Laserfiche WebLink
6" Min— 6" <br />(TYP)jo� <br />'— <br />3 0" <\ <br />Var �\ ------ <br />10" Min <br />OD <br />+ 20 Min <br />RIGID CONDUIT <br />See Note 1 Below <br />-Existing <br />Pavement <br />See Note 2 Below <br />Compact in 12" max <br />layers to a min relaive <br />compaction of 95% <br />under pavement and <br />% outside pavemer <br />Compact in 24" max <br />layers to a min relati <br />compaction of 85%. <br />Compact in 6" layer: <br />to a min relative <br />compaction of 90%. <br />1 <br />10" Min 0" <br />►1 Min <br />lin <br />�— 6 <br />I �— 6 <br />\\ <br />\ <br />rt. <br />Je\� <br />Min <br />\� 3'—( <br />�� <br />------- <br />-- - -- <br />� Var <br />/ <br />OD+12 <br />ODi <br />0D <br />+ 20" Min <br />10" N <br />FLEXIBLE CONDUIT <br />NOTES: <br />1. New pavement shall be 1" thicker than existing pavement, minimum <br />of 0.25 Ft. New base shall be 1" thicker than existing base, min of 0.50 Ft. <br />2. Select native material or imported granular material as approved by the Director <br />of Public Works. Backfill with materials equal to or better than the existing <br />pavement and base in quality. <br />3. Relative compaction of materials shall be tested in accordance with <br />the State of California, Dept. of Transportation Testing Manuals, test <br />method No. California 216 or 231. <br />4. All existing pavement shall be neatly cut to line prior to trench excavation. <br />5. Jetting or ponding will be permitted within the street right—of—way with <br />a 3 year bond, when approved by the Director of Public Works. <br />6. When shown by soil composition and compactability, ninety percent (90%) <br />compaction may be used, when approved by the Director of Public Works. <br />7. Special bedding and backfill requirements may be shown on the plans or <br />specified in the special provisions. <br />Approved by: <br />TYPICAL I RENCH BACKFILL <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />fyp) <br />Date: DEC 2014 Std. Dwg. No. R'29 <br />