711-01 FOR REMOVAL OF PIPE WRAP.
<br />I ALWAYS PUT SAFETY FIRST.
<br />4. RESTORATION & CLEAN UP:
<br />INCLUDING INITIAL DAY OF CONTACT) IN ADVANCE FOR THE MARKING OF UNDERGROUND UTILITIES,
<br />A. RESTORATION OF PUBLIC STREETS, SIDEWALKS, CURBS, ETC, ABOVE PIPE BEDDING SHALL BE IN
<br />I LOOK FOR AND ACT TO
<br />INCLUDING ALL NON-UTILITIES BEFORE YOU DIG, GRADE, OR EXCAVATE,
<br />ACCORDANCE WITH THE LATEST CITY, COUNTY, OR AGENCY STANDARDS,
<br />RESOLVE UNSAFE SITUATIONS
<br />2. UTILITY NOTES:
<br />Be WHEREVER THERE ARE ROW CROPS, THE TOPSOIL SHALL BE REMOVED TO A DEPTH OF 12" &
<br />SEQUENCE OF OPERATIONS:
<br />I HELP AND ENCOURAGE
<br />A. DIMENSIONS SHOWN ON THESE DRAWINGS ARE BASED ON THE BEST AVAILABLE INFORMATION
<br />STORED ON SITE. UPON COMPLETION OF CONSTRUCTION, THE TOPSOIL SHALL BE RESTORED. TAKE
<br />1. INSTALL BMPS.
<br />OTHERS TO ACT SAFELY.
<br />FROM SEVERAL SOURCES, & SHALL BE VERIFIED IN THE FIELD BY CONSTRUCTION PERSONNEL PRIOR
<br />CARE TO PREVENT MIXING OF TOPSOIL & SUBSOIL.
<br />2. EXCAVATE & EXPOSE PIPELINE AS SHOWN IN
<br />LOCATION IMAGE(S) &
<br />IDENTIFIED IN
<br />TO EXCAVATION,
<br />S. WELDING REQUIREMENTS:
<br />ECDA DIG SHEET (FORM N).
<br />Be THE INFORMATION SHOWN ON THESE DRAWINGS CONCERNING TYPE & LOCATION OF
<br />A. INSTALL TEST STATIONS WITH THERMITE WELD CONNECTION IN ACCORDANCE WITH GAS T & D
<br />3, COMPLETE PIPELINE INSPECTION IN ACCORDANCE WITH RMP-09 PROCEDURE
<br />FOR
<br />UNDERGROUND UTILITIES, PROPERTY LINES, & OTHER SUBSTRUCTURES IS NOT GUARANTEED TO BE
<br />CORROSION CONTROL MANUAL 0-10, 0-10.1, & 0-10.2.
<br />EXTERNAL CORROSION DIRECT ASSESSMENT.
<br />MICHELS®
<br />ACCURATE OR ALL-INCLUSIVE, UNLESS OTHERWISE NOTED. CONSTRUCTION PERSONNEL ARE
<br />6. PAINTING & COATING REQUIREMENTS:
<br />4. COMPLETE "H" FORM INSPECTION,
<br />RESPONSIBLE FOR MAKING ALL DETERMINATIONS AS TO THE TYPE & LOCATION OF UNDERGROUND
<br />A. ALL EXPOSED PIPE & FITTINGS ARE TO BE PAINTED IN ACCORDANCE WITH GAS STANDARD E-30. ALL
<br />S. PERFORM REPAIRS AS NEEDED.
<br />UTILITIES &OTHER SUBSTRUCTURES AS NECESSARY TO AVOID DAMAGE OR ENCROACHMENTS.
<br />COATING ON BURIED PIPE & FITTINGS ARE TO BE APPLIED IN ACCORDANCE WITH GAS STANDARD
<br />6, RECOAT THE PIPELINE IN ACCORDANCE WITH
<br />GAS STANDARD E-35,
<br />817 Main Street
<br />C. PROSPECTING IS REQUIRED AHEAD OF WORK,
<br />E-35.
<br />7. COMPLETE DOCUMENTATION AS REQUESTED
<br />BY THE PROJECT ENGINEER.
