Laserfiche WebLink
ROAD DISTRICT 5 <br />? Jf r1a, t, <br />am_ <br />DELTA a,' CITY OFrCIiT Fl,: <br />_� �� �� LATH ROP. MANTECA <br />i L <br />`Ogryq) <br />- ..q4 <br />C ARBOR <br />g \, 1-'205 * ♦ ■ - ■ i <br />GRANT LINE <br />CITkYOF <br />ELEV��� \_..'. <br />SR -1-20 <br />n LA\ <br />' \ Q ATHERTON <br />Z J <br />O O <br />{a _WOOD.WARD- <br />■ Z <br />LINNE ■ ? <br />. i .-44, <br />It <br />tiC fl <br />county <br />i <br />0 <br />SR 132 % • STANISLAUS <br />�' COUNTY <br />MAC ARTHUR DRIVE (Arbor Drive to Canal Boulevard) <br />WOODWARD AVENUE (420' East of Pagola Avenue to -9t5' West of Tinnin Road) <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER <br />C. Sommer/J. Yang 9/15 _ <br />GENERAL NOTES: <br />1. Existing highway and utility facilities must remain in place unless otherwise noted. <br />2. Existing trees, shrubs, fences, mailboxes and other frontage improvements must <br />remain in place unless otherwise noted. <br />3. The Contractor will be responsible for adequately scheduling inspection and testing of <br />all facilities constructed under this contract with a minimum 24 hour notice to the <br />County. All testing must conform to the Standard Specifications. All re—testing will <br />be paid by the Contractor. <br />4. The Contractor must obtain an Encroachment Permit from Caltrans, City of Stockton, <br />City of Lathrop, City of Manteca, City of Tracy, City of Ripon and other agencies <br />necessary for traffic control or any work outside of the County's Jurisdiction. <br />Payment for this will be considered to be included in the various items of work. <br />5. The Contractor must obtain all permits and licenses required for the construction <br />and completion of the project, and must perform all work in accordance with the <br />requirements and conditions of all permits and approvals applicable to the project. <br />6. The Contractor must exercise due caution and carefully preserve survey bench marks, <br />control points, reference points and all survey stakes, and must bear all expenses <br />for replacement and/or errors caused by their unnecessary loss or disturbance. <br />7. Areas in County right—of—way used by Contractor for staging and/or storage of <br />materials will be approved by the Engineer. The areas utilized by the Contractor for <br />staging and/or storage area must be restored to their original condition. Any <br />damages or unclean conditions to staging or storage areas must be repaired at the <br />Contractor's own expense. It will be the Contractor's responsibility to obtain <br />permission from the property owner to stage equipment or store materials on private <br />property. The Contractor must provide a letter of release from the property owner <br />of the areas utilized for staging and/or storage of materials. <br />8. Placement of "No Parking" signs/barricades must be placed no less than 72 hours <br />prior to work. <br />NO SCALE I PROJECT LOCATION MAPS — RD5 <br />AND GENERAL NOTES <br />DATE CHECKED DATE <br />55-11--116 <br />CRACK SEAL 2015-2016 <br />(Various Roads in Road Districts 1-5) <br />Sheet No. <br />5 of 6 <br />