N <br />Oo <br />('n <br />S <br />cf) <br />NOTES_ <br />1. ALL NEW IMPROVEMENTS SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF <br />THESE PLANS AND SPECIFICATIONS, AND THE LATEST EDITION OF THE COUNTY OF <br />SAN JOAQUIN STANDARD PLANS AND SPECIFICATIONS AND THE STATE OF <br />CALIFORNIA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS (WITH <br />EXCEPTION THAT ENGLISH UNITS ARE TO BE USED IN PLACE OF METRIC). <br />2. THE INTENT IS THAT THESE PLANS REQUIRE ALL LABOR AND <br />MATERIALS (EXCEPT AS SPECIFIED IN THE SPECIAL PROVISIONS) <br />NECESSARY AND PROPER FOR THE WORK CONTEMPLATED AND THAT THE WORK <br />BE COMPLETED IN ACCORDANCE WITH THEIR TRUE INTENT AND PURPOSE. <br />THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY REGARDING <br />ANY DISCREPANCIES AND AMBIGUITIES WHICH MAY EXIST IN THE PLANS OR <br />SPECIFICATIONS IF THE PLANS DESCRIBE PORTIONS OF THE WORK IN <br />GENERAL TERMS BUT NOT IN COMPLETE DETAIL, IT IS UNDERSTOOD THAT <br />ONLY THE BEST GENERAL PRACTICE IS TO PREVAIL AND THAT ONLY <br />MATERIALS AND WORKMANSHIP OF THE FIRST QUALITY ARE TO BE USED. <br />3. THE TYPES, LOCATION, SIZES AND/OR DEPTHS OF EXISTING <br />UNDERGROUND UTILITIES AS SHOWN ON THESE PLANS WERE OBTAINED FROM <br />"OUTSIDE SOURCES'. THE CONTRACTOR IS CAUTIONED THAT ONLY ACTUAL <br />EXCAVATION WILL REVEAL THE TYPES, EXTENT, SIZES, LOCATION, AND <br />DEPTHS OF SUCH UNDERGROUND UTILITIES, STACEY GRIFFITH AND ANTONIO M. CONTI <br />CAN ASSUME NO RESPONSIBILITY FOR THE COMPLETENESS OR ACCURACY OF <br />ITS DELINEATION OF SUCH UNDERGROUND UTIUTIES WHICH MAY BE ENCOUNTERED <br />BUT WHICH ARE NOT SHOWN ON THESE DRAWINGS. <br />4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE <br />LOCATION OF ALL EXISTING UNDERGROUND UTILITIES AND SHALL CONTACT <br />THE RESPECTIVE UTILITY COMPANIES PRIOR TO COMMENCEMENT OF WORK, <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION AND PRESERVATION <br />OF ALL SUCH FACILITIES IN THE AREA OF CONSTRUCTION, AND SHALL NOTIFY <br />CONSTRUCTION (UNDERGROUND SERVICE ALERT 1-800-642--2444), <br />5. THE CONTRACTOR'S ATTENTION IS DIRECTED TO SECTION 1540 <br />(A)(1) OF THE CONSTRUCTION SAFETY ORDERS (TITLE 8 CALIFORNIA <br />ADMINISTRATION CODE SECTION 1540), ISSUED BY THE OCCUPATIONAL <br />SAFETY AND HEALTH STANDARDS BOARD PURSUANT TO THE CALIFORNIA <br />OCCUPATIONAL SAFETY AND HEALTH ACT OF 1973, AS AMENDED, WHICH <br />STATE: <br />PRIOR TO OPENING AN EXCAVATION, EFFORT SHALL BE MADE TO <br />DETERMINE WHETHER UNDERGROUND INSTALLATION:I.E., SEWER, <br />WATER, FUEL, ELECTRIC LINES, ETC., WILL BE ENCOUNTERED AND, IF <br />SO, WHERE SUCH UNDERGROUND INSTALLATIONS ARE LOCATED. WHEN THE <br />EXCAVATION APPROACHES THE APPROXIMATE LOCATION OF SUCH AN <br />INSTALLATION, THE EXACT LOCATION SHALL BE DETERMINED BY <br />CAREFUL PROBING AND/OR DIGGING; AND WHEN IT IS UNCOVERED, <br />ADEQUATE PROTECTION SHALL BE PROVIDED FROM THE EXISTING <br />INSTALLATION. ALL KNOWN OWNERS OF UNDERGROUND FACILITIES IN <br />THE AREA CONCERNED SHALL BE ADVISED OF PROPOSED WORK AT LEAST <br />48 HOURS PRIOR TO THE START OF ACTUAL EXCAVATION. <br />6. