Laserfiche WebLink
T <br />.a <br />/ <br />• P) <br />1 4 <br />.'Y <br />Fee 4 <br />• <br />I.. Ise , <br />I <br />Is <br />s I IL <br />°'I <br />'i <br />~'F!.' <br />EC19-108, D-1055 <br />IF <br />IF <br />r <br />1. <br />L-108 <br />a <br />fy �.,�� 0 <br />r� <br />ECDA INVESTIGATION DIG <br />I III <br />seep <br />'� <br />rr <br />'` <br />;® <br />EC191108-B-A <br />srl� <br />ORDER #84008924�sTo <br />VICINITY MAP <br />MANTECA,CA <br />NOT TO SCALE <br />GENERAL NOTES: <br />CONTACT INFORMATION: <br />1, THIS DRAWING IS ISSUED FOR PERMIT. REFER TO CONTRACT DOCUMENTATION FOR ADDITIONAL CLARITY <br />3. COATING REMOVAL: <br />OF SCOPE OF WORK. <br />BEFORE REMOVING THE PIPE COATING ON PRE -1972 PIPE (DOES NOT INCLUDE PLASTIC TAPE OR FUSION <br />MICHELS, PROJECT MANAGER <br />2, THIS DRAWING HAS BEEN CREATED BY REVIEW OF THE AS -BUILT DRAWINGS & RECORDS. ACCURACY IS <br />BONDED EPDXY COATINGS) THE FOLLOWING STEPS SHALL BE TAKEN: <br />DEPENDENT UPON THE SOURCE DOCUMENTS LISTED IN THE REFERENCE DOCUMENTS, <br />A. FOR ALL NON -EMERGENCY WORK, PRE -1972 PIPE WRAP MUST BE EVALUATED TO DETERMINE IF IT <br />Christopher Curtis (920)-392-9984 <br />3. UTILITIES SHOWN ON DRAWING ARE APPROXIMATE BASED UPON REVIEW OF PG&E DIG SHEET, DIGS <br />CONTAINS ASBESTOS PRIOR TO REMOVAL. <br />PLE, PG&E ENGINEER <br />BASIS MEMO, & GIS. CONTRACTOR TO CALL USA TO HAVE LOCATION OF THESE FACILITIES MARKED & <br />Be FOR EMERGENCY WORK ON PRE -1972 PIPE, ASSUME THE WRAP CONTAINS> 1% ASBESTOS UNTIL <br />Robin Tran <br />POTHOLE TO EXPOSE/VERIFY LOCATION, <br />THE WRAP CAN BE TESTED. <br />DA, PG&E ENGINEER <br />C. OBTAIN SAMPLES OF THE WRAP, & HAVE SAMPLES TESTED FOR ASBESTOS IN ACCORDANCE WITH <br />®AFETY <br />CONSTRUCTION NOTES: <br />WP 4711-01, <br />Manuel Leija <br />D. TEST RESULTS ARE TO BE INCLUDED WITH THE FINALJOB PACKAGE. <br />SAFETY PLEDGE <br />1. UNDERGROUND SERVICE ALERT: CALL 811(1-800-227-2600) A MINIMUM OF 2 BUSINESS DAYS (NOT <br />E. FOLLOW PROCEDURE IN WP 4711-01 FOR REMOVAL OF PIPE WRAP. <br />I ALWAYS PUT SAFETY FIRST. <br />INCLUDING INITIAL DAY OF CONTACT) IN ADVANCE FOR THE MARKING OF UNDERGROUND UTILITIES, <br />4• RESTORATION & CLEAN UP: <br />I LOOK FOR AND ACT TO <br />A, RESTORATION OF PUBLIC STREETS, SIDEWALKS, CURBS, ETC. ABOVE PIPE BEDDING SHALL BE IN <br />INCLUDING ALL NON -UTILITIES BEFORE YOU DIG, GRADE, OR EXCAVATE, <br />ACCORDANCE WITH THE LATEST CITY, COUNTY, OR AGENCY STANDARDS. <br />RESOLVE UNSAFE SITUATIONS <br />2. UTILITY NOTES: <br />Be WHEREVER THERE ARE ROW CROPS, THE TOPSOIL SHALL BE REMOVED TO A DEPTH OF 12" & <br />SEQUENCE OF OPERATIONS: <br />I HELP AND ENCOURAGE <br />A. DIMENSIONS SHOWN ON THESE DRAWINGS ARE BASED ON THE BEST AVAILABLE INFORMATION <br />STORED ON SITE. UPON COMPLETION OF CONSTRUCTION, THE TOPSOIL SHALL BE RESTORED. TAKE <br />1. INSTALL BMPS. <br />OTHERS TO ACT SAFELY, <br />FROM SEVERAL SOURCES, &SHALL BE VERIFIED IN THE FIELD BY CONSTRUCTION PERSONNEL PRIOR <br />CARE TO PREVENT MIXING OF TOPSOIL & SUBSOIL. <br />2. EXCAVATE & EXPOSE PIPELINE AS SHOWN <br />IN LOCATION IMAGE(S) & IDENTIFIED IN <br />TO EXCAVATION. <br />S. WELDING REQUIREMENTS: <br />ECDA DIG SHEET (FORM N). <br />Be THE INFORMATION SHOWN THESE DRAWINGS CONCERNING CPE &LOCATION OF <br />A. INSTALLTEST STATIONS WITH THERMITE WELD CONNECTION IN ACCORDANCE WITH GAS T & D <br />3. COMPLETE PIPELINE INSPECTION IN ACCORDANCE WITH RMP -09 PROCEDURE