Laserfiche WebLink
COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />P.O. BOX 18104810 E. HAZELTON AVENUE <br />STOCKTON, CALIFORNIA 95201 <br />(209) 468-3000 <br />FAX # (209) 468-9324 <br />Permit No: PS4902907 <br />,Issued: 11/05/2019 <br />Exp. Date: 11/04/2020 <br />Project No: PWP110005 <br />APN No: 01732003 <br />DRIVEWAY ENCROACHMENT PERMIT <br />To: PATEE THOMAS C & I{ATIE M <br />815 LOUIE AVE <br />LODI CA 95240 - <br />Location: 5420 E ACAMPO RD ACAM <br />hi compliance with your request of 09/05/2019, and subject to all the terms, conditions and restrictions written below or printed as general or <br />special provisions on any part of this form. <br />Permission is hereby granted to construct One driveway w/o pipe shown on <br />Permit Application No. PS -1902907 Quad: NE <br />Jobsite shall be kept in a safe condition at all times by removing daily any excess dirt or debris which might be a hazard to pedestrian and/or <br />vehicular traffic. Adequate lights, signs and barricades shall be placed and maintained by the Permittee for the protection of the public in <br />accordance with the current Caltrans Standard Specifications. <br />A(n) O inside diameter per section 62 of the current Caltrans Standard Specifications, ALTERNATIVE PIPE AND PIPE ARCH <br />CULVERTS, shall be installed in roadside drainage ditch for drainage flow maintenance and shall be of sufficient length to clear toe of <br />approach fill or headwalls. <br />T'he entire area of driveway approach(es), include flares for turning and /or paved frontage(s), 4r. <br />the edge of roadway pavement to <br />right -of --way (front property) 1nie shall be surfaced with a two inch (2") minnnum of asphalt concrete over a (4 inch) Four rich minunum of <br />compacted layer of three-quarter inch (3/4") maximum size aggregate base material (road gravel) conforming to Class 2 Aggregate Base <br />specified in Section 26 of the current Caltrans Standard Specification, or with a four inch (4") minimum of portland cement concrete. <br />Ifportland cement concrete pavement is histalled, expansion joints shall be provided at the edge of <br />pavement and along property line. Surface <br />grades of approaches) and/or to open ends of pipe. No ponding or puddles on pavement sLu•face shall be allowed. <br />The field Engineering Division of this office shall receive no less than forty-eight(48) hours notice prior to beginning of any work <br />within the County right -of --way. After completion of the work permitted herein, all debris, lumber, barricades or any excess <br />material shall be removed and the jobsite left in a neat workmanlike condition. The Permittee shall fill out and mail notice of <br />completion provided by Grantor. <br />Driveway(s) <br />shall be complete prior to occupancy of the residence, <br />but not to exceed expiration date. <br />Kris Balaji, Director <br />Department of Public Works <br />y <br />Pennit section <br />FORMS: <br />