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF THE <br />REMOVAL AND/OR RELOCATION OF ALL EXISTING UTILITIES WITH <br />RESPECTIVE UTILITY COMPANIES. <br />7. FINAL PAVEMENT WORK SHALL NOT OCCUR WITHIN THE ROAD RIGHT-OF-WAY <br />PRIOR TO COMPLETION OF UTILITY RELOCATION WITHOUT SPECIFIC <br />APPROVAL OF THE COUNTY OF SAN JOAQUIN. <br />8. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY FIELD <br />CHANGES MADE WITHOUT WRITTEN AUTHORIZATION FROM THE OWNER'S <br />REPRESENTATIVE. <br />9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO THE SITE AND <br />SURROUNDING AREAS RESULTING FROM OPERATIONS PRIOR TO ACCEPTANCE OF HIS WORK, <br />10. DURING CONSTRUCTION THE CONTRACTOR SHALL MAINTAIN THE <br />INTEGRITY OF EXISTING FACILITIES. THE CONTRACTOR IS RESPONSIBLE <br />TO REPAIR, TO THE SATISFACTION OF THE COUNTY OF SAN JOAQUIN, ANY <br />FACILITIES DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. <br />11, CONTRACTOR TO REFERENCE AND RESTORE ALL "RECORDED" EXISTING <br />MONUMENTS AND/OR PROPERTY CORNER REFERENCES DESTROYED, REMOVED OR <br />DISTURBED DURING THE COURSE OF CONSTRUCTION <br />12. CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB <br />SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, <br />INCLUDING SAFETY FOR ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT S <br />SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS <br />AND THAT CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE OWNERS, <br />SAN JOAQUIN COUNTY AND ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, <br />REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON <br />THIS PROJECT. <br />13. ANY CHANGES TO THE APPROVED IMPROVEMENT PLANS AND SPECIFICATIONS <br />MUST BE PREPARED AND CERTIFIED BY THE "ENGINEER", AND SHALL BE SUBMITTED S <br />TO THE DIRECTOR OF PUBLIC WORKS FOR APPROVAL PRIOR TO IMPLEMENTATION. <br />14, ALL TRAFFIC SIGNS AND MARKINGS SHALL CONFORM THE "MANUAL ON UNIFORM TRAFFIC <br />CONTROL DEVICES", CALTRANS TRAFFIC MANUAL AND S.J. COUNTY STANDARDS AND AS <br />SHOWN ON THE PLANS. <br />15, DRAINAGE FACILITIES SHALL BE MAINTAINED DURING PERIODS OF INCLEMENT WEATHER AND <br />RESTORED TO THEIR ORIGINAL CONDITIONS UPON COMPLETION OF THE WORK. <br />16. CONTRACTOR SHALL VERIFY ALL STREET NAMES WITH THE COMMUNITY DEVELOPMENT <br />DEPARTMENT BEFORE ORDERING STREET SIGNS, <br />17. WHENEVER PAVEMENT IS BROKEN OR CUT IN THE INSTALLATION OF THE WORK COVERED BY <br />THE SPECIFICATIONS, THE PAVEMENT SHALL BE REPLACED, AFTER PROPER BACKFILLING, <br />WITH PAVEMENT MATERIALS EQUAL TO OR BETTER THAN THE MATERIALS USED IN THE <br />ORIGINAL PAVING. <br />18. ANY CONSTRUCTION ACTIVITY THAT RESULTS IN THE DISTURBANCE OF AT LEAST ONE (1) ACRE <br />OF SOIL SHALL REQUIRE A STATE NPDES CONSTRUCTION PERMIT. <br />CONSTRUCTION NOTES: <br />1. THE CENTERLINE STATIONING SHOWN IS FOR REFERENCE ONLY. <br />THE CONTRACTOR SHALL LAYOUT IMPROVEMENTS FROM THE DIMENSIONS <br />SHOWN ON THE PLANS. ANY CLARIFICATION ON CONFLICTS, <br />DISCREPANCIES OR AMBIGUITIES SHOULD BE DIRECTED TO THE <br />DESIGN ENGINEER PRIOR TO THE CONSTRUCTION OF THE <br />IMPROVEMENTS. <br />2. WHERE PAVEMENT IS TO BE EXTENDED, EXISTING PAVEMENT <br />SHALL BE SAWCUT. <br />3. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN TEMPORARY <br />SIGNS FOR ALL REGULATORY TRAFFIC SIGNS REMOVED DURING THE COURSE <br />OF CONSTRUCTION. <br />4. THE CONTRACTOR SHALL PROVIDE OWN CONSTRUCTION WATER. <br />5. CONTRACTOR SHALL CLEAR AND GRUB BY DISKING AND THEN <br />ROUGH GRADE ALL LOTS SMOOTH. <br />6. CONTRACTOR SHALL PROVIDE DUST CONTROL MEASURES AT ALL TIMES <br />DURING CONSTRUCTION AS PER SECTION 10 OF THE STANDARD SPECIFICATIONS <br />OF THE STATE OF CALIFORNIA PER SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC <br />WORKS REQUIREMENTS, <br />-BENCHMARK <br />SAN JOAQUIN COUNTY BRASS CAP SET ON N.E. CONCRETE HEADWALL <br />LOCATED AT THE INTERSECTIC,N OF DUSTW AND JAHANT ROAD DESIGNATED <br />AS S J C BM L955 HAVING AN m ENATION OF 74 92' NGVD 29 <br />ROADWAY <br />IMPROVEMENTS <br />FOR <br />GRIFFITH GATE RANCHETTES <br />SAN JOAQUIN COUNTY, CALIFORNIA <br />SPECIFICATIONS: REFER TO MAJOR SUBDIVISION APPLICATION NO. PA --04-251 <br />SECTION 3-4 GUARANTEE <br />THE COMPLETED PROJECT, INCLUDING ALL WORK, MATERIALS, DEVICES AND EQUIPMENT, SHALL BE GUARANTEED BY THE THE <br />DEVELOPER AGAINST FAULTY WORKMANSHIP AND MATERIALS OR A PERIOD OF ONE YEAR AFTER FINAL ACCEPTANCE BY THE <br />DIRECTOR OF PUBLIC WORKS. THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL REPAIR AND/OR REPLACEMENTS INCLUDING ALL LABOR, <br />MATERIALS, EQUIPMENT, DEVICES, PLANT AND OTHER ITEMS OF WORK NECESSARY. TO SECURE THIS GUARANTEE, A BOND OR OTHER <br />SECURITY SHALL BE PROVIDED IN THE AMOUNT OF 20% OF THE VALUE OF WORK ESTIMATED BY THE ENGINEER. SAID BOND SHALL <br />CONTINUE IN FULL FORCE AND EFFECT FOR A PERIOD OF ONE YEAR FROM THE DATE OF THE FORMAL ACCEPTANCE OF THE WORK <br />BY THE DIRECTOR OF PUBLIC WORKS OR BOARD OF SUPERVISORS. <br />SECTION 3-5 INSPECTION DURING CONSTRUCTION.-- ANY IMPROVEMENTS CONSTRUCTED TO THESE <br />SPECIFICATIONS AND WHICH IT IS INTENDED THAT THE COUNTY WILL ASSUME MAINTENANCE <br />RESPONSIBILITY, MUST BE INSPECTED DURING CONSTRUCTION BY AN AUTHORIZED AGENT <br />OF THE DEVELOPER AND DIRECTOR. EACH PHASE OF CONSTRUCTION MUST BE INSPECTED <br />AND APPROVED PRIOR TO PROCEEDING TO THE SUBSEQUENT PHASES. <br />ANY IMPROVEMENTS CONSTRUCTED WITHOUT INSPECTION AS PROVIDED ABOVE OR CONSTRUCTED <br />CONTRARY TO THE ORDERS OR INSTRUCTIONS OF THE AUTHORIZED AGENT OF THE DEVELOPER <br />AND DIRECTOR WILL BE DEEMED AS NOT COMPLYING WITH SAN JOAQUIN COUNTY STANDARDS AND <br />SPECIFICATIONS, AND WILL NOT BE ACCEPTED BY SAN JOAQUIN COUNTY FOR MAINTENANCE <br />PURPOSES. <br />THE DEVELOPER WILL HAVE COMPACTION TESTS TAKEN ON ALL LOTS WHERE THE DEPTH OF FILL <br />IS GREATER THAN SEVEN (7") INCHES AND WITHIN THE STREETS, RE -TEST THAT ARE THE RESULT <br />OF THE CONTRACTOR'S FAILURE TO COMPACT THESE AREAS AS REQUIRED WILL BE BORNE BY THE <br />CONTRACTOR. <br />THE COUNTY DEPARTMENT OF PUBLIC WORKS WILL PERFORM FIELD INSPECTION FOR THIS PROJECT. <br />THE CIVIL ENGINEER, DIRECTOR AND DEVELOPER, OR THEIR AGENTS, SHALL AT ALL TIMES, HAVE <br />ACCESS TO THE WORK DURING ITS CONSTRUCTION, AND SHALL BE FURNISHED