T
<br />.a
<br />/
<br />• P)
<br />1 4
<br />.'Y
<br />Fee 4
<br />•
<br />I.. Ise ,
<br />I
<br />Is
<br />s I IL
<br />°'I
<br />'i
<br />~'F!.'
<br />EC19-108, D-1055
<br />IF
<br />IF
<br />r
<br />1.
<br />L-108
<br />a
<br />fy �.,�� 0
<br />r�
<br />ECDA INVESTIGATION DIG
<br />I III
<br />seep
<br />'�
<br />rr
<br />'`
<br />;®
<br />EC191108-B-A
<br />srl�
<br />ORDER #84008924�sTo
<br />VICINITY MAP
<br />MANTECA,CA
<br />NOT TO SCALE
<br />GENERAL NOTES:
<br />CONTACT INFORMATION:
<br />1, THIS DRAWING IS ISSUED FOR PERMIT. REFER TO CONTRACT DOCUMENTATION FOR ADDITIONAL CLARITY
<br />3. COATING REMOVAL:
<br />OF SCOPE OF WORK.
<br />BEFORE REMOVING THE PIPE COATING ON PRE -1972 PIPE (DOES NOT INCLUDE PLASTIC TAPE OR FUSION
<br />MICHELS, PROJECT MANAGER
<br />2, THIS DRAWING HAS BEEN CREATED BY REVIEW OF THE AS -BUILT DRAWINGS & RECORDS. ACCURACY IS
<br />BONDED EPDXY COATINGS) THE FOLLOWING STEPS SHALL BE TAKEN:
<br />DEPENDENT UPON THE SOURCE DOCUMENTS LISTED IN THE REFERENCE DOCUMENTS,
<br />A. FOR ALL NON -EMERGENCY WORK, PRE -1972 PIPE WRAP MUST BE EVALUATED TO DETERMINE IF IT
<br />Christopher Curtis (920)-392-9984
<br />3. UTILITIES SHOWN ON DRAWING ARE APPROXIMATE BASED UPON REVIEW OF PG&E DIG SHEET, DIGS
<br />CONTAINS ASBESTOS PRIOR TO REMOVAL.
<br />PLE, PG&E ENGINEER
<br />BASIS MEMO, & GIS. CONTRACTOR TO CALL USA TO HAVE LOCATION OF THESE FACILITIES MARKED &
<br />Be FOR EMERGENCY WORK ON PRE -1972 PIPE, ASSUME THE WRAP CONTAINS> 1% ASBESTOS UNTIL
<br />Robin Tran
<br />POTHOLE TO EXPOSE/VERIFY LOCATION,
<br />THE WRAP CAN BE TESTED.
<br />DA, PG&E ENGINEER
<br />C. OBTAIN SAMPLES OF THE WRAP, & HAVE SAMPLES TESTED FOR ASBESTOS IN ACCORDANCE WITH
<br />®AFETY
<br />CONSTRUCTION NOTES:
<br />WP 4711-01,
<br />Manuel Leija
<br />D. TEST RESULTS ARE TO BE INCLUDED WITH THE FINALJOB PACKAGE.
<br />SAFETY PLEDGE
<br />1. UNDERGROUND SERVICE ALERT: CALL 811(1-800-227-2600) A MINIMUM OF 2 BUSINESS DAYS (NOT
<br />E. FOLLOW PROCEDURE IN WP 4711-01 FOR REMOVAL OF PIPE WRAP.
<br />I ALWAYS PUT SAFETY FIRST.
<br />INCLUDING INITIAL DAY OF CONTACT) IN ADVANCE FOR THE MARKING OF UNDERGROUND UTILITIES,
<br />4• RESTORATION & CLEAN UP:
<br />I LOOK FOR AND ACT TO
<br />A, RESTORATION OF PUBLIC STREETS, SIDEWALKS, CURBS, ETC. ABOVE PIPE BEDDING SHALL BE IN
<br />INCLUDING ALL NON -UTILITIES BEFORE YOU DIG, GRADE, OR EXCAVATE,
<br />ACCORDANCE WITH THE LATEST CITY, COUNTY, OR AGENCY STANDARDS.
<br />RESOLVE UNSAFE SITUATIONS
<br />2. UTILITY NOTES:
<br />Be WHEREVER THERE ARE ROW CROPS, THE TOPSOIL SHALL BE REMOVED TO A DEPTH OF 12" &
<br />SEQUENCE OF OPERATIONS:
<br />I HELP AND ENCOURAGE
<br />A. DIMENSIONS SHOWN ON THESE DRAWINGS ARE BASED ON THE BEST AVAILABLE INFORMATION
<br />STORED ON SITE. UPON COMPLETION OF CONSTRUCTION, THE TOPSOIL SHALL BE RESTORED. TAKE
<br />1. INSTALL BMPS.
<br />OTHERS TO ACT SAFELY,
<br />FROM SEVERAL SOURCES, &SHALL BE VERIFIED IN THE FIELD BY CONSTRUCTION PERSONNEL PRIOR
<br />CARE TO PREVENT MIXING OF TOPSOIL & SUBSOIL.
<br />2. EXCAVATE & EXPOSE PIPELINE AS SHOWN
<br />IN LOCATION IMAGE(S) & IDENTIFIED IN
<br />TO EXCAVATION.
<br />S. WELDING REQUIREMENTS:
<br />ECDA DIG SHEET (FORM N).
