Laserfiche WebLink
NOTES; <br />1. <br />2. <br />4, <br />If the distance between cross—cuts are less then 150 the entire area between <br />corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br />The resurfacing requirements shall be in addition to County Standard Drawing No. <br />R-29. <br />Resurfacing for Bell Holes shall meet these <br />the shoulder or lane, only that area shall b <br />If cross—cutting is performed on Local Roac <br />Coat for that half of the roadway containinc <br />resurfacing. Section 2-5.03B-2, <br />Paved Shoulder <br />r�1 <br />requirements. If excavation occurs within <br />resufaced as shown, <br />s at intervals less then 150' a Sea <br />the trench can be used in lieu of <br />co <br />C <br />D <br />N <br />a-+ <br />n <br />O <br />N <br />� <br />L <br />U� <br />U <br />p <br />C <br />U <br />O <br />CU <br />O <br />O <br />o, c <br />a <br />Q <br />co <br />10 <br />Ago <br />_ N <br />U � <br />O <br />NO <br />C <br />U <br />L .� <br />TRENCH CUTTING POLICY <br />CROSS CUTTING OF <br />COUNTY ROADWAYS <br />COUNTY OF SAN JOAQ UIN <br />DEPARTMENT OF PUBLIC WORKS <br />prove <br />i <br />Date; DEC 2014 Std. Dwg. No. R-36 <br />TRENCH CUTTING POLICY <br />CROSS CUTTING OF <br />COUNTY ROADWAYS <br />COUNTY OF SAN JOAQ UIN <br />DEPARTMENT OF PUBLIC WORKS <br />prove <br />i <br />Date; DEC 2014 Std. Dwg. No. R-36 <br />