WITH EVERY REASONABLE <br />FACILITY FOR ASCERTAINING THAT THE MATERIALS AND THE WORKMANSHIP ARE IN ACCORDANCE WITH <br />THE REQUIREMENTS AND INTENTIONS OF THESE SPECIFICATIONS, SPECIAL PROVISIONS, AND PLANS. ALL <br />WORK DONE AND ALL MATERIALS FURNISHED SHALL BE SUBJECT TO REVIEW. THE REVIEW OF THE WORK <br />OR MATERIALS SHALL NOT RELIEVE THE CONTRACTOR AND DEVELOPER OF ANY OF THEIR OBLIGATIONS TO <br />FULFILL THEIR CONTRACT AS PRESCRIBED. <br />SECTION 3-7 RECORD DRAWINGS. --THE CIVIL ENGINEER SHALL KEEP AN ACCURATE RECORD OF ALL APPROVED DEVIATIONS <br />FROM THE PLANS AND SHALL PROVIDE A COPY OF THESE RECORDS TO THE DIRECTOR UPON COMPLETION OF <br />OF THE WORK. THESE ARE TO BE UTILIZED WITH THE INSPECTOR'S PLANS FOR PREPARING A COMPLETE AND <br />ACCURATE SET OF "RECORD DRAWINGS" FOR THE PERMANENT RECORDS OF THE COUNTY. PREPARATION OF THE <br />"RECORD DRAWINGS" IS THE RESPONSIBILITY OF THE DEVELOPER AND HIS CIVIL ENGINEER. "RECORD DRAWINGS" <br />SHALL BE SUBMITTED TO THE DIRECTOR PRIOR TO ACCEPTANCE OF WORK AS COMPLETE. <br />APPROVED DEVIATIONS SHALL BE RECORDED IN RED INK ON THE ORIGINAL APPROVED PLANS, NOT REPRODUCIBLE <br />COPIES. THE ORIGINAL PLANS SHALL NOT BE REMOVED FROM THE DEPARTMENT OF PUBLIC WORKS FOR <br />PREPARATION OF "RECORD DRAWINGS". A WORK AREA WILL BE AVAILABLE FOR MAKING ADDITIONS OR CORRECTIONS, <br />AS WILL THE "RECORD DRAWING" STAMP AND PEN WITH RED INK, IF REQUESTED. <br />SECTION 7 ALTERNATE A. <br />MAINTAINING TRAFFIC, —ATTENTION IS DIRECTED TO SECTIONS 7-1.08, "PUBLIC CONVENIENCE, "7-1.09, "PUBLIC SAFETY," <br />AND 12, "CONSTRUCTION AREA TRAFFIC CONTROL DEVICES," OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. <br />CONSTRUCTION AREA TRAFFIC CONTROL DEVICES SHALL BE IN ACCORDANCE WITH THE CURRENT MANUAL OF TRAFFIC CONTROLS <br />(CALTRANS) AND SUPPLEMENTED BY THE CURRENT WORK AREA TRAFFIC CONTROL HANDBOOK. (BUILDING NEWS). <br />THROUGH PUBLIC TRAFFIC SHALL BE PERMITTED TO PASS THROUGH CONSTRUCTION OPERATIONS AT ALL TIMES WITH AS LITTLE <br />INCONVENIENCE AND DELAY AS POSSIBLE. <br />THE CONTRACTOR SHALL FURNISH, ERECT AND MAINTAIN ALL CONSTRUCTION AREA TRAFFIC CONTROL DEVICES WITHIN THE PROJECT <br />AND AT ALL PUBLIC ROAD ENTRANCES TO THE PROJECT. <br />ECTION 16 (ALTERNATE A) <br />CLEARING AND GRUBBING --CLEARING AND GRUBBING SHALL CONFORM TO THE REQUIREMENTS IN SECTION 16, "CLEARING AND GRUBBING," <br />OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. <br />TREE BRANCHES EXTENDING OVER THE ROADWAY PAVEMENT AND WHICH HANG WITHIN 15 FEET OF FINISHED GRADE SHALL BE CUT OFF IN A <br />WORKMANLIKE MANNER. <br />BURNING WILL BE ALLOWED WHEN PERMITTED BY THE SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. <br />ECTION 17 WATERING.