My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2019_PS-1903501 thru PS-1904000_ - PS-1903817
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2019
>
PS-1903501 thru PS-1904000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2019_PS-1903501 thru PS-1904000_ - PS-1903817
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2024 9:35:51 AM
Creation date
6/26/2024 9:35:26 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1903817
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2019
Notes2
1925 E. Ninth St.
Type - Permit Process
Trench
Address
4102 Coastal Cove Ln., Stockton,CA 95219
Application
JRH General Engineering
Supplemental fields
Cross Ref
PWP7110005
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NOTES; <br />1. <br />2. <br />4, <br />If the distance between cross—cuts are less then 150 the entire area between <br />corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br />The resurfacing requirements shall be in addition to County Standard Drawing No. <br />R-29. <br />Resurfacing for Bell Holes shall meet these <br />the shoulder or lane, only that area shall b <br />If cross—cutting is performed on Local Roac <br />Coat for that half of the roadway containinc <br />resurfacing. Section 2-5.03B-2, <br />Paved Shoulder <br />r�1 <br />requirements. If excavation occurs within <br />resufaced as shown, <br />s at intervals less then 150' a Sea <br />the trench can be used in lieu of <br />co <br />C <br />D <br />N <br />a-+ <br />n <br />O <br />N <br />� <br />L <br />U� <br />U <br />p <br />C <br />U <br />O <br />CU <br />O <br />O <br />o, c <br />a <br />Q <br />co <br />10 <br />Ago <br />_ N <br />U � <br />O <br />NO <br />C <br />U <br />L .� <br />TRENCH CUTTING POLICY <br />CROSS CUTTING OF <br />COUNTY ROADWAYS <br />COUNTY OF SAN JOAQ UIN <br />DEPARTMENT OF PUBLIC WORKS <br />prove <br />i <br />Date; DEC 2014 Std. Dwg. No. R-36 <br />TRENCH CUTTING POLICY <br />CROSS CUTTING OF <br />COUNTY ROADWAYS <br />COUNTY OF SAN JOAQ UIN <br />DEPARTMENT OF PUBLIC WORKS <br />prove <br />i <br />Date; DEC 2014 Std. Dwg. No. R-36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.