My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PW-ENCROACH-2401698
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2024
>
PW-ENCROACH-2401501 thru PW-ENCROACH-2402000
>
PW-ENCROACH-2401698
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2024 11:02:41 AM
Creation date
9/13/2024 11:02:29 AM
Metadata
Fields
Template:
Permits_Development
DocName
PW-ENCROACH-2401698
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2024
Notes2
2831 D. Street: Thirteenth St.; D St.; Loomis Rd.; Pock Ln. to 2831 D. Street
Type - Permit Process
Potholing for Utility Verification
Address
655 West Clay Street, Stockton,CA 95206
Application
Knife River
Project #
790145
Supplemental fields
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PW-ENCUTIL-2401698 September 12, 2024 <br />SPECIAL CONDITIONS FOR <br />KNIFE RIVERS POTHOLING POCK LANE SUBDIVISION <br />ENCROACHMENT PERMIT <br /> <br />1. Maintain traffic controls for all roads. Traffic control delays shall not exceed 10 minutes. <br />Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br />plated. During working hours, two-way traffic control shall be maintained with one lane open and <br />appropriate flaggers. <br /> <br />2. Access to all properties shall be maintained at all times except when work is occurring at the <br />access point. Minimal delays will be allowed to provide access within the work zone area. <br />Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br />contractor shall be replaced with in-kind or better materials. <br /> <br />3. Residents and businesses shall be notified in writing, as approved by the County, 48 hours in <br />advance of any impacts to their access. <br /> <br />4. Any areas where parking is to be restricted shall have signs noting the restrictions in place at <br />least 48 hours in advance. <br /> <br />5. School Buses shall be passed through the work zone with minimal delays. <br /> <br />6. Existing fences shall not be removed without written consent of the property owner. Such consent <br />shall be submitted to the County prior to the removal. Fences removed shall be restored with in- <br />kind or better materials. Restored fences shall not encroach into County right-of-way. <br /> <br />7. Work shall not be permitted within the San Joaquin County right-of-way between November 1 and <br />March 31 without prior authorization from the San Joaquin County Department of Public Works <br />Field Engineering Division, contact them at 209-953-7421. <br />8. All destroyed or obliterated pavement markings must be replaced in kind by the permittee. Typical <br />pavement markings include but not limited to lane lines, centerlines, stop and stop ahead <br />legends, limit lines, raised pavement markers and miscellaneous delineators. <br /> <br />9. The Permittee is responsible for the preservation of survey monuments located within the area of <br />work herein permitted. Prior to the start of construction, survey monuments that potentially may <br />be disturbed shall be located and referenced by a Licensed Land Surveyor, and a Corner Record <br />filed with the County Surveyor. Any Survey Monuments disturbed during the course of <br />construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed <br />with the County Surveyor. (Land Surveyors Act Section 8771) <br /> <br />10. The contractor shall use San Joaquin County Improvement Standard R-29 when backfilling <br />trenches/bell holes/potholes within the County right-of-way. <br /> <br />11. County roads shall be kept clean from mud and debris at all times along the access points and <br />work zone areas during entire project. All standard roadway striping and signage shall be clearly <br />visible, maintained and restored throughout the construction zone during and after the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.