—WATERING SHALL CONFORM TO THE REQUIREMENTS IN SECTION 17, "WATERING," OF THE STANDARD SPECIFICATIONS AND <br />THESE SPECIAL PROVISION. <br />WATER FOR USE ON THIS PROJECT SHALL BE NONPOTABLE WATER UNLESS OTHERWISE APPROVED BY THE COUNTY IN WRITING FOR USE OF <br />POTABLE WATER AND SHALL BE FURNISHED AND APPLIED AS REQUIRED IN THE SPECIFICATIONS. <br />THE CONTRACTOR SHALL ADVISE THE COUNTY IN WRITING OF INTENDED SOURCE(S) TO BE USED, PRIOR TO STARTING WORT{ ON THE PROJECT. <br />NONPOTABLE WATER SUPPLY, TANKS, PIPES AND ANY OTHER CONVEYANCES OF NONPOTABLE WATER SHALL BE CLEARLY AND DISTINCTLY LABELED: <br />NONPOTABLE WATER <br />SECTION 19 ALTERNATE A DO NOT DRINK <br />EARTHWORK. --EARTHWORK SHALL CONFORM TO THE REQUIREMENTS IN SECTION 19, "EARTHWORK." OF THE STANDARD SPECIFICATIONS <br />AND THESE SPECIAL PROVISIONS. <br />ALL RELATIVE COMPACTION REQUIREMENTS OF SECTION 19-5, "COMPACTION," OF THE STANDARD SPECIFICATIONS, SHALL BE NOT LESS THAN <br />90 PERCENT. <br />THE REQUIREMENT OF THE SECOND PARAGRAPH OF SECTION 19-5.03, "RELATIVE COMPACTION (95 PERCENT), " OF THE STANDARD <br />SPECIFICATIONS, WILL BE REQUIRED ONLY IN THOSE AREAS SHOWN ON THE PLANS. <br />IN LIEU OF THE TOLERANCE SPECIFIED IN SECTION 19-1.038, "GRADE TOLERANCE," OF THE STANDARD SPECIFICATIONS, THE SURFACE OF <br />THE GRADING PLANE SHALL NOT BE MORE THAN 0.05 FOOT ABOVE OR BELOW THE GRADE ESTABLISHED BY THE ENGINEER. <br />BEFORE GRADE IS APPROVED BY THE COUNTY, ALL EARTHWORK (INCLUDING DRIVEWAYS AND SLOPES) SHALL BE COMPACTED TO GRADE. <br />UNLESS OTHERWISE SHOWN ON THE PLANS, ALL SURPLUS MATERIALS NOT TO BE SALVAGED, STOCKPILED OR DISPOSED OF AS PROVIDED IN <br />SECTION 19-2.06, "SURPLUS MATERIAL," OF THE STANDARD SPECIFICATIONS, SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND DISPOSED <br />OF AS PROVIDED IN SECTION 7-1,13, "DISPOSAL OF MATERIAL OUTSIDE THE HIGHWAY RIGHT OF WAY," OF THE STANDARD SPECIFICATIONS. <br />UNLESS OTHERWISE SHOWN ON THE PLANS, THE EXISTING PAVEMENT, WHEN USED AS EMBANKMENT, SHALL BE BROKEN UP INTO PIECES NOT <br />LARGER THAN 0.33 FOOT IN GREATEST DIMENSION. <br />SECTION 19 ALTERNATE C <br />EARTHWORK )STRUCTURE EXCAVATION & BACKFILL) .—STRUCTURE EXCAVATION AND BACKFILL SHALL CONFORM TO THE REQUIREMENTS IN <br />SECTION 19-3, "STRUCTURE EXCAVATION AND BACKFILL," OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. <br />ALL REFERENCES TO CULVERT EXCAVATION AND CULVERT BACKFILL ON THE PLANS SHALL BE DEEMED TO MEAN STRUCTURE EXCAVATION AND <br />STRUCTURE BACKFILL, RESPECTIVELY, IN THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. <br />STRUCTURE BACKFILL WHICH IS OUTSIDE OF THE PAVED PORTIONS OF THE ROADWAY, UNLESS OTHERWISE SPECIFIED ON THE PLANS, SHALL BE <br />NATIVE MATERIAL SELECTED FOR ITS RESISTANCE TO EROSION. <br />COMPACTION REQUIREMENTS: UNLESS OTHERWISE SHOWN ON THE PLANS, THE COMPACTION REQUIREMENTS WITHIN THE LIMITS OF STRUCTURE <br />EXCAVATION FOR PIPES AND ARCHES SHALL BE AS SHOWN ON STANDARD DRAWINGS. <br />PONDING AND JETTING WILL BE PERMITTED ONLY IF A MAINTENANCE BOND IN THE AMOUNT OF TWENTY PERCENT (20%) OF THE ENGINEER'S <br />ESTIMATE WITH A CORPORATE SURETY APPROVED BY THE COUNTY IS PROVIDED. SUCH A BOND SHALL BE PROVIDED BEFORE FINAL ACCEPTANCE <br />OF THE PROJECT BY THE COUNTY AND SHALL GUARANTEE THE REPAIR OF ALL DAMAGES DUE TO FAULTY MATERIALS OR WORKMANSHIP PROVIDED <br />OR DONE BY THE CONTRACTOR. THE GUARANTEE SHALL REMAIN IN EFFECT FOR A PERIOD OF THREE (3) YEARS AFTER THE DATE OF FINAL <br />ACCEPTANCE OF THE PROJECT BY THE COUNTY OR BOARD OF