Laserfiche WebLink
irr (-nu I un ninr —.. v <br />BERM CROSSING <br />2 <br />'7 <br />INSTALL 3 PIPE <br />GUIDES AROUND ELBOW <br />12" HDPE ELBOW <br />TOWARDS ACTIVE FILL AREA <br />PIPE GUIDE 2'-O" <br />12" HDPE HEADER <br />nt <br />12" HDPE ELBOW -- - <br />SLOPE 2% MIN.,�,� <br />l� <br />INSTALL PIPE ANCHOR <br />BERM �` 5 <br />PROTECT EXISTING DITCH LINER <br />(SEE NOTE 1) <br />INSTALL NO PIPE GUIDES <br />IL OV IN THIS AREA <br />TRANSITION OVER BERM Wlhi HEADER <br />SCA <br />LE: N 1 G7- <br />3" <br />KANAFLEX HOSE (2' LONG) W/ POWER LOCK <br />CLAMPS. PAINT HOSE WITH WHITE LATEX PAINT. <br />(2 LOCATIONS) <br />3" HDPE SDR 11 <br />1FWNSIlION OVER BERM WITH LA <br />CHECKED DATE APPROVAL RECOMMENDED DATE <br />MOORE/ LEVERS 11/23/0 - r1 - <br />-c�k ��. l5,Iq <br />NOTE: <br />1. CONTRACTOR SHALL PROTECT EXISTING DITCH LINER BY PLACING SCRAP CARPET OR <br />EQUIVALENT IN DITCH WORKING AREA. REMOVE SCRAP CARPET TO LANDFILL <br />WORKING FACE WHEN HEADER INSTALLATION IS COMPLETE. <br />z" ur= cnn 11 <br />/' i <br />ASPHALT <br />AGGREGATE BASE <br />2„ <br />2 <br />+ <br />- <br />r <br />++a++a+aaaai +a4a ++++�. + +++++ ++ <br />aa`t+++ai++ f+f afafa++f+ r•.++r.+++a+++ar+++++ <br />+ia a + + ++ar+a+ + +++ + + + a +i+++ +r+ + r r +++ a a a r a + + + a + a++r.+*+ <br />7— r—♦- a!—+ t T• �+T err r� T'4 T+T+TTi <br />a + f i a <br />+—+ <br />r + • + i + + + + + i a r f f + + a ♦ + + + + • • 4 f + 4 <br />+ + a a a i a + + + + r + + + r r ♦ + + a + + + r r + <br />+i�t a3� +S+La+sraa_a �+�+ <br />INSTALL 12 DIA. HDPE PIPE SLEEVE TO PROTECT PIPES J <br />1" HDPE SDR 9 EQUALIZATION LINE <br />2" X 1" HDPE REDUCER <br />1" HDPE SDR 9 CONDENSATE LINE --� <br />1" HDPE SDR 9 AIR LINE -- <br />SLOPE CONTINUOUSLY 2% MIN <br />Do - <br />12" LFG HEADER HDPE SDR 17--J <br />6" HDPE SPARE <br />AT SAME ELEVATION AS <br />12" HEADER <br />8" HDPE <br />CONDENSATE <br />SUMP <br />CONDENSATESUM P <br />CONDENSATE SUMP (SEE SPECIFICATIONS) <br />36" MIN <br />12" HDPE ELBOW <br />12" X 8" REDUCER <br />8" FLANGE <br />tI TO FLARE STATION <br />HDPE VAULT MATCH HEIGHT 6" SCH 80 PVC BLIND FLANGE <br />OF BLOWER SKID <br />INLET <br />+ + + + <br />a+a+a++a r + + + 4 + +a♦+ra++ia++a araa + + + + + +4f +a+4+aa * • a a + a <br />a + +++++++♦+++++++++++♦++a++ + ♦ + a + a ++++++++i++a +++ + a a ♦+aa+++a++i+ + + + +++ <br />T+T+T TT �F TYTaT f1 f� TY T+T �F ———--+ <br />+++ f a++ i i 4+♦ +++ i f f ++ +i i+ + i + i f 4+ <br />+ + + + a + a a a ♦ + + + a <br />t�i�rr�a. r_+#�+y+++�+a tt a+a++ a ♦a++a ♦.�t++� �at_tai — <br />ASPHALT SURFACE <br />2- AGGREGATE BASE <br />t <br />12" LFG HEADER HDPE SDR 17 <br />6" LFG HDPE SPARE <br />PEA GRAVEL BACKFILL <br />1" HDPE SDR 9 AIR LINE <br />SLOPE CONTINUOUSLY 1% MIN 12" HDPE TEE <br />SAND <br />12" X 2" REDUCER <br />2" HDPE SDR 11 <br />SAND <br />COMPACTED 12" PEA GRAVEL BASE <br />NOTES: <br />1. DOUBLE WRAP ALL METAL FITTINGS WITH PIPE WRAP TAPE. <br />2. USE TEFLON TAPE OVER TEFLON PIPE PASTE FOR STAINLESS STEEL FITTINGS TO SEAL THREADED PIPE. <br />w <br />Q <br />0 <br />z <br />O <br />U5 <br />W <br />ry <br />I <br />2 <br />W <br />H <br />cn <br />a <br />J <br />U� <br />zf5 <br />_cl) <br /><F -z z <br />W ON <br />�cy) <br />zLLU <br />O <br />IrW)G <br />zz= <br />LLi O <br />r UNZ <br />D G <br />D <br />n ,\ <br />D <br />LO <br />0 <br />V) <br />a <br />0 <br />J <br />o <br />w <br />I <br />D <br />cc <br />Z <br />LOU <br />Q <br />M <br />Orf <br />H <br />_ <br />Q <br />of�. <br />o <br />Z <br />V <br />LL- <br />Q <br />Z <br />� <br />w <br />��//�� <br />V � <br />>-M� <br />F <br />^ <br />V <br />U <br />z <br />z N <br />Z <br />�O <br />Qw <br />J <br />Q <br />O <br />—' <br />U <br />cn <br />V <br />T <br />i <br />F- <br />Z <br />� <br />V) <br />JQ <br />CD <br />of <br />M <br />o <br />�s <br />0 <br />I <br />m <br />� <br />cD <br />o <br />C <br />Z <br />0 <br />W �, <br />N <br />U <br />v)� <br />O 0) <br />JN <br />J <br />� I <br />X <br />Lu <br />orn <br />Q � <br />QN <br />Y. Q <br />m <br />z <br />Z I <br />`0 <br />w <br />w0 <br />Loo <br />- <br />W LLJ <br />J U U <br />Y U C) <br />LLJ .. <br />�� <br />w <br />I� < <br />N <br />r <br />new <br />z�m <br />�N <br />o� <br />DATE: <br />5/4/2005 <br />SCALE: <br />AS SHOWN <br />SHEET <br />C-7 <br />8 of 15 sheets <br />