FOR <br />UNDERGROUND UTILITIES, PROPERTY LINES, &OTHER SUBSTRUCTURES IS NOT GUARANTEED TO BE <br />RO <br />CORROSION CONTROL MANUAL 0-10, 0-10.1, & 0-10.2. <br />EXTERNAL CORROSION DIRECT ASSESSMENT. <br />MICHELS° <br />PERSONNEL <br />ACCURATE OR ALL-INCLUSIVE, UNLESS OTHERWISE NOTED. CONSTRUCTION PERSONNEL ARE <br />6. PAINTING & COATING REQUIREMENTS: <br />4. COMPLETE "H" FORM INSPECTION. <br />RESPONSIBLE FOR MAKING ALL DETERMINATIONS AS TO THE CPE & LOCATION OF UNDERGROUND <br />A. ALL EXPOSED PIPE & FITTINGS ARETO BE PAINTED IN ACCORDANCE WITH GAS STANDARD E-30, ALL <br />5. PERFORM REPAIRS AS NEEDED, <br />UTILITIES & OTHER SUBSTRUCTURES AS NECESSARY TO AVOID DAMAGE OR ENCROACHMENTS, <br />COATING ON BURIED PIPE & FITTINGS ARE TO BE APPLIED IN ACCORDANCE WITH GAS STANDARD <br />6. RECOAT THE PIPELINE IN ACCORDANCE WITH <br />GAS STANDARD E-35, <br />Main Street <br />C. PROSPECTING IS REQUIRED AHEAD OF WORK. <br />E-35. <br />7. COMPLETE DOCUMENTATION AS REQUESTED BY THE PROJECT ENGINEER. <br />Brownsville, WI <br />Brownsville, <br />D. ALL EXCAVATIONS WITHIN EXISTING STATIONS SHALL BE HAND DUG OR EXCAVATED USING SOFT <br />Be FOR COATING SELECTIONS ON BURIED PIPE, SEE DIRECT BURIAL COATING SELECTIONS TABLE. <br />Be BACKFILL & COMPACT EXCAVATION PER PERMIT STANDARDS, <br />(920) 583-3132 <br />DIG METHODS (e.g. VACUUM EXCAVATIONS OR SIMILAR), <br />7. DOCUMENTATION OF INSPECTION OF EXISTING PIPELINE: <br />9. INSTALL PG&E GAS WARNING DECALS & PIPELINE <br />MARKER DECALS AS NEEDED. <br />WWW,michels.us <br />WHENEVER EXISTING BURIED GAS FACILITIES ARE EXCAVATED DURING ENGINEERING OR DURING <br />10. REMOVE BMPS. <br />CONSTRUCTION, AN A -FORM (TD -4110P -03-F01) SHALL BE COMPLETED FOR THE GENERAL INSPECTION, <br />11. RESTORE PROJECT SITE, <br />THIS ALSO APPLIES TO GAS FACILITIES BEING DEACTIVATED, THE COMPLETED A -FORM SHALL BE <br />ISSUED <br />SUBMITTED WITH THE FINAL JOB PACKAGE, <br />8, COPIES OF REFERENCE DRAWINGS ARE AVAILABLE TO FIELD PERSONNEL (PG&E, INSPECTION OR <br />FOR <br />CONTRACTOR) ON AN AS NEEDED BASIS, CONTACT THE CONTRACT ENGINEER IDENTIFIED IN CONTACTS <br />TO OBTAIN COPIES OF REFERNECE DRAWINGS, <br />REVIEW <br />APPROVED <br />GM <br />THIS DRAWING IS FOR <br />BY <br />SU PV <br />WARNING: <br />- <br />VISUAL REFERENCE ONLY. <br />SCALE IS APPROXIMATE, <br />EC19-108 <br />MOSS <br />DSGN <br />THIS DOCUMENT CONTAINS CONFIDENTIAL, PROPRIETARY <br />LOCATION OF EXISTING <br />A <br />INFORMATION THAT IS THE SOLE PROPERTY OF PACIFIC <br />AND PROPOSED <br />STRUCTURES IS <br />DWN RML <br />L-108 <br />GAS AND ELECTRIC COMPANY AND IS INTENDED FOR USE <br />APPROXIMATE, ANY AND <br />B <br />9/25/2019 <br />MODIFYWORKAREAS <br />84008924 <br />RML <br />CHKD <br />ECDA INVESTIGATION DIG <br />A <br />9/11/2019 <br />ISSUED FOR REVIEW <br />84008924 <br />RML <br />OK <br />ONLY BY AUTHORIZED PACIFIC GAS AND ELECTRIC <br />ALL DIMENSIONS ARE <br />ORIGINAL <br />COMPANY EMPLOYEES& AGENTS. COPYRIGHT PACIFICAPPROXIMATE. <br />Know what's below. <br />DRAWING SIZE 11"x17"• <br />MANTECA,cALIFORNIA <br />GAS AND ELECTRIC COMPANY, <br />Call before . <br />dl you <br />Y 9 <br />IMAGESOURCE: <br />NO. <br />DATE <br />DESCRIPTION <br />GM/SPEC <br />DWN <br />CHKD <br />SUPV <br />APVD BY <br />DATE 9/25/2019 <br />MICROSOFT BING <br />SCALES <br />SHEET <br />B <br />REVISIONS <br />AS SHOWN <br />84008924 <br />JOB # 192159 <br />1 OF 3 <br />REV <br />