<br />Be THE INFORMATION SHOWN THESE DRAWINGS CONCERNING CPE &LOCATION OF
<br />A. INSTALLTEST STATIONS WITH THERMITE WELD CONNECTION IN ACCORDANCE WITH GAS T & D
<br />3. COMPLETE PIPELINE INSPECTION IN ACCORDANCE WITH RMP -09 PROCEDURE FOR
<br />UNDERGROUND UTILITIES, PROPERTY LINES, &OTHER SUBSTRUCTURES IS NOT GUARANTEED TO BE
<br />RO
<br />CORROSION CONTROL MANUAL 0-10, 0-10.1, & 0-10.2.
<br />EXTERNAL CORROSION DIRECT ASSESSMENT.
<br />MICHELS°
<br />PERSONNEL
<br />ACCURATE OR ALL-INCLUSIVE, UNLESS OTHERWISE NOTED. CONSTRUCTION PERSONNEL ARE
<br />6. PAINTING & COATING REQUIREMENTS:
<br />4. COMPLETE "H" FORM INSPECTION.
<br />RESPONSIBLE FOR MAKING ALL DETERMINATIONS AS TO THE CPE & LOCATION OF UNDERGROUND
<br />A. ALL EXPOSED PIPE & FITTINGS ARETO BE PAINTED IN ACCORDANCE WITH GAS STANDARD E-30, ALL
<br />5. PERFORM REPAIRS AS NEEDED,
<br />UTILITIES & OTHER SUBSTRUCTURES AS NECESSARY TO AVOID DAMAGE OR ENCROACHMENTS,
<br />COATING ON BURIED PIPE & FITTINGS ARE TO BE APPLIED IN ACCORDANCE WITH GAS STANDARD
<br />6. RECOAT THE PIPELINE IN ACCORDANCE WITH
<br />GAS STANDARD E-35,
<br />Main Street
<br />C. PROSPECTING IS REQUIRED AHEAD OF WORK.
<br />E-35.
<br />7. COMPLETE DOCUMENTATION AS REQUESTED BY THE PROJECT ENGINEER.
<br />Brownsville, WI
<br />Brownsville,
<br />D. ALL EXCAVATIONS WITHIN EXISTING STATIONS SHALL BE HAND DUG OR EXCAVATED USING SOFT
<br />Be FOR COATING SELECTIONS ON BURIED PIPE, SEE DIRECT BURIAL COATING SELECTIONS TABLE.
<br />Be BACKFILL & COMPACT EXCAVATION PER PERMIT STANDARDS,
<br />(920) 583-3132
<br />DIG METHODS (e.g. VACUUM EXCAVATIONS OR SIMILAR),
<br />7. DOCUMENTATION OF INSPECTION OF EXISTING PIPELINE:
<br />9. INSTALL PG&E GAS WARNING DECALS & PIPELINE
<br />MARKER DECALS AS NEEDED.
<br />WWW,michels.us
<br />WHENEVER EXISTING BURIED GAS FACILITIES ARE EXCAVATED DURING ENGINEERING OR DURING
<br />10. REMOVE BMPS.
<br />CONSTRUCTION, AN A -FORM (TD -4110P -03-F01) SHALL BE COMPLETED FOR THE GENERAL INSPECTION,
<br />11. RESTORE PROJECT SITE,
<br />THIS ALSO APPLIES TO GAS FACILITIES BEING DEACTIVATED, THE COMPLETED A -FORM SHALL BE
<br />ISSUED
<br />SUBMITTED WITH THE FINAL JOB PACKAGE,
<br />8, COPIES OF REFERENCE DRAWINGS ARE AVAILABLE TO FIELD PERSONNEL (PG&E, INSPECTION OR
<br />FOR
<br />CONTRACTOR) ON AN AS NEEDED BASIS, CONTACT THE CONTRACT ENGINEER IDENTIFIED IN CONTACTS
<br />TO OBTAIN COPIES OF REFERNECE DRAWINGS,
<br />REVIEW
<br />APPROVED
<br />GM
<br />THIS DRAWING IS FOR
<br />BY
<br />SU PV
<br />WARNING:
<br />-
<br />VISUAL REFERENCE ONLY.
<br />SCALE IS APPROXIMATE,
<br />EC19-108
<br />MOSS
<br />DSGN
<br />THIS DOCUMENT CONTAINS CONFIDENTIAL, PROPRIETARY
<br />LOCATION OF EXISTING
<br />A
<br />INFORMATION THAT IS THE SOLE PROPERTY OF PACIFIC
<br />AND PROPOSED
<br />STRUCTURES IS
<br />DWN RML
<br />L-108
<br />GAS AND ELECTRIC COMPANY AND IS INTENDED FOR USE
<br />APPROXIMATE, ANY AND
<br />B
<br />9/25/2019
<br />MODIFYWORKAREAS
<br />84008924
<br />RML
<br />CHKD
<br />ECDA INVESTIGATION DIG
<br />A
<br />9/11/2019
<br />ISSUED FOR REVIEW
<br />84008924
<br />RML
<br />OK
<br />ONLY BY AUTHORIZED PACIFIC GAS AND ELECTRIC
<br />ALL DIMENSIONS ARE
<br />ORIGINAL
<br />COMPANY EMPLOYEES& AGENTS. COPYRIGHT PACIFICAPPROXIMATE.
<br />Know what's below.
<br />DRAWING SIZE 11"x17"•
<br />MANTECA,cALIFORNIA
<br />GAS AND ELECTRIC COMPANY,
<br />Call before .
<br />dl you
<br />Y 9
<br />IMAGESOURCE:
<br />NO.
<br />DATE
<br />DESCRIPTION
<br />GM/SPEC
<br />DWN
<br />CHKD
<br />SUPV
<br />APVD BY
<br />DATE 9/25/2019
<br />MICROSOFT BING
<br />SCALES
<br />SHEET
<br />B
<br />REVISIONS
<br />AS SHOWN
<br />84008924
<br />JOB # 192159
<br />1 OF 3
<br />REV