Laserfiche WebLink
PCC Curb & Gutter <br />Where exists) <br />J 1 <br />q <br />Const <br />Limits of Clearinlg and Grubbing <br />Var Limits of Polymer Asphaltic Emulsion (Seal Coat) and Screenings Var <br />1'-2' Refer to Table on Sht No. 8 1 V-2 <br />I Center Divide/Curb (Where exists) <br />0 _, Match --Chip Seal <br />I <br />Chip Seal Match <br />0 © Existing Ir 1 Existing <br />Slope Slope <br />I I <br />E o` <br />o` <br />cw <br />0 <br />U @j <br />AC Dike or PCC <br />Curb (Where exists) <br />COUNTY OF SAN JOAQUIN I NO SCALE <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />Com., <br />Ta7ICe GwcYS I C Var 207,9 <br />TYPICAL SECTION AND <br />GENERAL NOTES <br />CHECKEDDATE <br />4 312c/t9 <br />CHIP SEAL 2018-2019 Sheet No. <br />arious Roads in Supervisorial Districts 1, 2, 3, 4 and 5) 2 of 12 <br />SHOULDER DETAIL <br />IL Existing Roadway <br />WITH CURB & GUTTER <br />SHOULDER DETAIL <br />WITHOUT CURB & GUTTER <br />TYPICAL SECTION RECORD DRAhir <br />2 2 / <br />NOTES: A Mp T1 i lf Mrlr* <br />wMeamp 5hoW <br />1. Chi Seal must be laced in single layer on existing or prepared asphalt concretePPgy9PPP pavement 8. <br />Very <br />OV TfW site tN v <br />The Contractor must street throughoutsurface. No chip seal is allowed on existing bridge decks or Portland Cement Concrete <br />surfaces including pavement, railroad crossings, etc. <br />perform sweeping the duration of the Chip Sealoperationsoftheprojectperthespecifications. Full compensation for these sweeping operations <br />2. Screenings must have fine gradation of i" maximum <br />must be considered as included in the contract unit price paid for various items of work and <br />no separate payment will be made therefor. <br />3. One week prior to the start of work, the Contractor must furnish to the Engineer a schedule 9• The Contractor must perform Chip Seal operations only on weekends on streets in close <br />showing proposed street closures on each half—day basis. No work will commence until this proximity to schools, or unless allowed by written approval from the Engineer. The ContractorscheduleisapprovedbytheEngineer. must not begin chip sealing a street after 1:00 PM without the approval from the Engineer. <br />4. All intersection radii within project limits must be sealed to existing edge of pavement, face of 10. Place Monument Frame and Cover at various locations, see Summary of Quantities for locationsdikeorlipofcurbandgutter. and quantities. <br />5. Before Chip Seal is to be applied to any area, the Contractor must protect all utility covers, including but not limited to <br />11. Areas in County right—of—way used by Contractor for staging and/or storage of materials willmaintenanceholes, water valves and survey monument frames and <br />covers. Contractor must remove protective covers after Chip Seal. Full <br />be approved by the Engineer. The areas utilized by the Contractor for staging and/or storageareamustbetocompensationmustbe <br />considered as included in the contract unit price for various items of work and no separate <br />restored their original condition. Any damages or unclean conditions to <br />staging or storage areas must be repaired the Contractor's <br />6. <br />payment will be made therefor. at own expense. It will be the <br />Contractor's responsibility to obtain permission from the property owner to stage equipment orSurfacepreparationworkmustbeasdirectedbytheEngineer. Locations and dimensions of <br />Pavement Repair will be determined by the Engineer store materials on private property. The Contractor must provide a letter of release from the <br />and must be placed 18 hours prior to <br />placing Chip Seal. property owner of the areas utilized for staging and/or storage of materials. <br />7. The Contractor is to remove and dispose all existing Thermoplastic Traffic Stripes and Pavement <br />12. Traffic delays due to construction operations must not exceed 10 minutes, or J mile of vehiclewhicheverfirst. Markings in all areas. Full compensation must be considered as included in the contract price <br />queue, occurs <br />for Remove Thermoplastic Traffic Stripes and Pavement Markings item of work and no additional <br />compensation will be made therefor. <br />COUNTY OF SAN JOAQUIN I NO SCALE <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />Com., <br />Ta7ICe GwcYS I C Var 207,9 <br />TYPICAL SECTION AND <br />GENERAL NOTES <br />CHECKEDDATE <br />4 312c/t9 <br />CHIP SEAL 2018-2019 Sheet No. <br />arious Roads in Supervisorial Districts 1, 2, 3, 4 and 5) 2 of 12