<br />Brownsville, WI
<br />D. ALL EXCAVATIONS WITHIN EXISTING STATIONS SHALL BE HAND DUG OR EXCAVATED USING SOFT
<br />Be FOR COATING SELECTIONS ON BURIED PIPE, SEE DIRECT BURIAL COATING SELECTIONS TABLE.
<br />Be BACKFILL & COMPACT EXCAVATION PER PERMIT STANDARDS,
<br />(920) 583-3132
<br />DIG METHODS (e.g. VACUUM EXCAVATIONS OR SIMILAR).
<br />7. DOCUMENTATION OF INSPECTION OF EXISTING PIPELINE:
<br />9. INSTALL PG&E GAS WARNING DECALS & PIPELINE
<br />WWW,michels.us
<br />MARKER DECALS AS NEEDED.
<br />WHENEVER EXISTING BURIED GAS FACILITIES ARE EXCAVATED DURING ENGINEERING OR DURING
<br />10. REMOVE BMPS.
<br />CONSTRUCTION, AN A-FORM (TD-411013-03401) SHALL BE COMPLETED FOR THE GENERAL INSPECTION.
<br />11, RESTORE PROJECT SITE,
<br />THIS ALSO APPLIES TO GAS FACILITIES BEING DEACTIVATED. THE COMPLETED A-FORM SHALL BE
<br />SUBMITTED WITH THE FINAL JOB PACKAGE,
<br />ISSUED
<br />8, COPIES OF REFERENCE DRAWINGS ARE AVAILABLE TO FIELD PERSONNEL (PG&E, INSPECTION OR
<br />FOR
<br />CONTRACTOR) ON AN AS NEEDED BASIS, CONTACT THE CONTRACT ENGINEER IDENTIFIED IN CONTACTS
<br />TO OBTAIN COPIES OF REFERNECE DRAWINGS,
<br />PERMIT
<br />APPROVED
<br />GM
<br />THIS DRAWING IS FOR
<br />BY
<br />SUPV
<br />VISUAL REFERENCE ONLY,
<br />DSGN
<br />WARNING:
<br />SCALE ISAPPROXIMATE.
<br />EC194614
<br />D-1071
<br />THIS DOCUMENT CONTAINS CONFIDENTIAL, PROPRIETARY
<br />•
<br />LOCATION OF EXISTING
<br />AND PROPOSED
<br />A
<br />INFORMATION THAT ISTHE SOLE PROPERTY OF PACIFIC
<br />STRUCTURES IS
<br />C
<br />9/23/2013
<br />MODIFY WORK AREA SITE
<br />86007766
<br />RML
<br />DWN RML
<br />DFM-1614-02&
<br />DFM-1614-04
<br />GAS AND ELECTRIC COMPANY AND IS INTENDED FOR USE
<br />APPROXIMATE, ANY AND
<br />B
<br />9/18/2019
<br />ISSUED FOR PERMIT
<br />84007766
<br />RML
<br />CHKD
<br />ONLY BY AUTHORIZED PACIFIC GAS AND ELECTRIC
<br />ALL DIMENSIONS ARE
<br />ECDA
<br />INVESTIGATION DIG
<br />COMPANY EMPLOYEES & AGENTS. COPYRIGHT PACIFIC
<br />below.
<br />APPROXIMATE, ORIGINAL
<br />q
<br />8/,16/2019
<br />ISSUED FOR REVIEW
<br />84007766
<br />RML
<br />OK
<br />N0.
<br />DATE
<br />DESCRIPTION
<br />GM/SPEC
<br />DWN
<br />CHKD
<br />SUPV
<br />APVD BY
<br />DATE 9/23/2019
<br />GAS AND ELECTRIC COMPANY.
<br />Know what's
<br />Call before dig.
<br />DRAWING SIZE 11"x17".
<br />IMAGESOURCE:
<br />LODI, CALIFORNIA
<br />you
<br />y 9
<br />MICROSOFT BING
<br />SHEET
<br />C
<br />SCALES
<br />REVISIONS
<br />AS SHOWN
<br />84007766
<br />JOB # 192158
<br />1 OF 3
<br />REV
<br />
|