My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2021_PS-2100501 thru PS-2101000_ - PS-2100728
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2021
>
PS-2100501 thru PS-2101000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2021_PS-2100501 thru PS-2101000_ - PS-2100728
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2024 4:01:14 PM
Creation date
7/29/2024 3:58:13 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2100728
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2021
Notes2
South of Main Street & Wilhemina School
Type - Permit Process
Subdivision Improvements-Phase 2
Address
2260 Douglas Boulevard, Suite 110, Roseville,CA 95661
Application
Dr. Horton
Project #
PWP790121
Supplemental fields
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PS-2100728 , 202 <br />SPECIAL CONDITIONS FOR <br />SOLARI RANCH PHASE 2 SUBDIVISION IMPROVEMENTS <br />ENCROACHMENT PERMIT <br />1. Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes. <br />Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br />plated. During working hours, two-way traffic control shall be maintained with one lane open and <br />appropriate flaggers. <br />2. Access to all properties, including the school property, shall be maintained at all times except <br />when work is occurring at the access point. Minimal delays will be allowed to provide access <br />within the work zone area. Driveway access shall be fully restored at the end of each workday. <br />Driveways disturbed by the contractor shall be replaced with in-kind or better materials. <br />3. Wilhelmina School shall be notified in writing, as approved by the County, 48 hours in advance of <br />any impacts to their access. <br />4. Residents and businesses shall be notified in writing, as approved by the County, 48 hours in <br />advance of any impacts to their access. <br />5. Any areas where parking is to be restricted shall have signs noting the restrictions in place at <br />least 48 hours in advance. <br />6. School Buses shall be passed through the work zone with minimal delays. <br />7. Existing fences shall not be removed without written consent of the property owner. Such consent <br />shall be submitted to the County prior to the removal. Fences removed shall be restored with in- <br />kind or better materials. Restored fences shall not encroach into County right-of-way. <br />8. All destroyed or obliterated pavement markings must be replaced in kind by the permittee. Typical <br />pavement markings include but not limited to lane lines, centerlines, stop and stop ahead <br />legends, limit lines, raised pavement markers and miscellaneous delineators. <br />9. The Permittee is responsible for the preservation of survey monuments located within the area of <br />work herein permitted. Prior to the start of construction, survey monuments that potentially may <br />be disturbed shall be located and referenced by a Licensed Land Surveyor, and a Corner Record <br />filed with the County Surveyor. Any Survey Monuments disturbed during the course of <br />construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed <br />with the County Surveyor. (Land Surveyors’ Act Section 8771) <br />10. Trenches shall be maintained in a smooth and even condition to the satisfaction of the County <br />throughout the project limits at all times. <br />11. All trenches shall be completely backfilled or shored and plated at the end of each workday, and <br />the roadway restored to two-way traffic. If plating is to be used, a trench shoring and plating plan <br />suitable for traffic loadings shall be prepared by a registered civil engineer and submitted for prior <br />approval by the County.
The URL can be used to link to this page
Your browser does not support the video tag.