Laserfiche WebLink
6 Minim 6 —� <br />(TYp) <br />3'-0" <br />Var �\-------� <br />10" Min <br />OD <br />+ 20 Min <br />RIGID CONDUIT <br />See Note 1 Below <br />Existing <br />rPavement <br />See Note 2 Below <br />Compact in 12" max <br />layers to a min relative <br />compaction of 95% <br />under pavement and <br />% outside pavement. <br />-Compact in 24" max <br />layers to a min relative <br />compaction of 85%. <br />-Compact in 6" layer: <br />to a min relative <br />compaction of 90%. <br />10" Min <br />10" <br />Min <br />6.. <br />, <br />F� O <br />(u <br />-7 <br />N\ <br />\\� <br />� <br />Min <br />\ 3'—( <br />Var <br />\\ <br />OD+12 <br />OD <br />OD <br />10" t, <br />+ 20" Min <br />FLEXIBLE CONDUIT <br />' <br />rYp) <br />4in <br />NOTES: <br />I. New pavement shall be 1" thicker than existing pavement, minimum <br />of 0.25 Ft. New base shall be 1 " thicker than existing base, min of 0.50 Ft. <br />2. Select native material or imported granular material as approved by the Director <br />of Public Works. Backfill with materials equal to or better than the existing <br />pavement and base in quality. <br />3. Relative compaction of materials shall be tested in accordance with <br />the State of California, Dept. of Transportation Testing Manuals, test <br />method No. California 216 or 231. <br />4. All existing pavement shall be neatly cut to line prior to trench excavation. <br />5. Jetting or ponding will be permitted within the street right—of—way with <br />a 3 year bond, when approved by the Director of Public Works. <br />6. When shown by soil composition and compactability, ninety percent (90%) <br />compaction may be used, when approved by the Director of Public Works. <br />7. Special bedding and backfill requirements may be shown on the plans or <br />specified in the special provisions. <br />Approved by: <br />TYPICAL TRENCH BACKFILL <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />Date: DEC 2014 Std. Dwg. No. R�29 <br />