Laserfiche WebLink
NOTES: <br />1 <br />2. <br />3. <br />If the distance between cross—cuts are less then 150 the entire area between <br />corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br />The resurfacing requirements shall be in addition to County Standard Drawing No. <br />R-29. <br />Resurfacing for Bell Holes shall meet these <br />the shoulder or lane, only that area shall b <br />If cross—cutting is performed on Local Roac <br />Coat for that half of the roadway containinc <br />resurfacing. Section 2-5.03 (B-2). <br />Paved Shoulder <br />Working for YOU <br />c� <br />requirements. If excavation occurs within <br />resufaced as shown, <br />s it intervals less then 150' a Seal <br />the trench can be used in lieu of <br />L) <br />U 14� <br />c <br />a <br />O <br />O <br />)U <br />Uloll <br />� <br />N <br />U� <br />U <br />D <br />C <br />cU <br />� <br />O <br />Q <br />TRENCH CUTTING POLICY <br />CROSS CUTTING OF <br />COUNTY ROADWAYS <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />Approved by: <br />No. <br />Date: DEC 2014 <br />Revision Description I Date <br />Std. Dwg. No. R'36 <br />a <br />O <br />)U <br />Uloll <br />TRENCH CUTTING POLICY <br />CROSS CUTTING OF <br />COUNTY ROADWAYS <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />Approved by: <br />No. <br />Date: DEC 2014 <br />Revision Description I Date <br />Std. Dwg. No. R'36 <br />