Laserfiche WebLink
COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />P.O. BOX 1810-1810 E. HAZELTON AVENUE <br />STOCKTON, CALIFORNIA 95201 <br />(209) 468-3000 <br />FAX # (209) 468-9324 <br />ENCROACHMENT PERMIT <br />To: PACIFIC GAS &ELECTRIC - MODESTO <br />P.O. BOX 3031 <br />MODESTO, CA 95353 <br />Encroachment T e: <br />Pole Removal & Sidewalk Replacement <br />Location: <br />E/S OF WEST LN, 346' S/O FULTON ST. <br />MUMPS-1903759 <br />Date Issued: 12/02/2019 <br />Start Date: 01/01/2020 <br />Exp. Date: <br />Project No: <br />Quad: NS <br />06/01/2020 <br />PWP730052 <br />LTE/CR/PM N0:31464045 <br />In compliance with your request of 12/02/2019 ,permission is hereby granted to do work in County right -of --way as shown on attached <br />application and subject to all the terms, conditions and restrictions written below or printed as general or special provisions on any part of this <br />form. See reverse side and attached sheet, if any. <br />Trench excavations for service connections will not be permitted within ten feet (10') of pavement centerline unless otherwise approved by the <br />Director. Surface of trench patches shall match in kind and be smooth and even with that of abutting surface. Special attention shall be given <br />to depth of utilities through roadside area in anticipation of future drainage facilities, road profile and/or frontage development. All <br />underground utility facilities are to be established and accurately dimensioned on sketches from surveyed centerline of road right of way, or <br />from right of way (border) lines. <br />Permittee shall call the Department of Public Worlcs, Field Engineering Division (Permit Inspections) at (209)953-7421 at least <br />forty-eight hours prior to beginning any work within the County right of way. All work performed under this permit shall conform to <br />the rules and regulations pertaining to safety established by the California Division of Industrial Safety and Cal -OSHA. <br />The jobsite shall be kept in a safe condition at all times by the daily removal of any excess dirt <br />or debris which might be a hazard to either <br />pedestrian or automobile traffic. All necessary traffic convenience and warning devices and personnel shall be provided, placed and <br />maintained by and at the sole expense of the Permittee in accordance with the latest edition of the CALTRANS Manual of Traffic Control. <br />After completion of the work permitted herein, all debris, lumber, barricades, or any excess material shall be removed and the jobsite left <br />in a <br />neat workmanlike manner. Immediately following completion of construction permitted herein, Permittee shall fill out and mail notice of <br />completion (see attached post card) provided by Grantor. <br />Special Comments: <br />Traffic Control Per MUTCD* * * * * *See Attached "Special Conditions"* * * * *EMERGENCY WORK <br />FORMS: <br />SS/WW, R-5, R-7 <br />Est. Permit Fee: <br />WHITE <br />GOLDENROD <br />YELLOW <br />PINK <br />-Permittee <br />-PWD Central File <br />-Field Inspection <br />-Permit Section <br />By: <br />KRiS BALAJI, Director <br />of Public Worlcs <br />Section <br />