My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2024_PS-2400000 thru PS-2400500_ - PS-2400439
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2024
>
PS-2400000 thru PS-2400500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2024_PS-2400000 thru PS-2400500_ - PS-2400439
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2024 8:44:37 AM
Creation date
10/2/2024 8:44:11 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2400439
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2024
Notes2
W/S of Mariposa Rd. S/O Section Ave.
Type - Permit Process
Pole Replacements
Address
PO Box 3031, Modesto,CA 95353
Application
Pacific Gas & Electric-Modesto
Project #
PWP730052
Type
Utility Encroachment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Special Conditions for -2- <br />ENCROACHMENT PERMIT <br />12. Above ground vaults, panels and/or other similar facilities will be allowed within the right-of-way if <br />located as far to the outside edge as possible. Utility vaults shall be located a minimum of 4-0 <br />from edge of pavement. <br />13. County roads shall be kept clean from mud and debris at all times along the access points and <br />work zone areas during entire project. All standard roadway striping and signage shall be clearly <br />visible, maintained and restored throughout the construction zone during and after the project. <br /> <br />14. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br />free of dirt, mud and debris during construction activities. The contractor shall provide daily, and <br />as determined to be necessary by County inspectors, street sweeping using a modern <br />mechanical or vacuum-assisted street sweeper. <br /> <br />15. The contractor shall not conduct construction operations in rain or heavy fog conditions.
The URL can be used to link to this page
Your browser does not support the video tag.