SUPERVISORS. <br />SECTION 22 FINISHING ROADWAY. --FINISHING ROADWAY SHALL CONFORM TO THE REQUIREMENTS IN SECTION 22, -FINISHING ROADWAY,° OF THE STANDARD <br />SPECIFICATIONS. <br />V. <br />- COUNTY OF SAN JOAQUIN DEPARTMENT OF PUBLIC WORKS I SFAL <br />I <br />SPECIFICATIONS CONT: <br />SECTION 23 DR NEWAYS. —ATTENTION IS DIRECTED TO THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. <br />PAVED DRIVEWAYS AND FRONTAGES SHALL BE SLOPED TO DRAIN. <br />SECTION 26 ALTERNATE A <br />AGGREGATE BASE.—AGGREGATE BASE SHALL CONFORM TO THE REQUIREMENTS IN SECTION 26, "AGGREGATE BASES," OF THE STANDARD <br />SPECIFICATIONS AND THESE SPECIAL PROVISIONS. <br />AGGREGATE BASE SHALL BE CLASS 2. <br />THE COMBINED AGGREGATE SHALL CONFORM TO THE GRADING SPECIFIED FOR THE 3/4 -INCH MAXIMUM AGGREGATE. <br />THE R -VALUE REQUIREMENT MAY BE WAIVED, PROVIDING THE AGGREGATE BASE COMFORMS TO THE SPECIFIED GRADING AND <br />DURABILITY AND HAS A SAND EQUIVALENT VALUE OF 33 OR MORE. <br />SECTION 39 ALTERNATE 8 <br />ASPHALT CONCRETE BASE. --ASPHALT CONCRETE BASE SHALL CONFORM TO THE REQUIREMENTS IN SECTION 39, "ASPHALT CONCRETE," <br />OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. <br />ASPHALT CONCRETE BASE SHALL. BE TYPE "B". <br />AGGREGATE FOR 3/4" MAXIMUM MEDIUM GRADATION ASPHALT CONCRETE MAY BE USED IN LIEU OF AGGREGATE FOR ASPHALT CONCRETE BASE. <br />THE AMOUNT OF ASPHALT BINDER TO BE MIXED WITH THE AGGREGATE SHALL BE BETWEEN 5% AND 7% BY WEIGHT OF THE DRY AGGREGATE. <br />THE EXACT AMOUNT OF ASPHALT BINDER TO BE MIXED WITH THE AGGREGATE WILL BE DETERMINED BY THE ENGINEER AND DIRECTOR. THE AR VI P <br />VISCOSITY GRADE OF THE ASPHALT BINDER SHALL BE 4,000 UNLESS OTHERWISE SHOWN ON THE PLANS. THE PROVISIONS OF PARAGRAPHS 5 NO SCALE <br />THROUGH 8 OF SECTION 39-3.03, "PROPORTIONING," OF THE STANDARD SPECIFICATIONS, SHALL NOT APPLY TO THIS PROJECT. <br />WHEN THE ASPHALT CONCRETE BASE IS TO BE PRODUCED IN A BATCH PLANT, THE ASPHALT CONCRETE BASE SHALL BE PROPORTIONED AND <br />MIXED BY THE AUTOMATIC METHOD. <br />SHEET INDEX <br />SHEET NO. <br />1. <br />DESCRIPTION <br />TITLE SHEET <br />2. <br />PLAN & PkFILE GRIFFITH GATE LANE <br />-N- <br />WT <br />JAH m <br />RaO <br />PLAN & PROFILE GRIFFITH GATE LANE <br />BRITTANY <br />STA. 26+50-36+47.13 <br />4. <br />DETAIL SHEET <br />LANE <br />S/TE <br />m <br />THE EXACT AMOUNT OF ASPHALT BINDER TO BE MIXED WITH THE AGGREGATE WILL BE DETERMINED BY THE ENGINEER AND DIRECTOR. THE AR VI P <br />VISCOSITY GRADE OF THE ASPHALT BINDER SHALL BE 4,000 UNLESS OTHERWISE SHOWN ON THE PLANS. THE PROVISIONS OF PARAGRAPHS 5 NO SCALE <br />THROUGH 8 OF SECTION 39-3.03, "PROPORTIONING," OF THE STANDARD SPECIFICATIONS, SHALL NOT APPLY TO THIS PROJECT. <br />WHEN THE ASPHALT CONCRETE BASE IS TO BE PRODUCED IN A BATCH PLANT, THE ASPHALT CONCRETE BASE SHALL BE PROPORTIONED AND <br />MIXED BY THE AUTOMATIC METHOD. <br />SHEET INDEX <br />SHEET NO. <br />1. <br />DESCRIPTION <br />TITLE SHEET <br />2. <br />PLAN & PkFILE GRIFFITH GATE LANE <br />STA. 10+00-26+50 <br />3. <br />PLAN & PROFILE GRIFFITH GATE LANE <br />STA. 26+50-36+47.13 <br />4. <br />DETAIL SHEET <br />5. <br />GRADING PLAN <br />VYNLN EDGE OF NOTTLE55 CKtlt THAN 5AFEET INOBE LENGTH�AND ALL THE LOOSE MATEINIIJ, IML RIAL REMOVED. LEGEND: SURFACE SWALL BE CLEANED BY SCRAPING WITH A METAL LEGEND: <br />PAINT BINDER (TACK COAT) SHALL BE APPLIED AT A RATE OF APPROXIMATELY 0.05 GALLON PER SQUARE YARD, UNLESS OTHERWISE SHOWN ON <br />THE PLANS. P.U.E. PUBLIC UTILITY EASEMENT <br />THE ASPHALT CONCRETE BASE SHALL BE SPREAD WITH EQUIPMENT THAT WILL PROVIDE A UNIFORM LAYER. EQUIPMENT WHICH REQUIRES DRIFTING, M. & P. MAPS AND PLATS <br />SPOTTING OR OTHERWISE SHIFTING THE MATERIAL OR WHICH CAUSES SEGREGATION OF THE MATERIAL SHALL NOT BE USED. S.J.C.R. SAN JOAQUIN COUNTY RECORDS <br />ASPHALT CONCRETE BASE SHALL BE PLACED IN LAYERS NOT TO EXCEED 0.5 FOOT IN COMPACTED THICKNESS. THE LAYER PLACED ON THE a UTILITY POLE <br />BASEMENT MATERIAL SHALL HAVE A MINIMUM THICKNESS OF 0.3 FOOT AFTER COMPACTION, UNLESS OTHERWISE DESIGNATED ON THE PLANS. <br />IN ADDITION TO THE ROLLING REQUIREMENTS OF SECTION 39-6.03, "COMPACTING," OF THE STANDARD SPECIFICATIONS, THE MATERIAL SHALL BE P — UTILITY POLE LINE <br />ROLLED UNTIL R REACHES A MINIMUM OF 95% RELATIVE COMPACTION, BASED ON STABILOMETER BRIQUET DENSITY. S.J.C. STD. DWG. SAN JOAQUIN COUNTY STANDARD <br />BEFORE PLACING ASPHALT CONCRETE BASE SHALL BE NO HIGHER THAN 150' F. DRAWING NUMBER <br />THE FINISHED SURFACE OF ASPHALT CONCRETE BASE SHALL NOT VARY MORE THAN 0.05 FOOT ABOVE OR BELOW THE GRADE ESTABLISHED BY THE MONUMENT GRATE & COVER TO BE <br />ENGINEER AFTER THE MATERIAL HAS REACHED A TEMPERATURE OF 150' F. INSTALLED (SEE DETAIL 8 SHEET 4) <br />SECTION 39 ALTERNATE E <br />LIQUID ASPHALT (PRIME COAT). --LIQUID ASPHALT (PRIME COAT) SHALL CONFORM TO THE REQUIREMENTS IN SECTIONS 39, "ASPHALT CONCRETE," AND <br />93, "LIQUID ASPHALT," OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. <br />LIQUID ASPHALT SHALL BE GRADE SC -70 OR SD -250 AND SHALL BE APPLIED AT THE APPROXIMATE TOTAL RATE OF 0.25 GALLON PER SQUARE YARD <br />IN ONE APPLICATION. THE GRADE AND EXACT RATE OF APPLICATION WILL BE DETERMINED BY THE ENGINEER AND THE DIRECTOR. <br />LIQUID ASPHALT SHALL NOT BE APPLIED WHEN THE ATMOSPHERIC TEMPERATURE IS BELOW 50' F. <br />AT LOCATIONS WHERE PUBLIC TRAFFIC IS BEING ROUTED OVER THE ROADBED TO BE TREATED, THE PRIME COAT SHALL NOT BE APPLIED TO MORE THAN <br />ONE-HALF THE WIDTH OF THE TRAVELED WAY AT A TIME, AND THE REMAINING WIDTH SHALL BE KEPT FREE OF OBSTRUCTIONS AND OPEN FOR USE BY <br />PUBLIC TRAFFIC UNTIL THE TREATMENT FIRST APPLIED IS READY FOR USE BY PUBLIC TRAFFIC. <br />LIQUID ASPHALT SHALL NOT BE APPLIED UNTIL A MINIMUM OF 24 HOURS AFTER THE COUNTY HAS ACCEPTED THE AGGREGATE BASE FOR SURFACE TOLERANCES <br />AND COMPACTION REQUIREMENTS. <br />SECTION 56 STREET SIGNS. --ATTENTION IS DIRECTED TO SECTION 56 OF THE STANDARDS SPECIFICATIONS, THE STANDARD DRAWINGS AND THESE SPECIAL PROVISIONS. <br />A. MATERIALS <br />THE VARIOUS MATERIALS OR FABRICATIONS THEREOF SHALL CONFORM TO THE FOLLOWING REQUIREMENTS: <br />1. STREET SIGNS SHALL HAVE A HORIZONTAL DIMENSION OF 24 INCHES, 30 INCHES LONG OR 36 INCHES AND A VERTICAL DIMENSION OF 9 INCHES, DIAMOND GRADE, <br />2. STREET SIGNS SHALL BE COMPLETELY REFLECTORIZED ON A DOUBLE FACE FLAT BLADE SIGN, SINGLE FACE, BOLT THROUGH (IN RURAL LOCATIONS). <br />3. STREET SIGN SHALL BE ANODIZED ALUMINUM WITH A THICKNESS OF .080 INCHES. <br />4. THE LEGEND FOR STREET SIGNS SHALL BE WHITE LETTERS ON A GREEN BACKGROUND. <br />5. STREET SIGN POSTS SHALL BE LONG ENOUGH TO PROVIDE A MINIMUM HEIGHT OF 7 FEET FROM THE BASE OF THE POST TO THE BOTTOM OF THE LOWER <br />SIGN, AN OVERALL MAXIMUM HEIGHT OF 10 FEET AND 30 INCHES EMBEDIMENT IN THE GROUND. <br />6. POSTS SHALL BE GALVANIZED, EXTRA STRONG, 2 INCHES NOMINAL DIAMETER, 2" SQUARE PERFORATED TUBE AND 12 GAUGE. <br />B, INSTALLATION <br />THE INSTALLATION OF STREET SIGNS SHALL CONFORM TO THE FOLLOWING REQUIREMENTS: <br />1. POSTS SHALL BE DRIVEN OR SET INTO THE GROUND TO A DEPTH OF 30 INCHES AT LOCATIONS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER <br />AND DIRECTOR. NO CONCRETE SHALL BE USED, <br />SECTION 81 MONUMENTS --MONUMENTS SHALL CONFORM TO THE REQUIREMENTS IN SECTION 81, "MONUMENTS,"OF THE STANDARD SPECIFICATIONS, STANDARD <br />DRAWINGS AND THESE SPECIAL PROVISIONS. <br />SECTION 84 TRAFFIC STRIPES AND PAVEMENT MARKINGS --TRAFFIC STRIPES AND PAVEMENT MARKINGS SHALL CONFORM TO THE REQUIREMENTS IN SECTION B4, "TRAFFIC <br />STRIPES AND PAVEMENT MARKINGS," OF THE STANDARD SPECIFICATIONS. <br />SECTION 86 STREET LIGHTS --STREET LIGHTS SHALL CONFORM TO THE REQUIREMENTS IN SECTION 86,"SIGNALS, LIGHTING AND ELECTRICAL SYSTEMS," OF THE STANDARD <br />SPECIFICATIONS, THE SAN JOAQUIN COUNTY IMPROVEMENT STANDARDS AND STANDARD DRAWINGS. <br />--mmz <br />I� <br />I�1 <br />Lor L LOT 2 <br />!q <br />20'- <br />20' <br />1 <br />_ ... <br />�— —� —%NL <br />'ta.uL w4mm <br />I <br />I <br />11 <br />i LOT 12 Lor 11 <br />It SHEET 3 <br />�q <br />ib <br />UTILITY PROVISIONS: <br />STREET LIGHTS: CSA NO. 49 (ZONE L1) <br />STORM DRAINAGE: SWALES & RETENTION BASIN <br />WATER: PRIVATE WELLS <br />SANITARY: PRIVATE SEPTIC SYSTEM <br />GAS: PG&E <br />ELECTRIC: PG&E <br />TELEPHONE: SBC <br />APPROVED BY: LIBERTY FIRE DISTRICT <br />4- <br />1. &&,�;i.5 <br />SIGNATURE DATE <br />� I <br />1 I� <br />i I <br />I Il LIT 4 LOT 5 LOT 6 <br />I ! <br />it <br />II Il� <br />II II � SLSMW _ <br />�+W RM >Ir <br />11 <br />I -lir PI 10, <br />GRIFFITH GATE LINE ( ►;!a Q) ,. RIM ,r <br />tori lo LOT 9 <br />SHEEP 2 <br />JAHANT <br />M.P.sr�Nc nrwN+c� a+sN <br />KEY MAP <br />NOT TO SCALE <br />R 1 0 N S : "too - t ,- \V •. <br />_-:0 r �'� �� -� ANTONIO M. CONTI — CIVIL ENGINEER JOB NO. 0400 <br />R t r 1 o DATE er APPROVEDDATE <br />SENIOR CIVIL ENGINEER m <br />RC`E NO (v 5-33 EXP DATE: 6�3ole, a No. 62009 _Z P.O. BOX 1396 PHONE (209) 476-0970 oAT E: GATE O1 9/29/{ <br />* EXP. 9/30/2005 WOODBRIDGE, CALIFORNIA 95258 DESIGN SJG <br />_ <br />DATE r r 9rF CIVILFp��(A R.C.E. N0: 62009 DRAWN SJG <br />DIRECTOR OF PuKTC WORKS 0fi CALF <br />A !�— <br />COUNTY OF SAN JOAQUIN A. M. CONTI, CIVIL ENGINEER EXP. DATE: 9/3 . 0 05 CHECKED AMC <br />RANCHETTES <br />BOOK 32, PAGE 89 <br />TITLE SHEET <br />GRIFFITH GATE RANGHETTES <br />SAN JOAQUIN COUNTY, CA <br />SHEET <br />OF 5 SHEETS <br />