Laserfiche WebLink
SAN JOAQUIN <br />C-0Ui`dTY <br />Ow Vie <br />L.r r1 S <br />'Pi/arking far VOA Lj <br />t)epartment of Public Works <br />Kris Balaji, Director of Public Works <br />1 ritz Buchman, Deputy Director/Development <br />6�lex Chetley, Interim Deputy Director/Engineering <br />Jim Stone, Deputy Director/Operations <br />Kristi Rhea, Manager of Strategic Initiatives <br />Acknowledgement %J Monument Preservation <br />a duly Licensed Land Surveyor or a Professional Engineer <br />(Please print) <br />authorized to pertorm Land Surveying in the State of California, Registration No. wb <br />hereby acknowledge and accept all responsibility for the monument preservation as required <br />per Section 8771(a -f) of the Business and Professions Code within the bounds of the <br />construction activity permitted by San Joaquin County Permit No. <br />L <br />25 4'. A//,/z 4 �JT- <br />I further acknowledge that I am hereby responsible for the Acl<nowledgement of Monument <br />Preservation prior to final acceptance of the construction activity. <br />gnature / Seal <br />Date <br />PS -MONUMENT PRESERVATION <br />1810 East I-lazelton Avenue � Stockton, California 95205 � "1 209 468 3000 I P 209 468 2999 <br />