Laserfiche WebLink
FOC (FACE OF CURB)EOP (EDGE OF PAVEMENTTahoe Group to Directional Bore and/or trench MINIMUM 48" (1) 1" water line 100' PER COUNTY STANDARD R-29Tahoe Group to Perform Hot tap to (E) WATER LINETEMP.BORE PITTEMPBORE PIT