Laserfiche WebLink
0 <br />1 <br />I� <br />II <br />---- - - <br />ROOF OVER <br />N CANOPY <br />0 1 <br />o 1(!2 <br />I <br />(D 0 I -- <br />1 <br />I <br />FOR DETAIL OF <br />.1 Tco HIS AREA, SEE <br />N DRAWING NO. A10 <br />(�2 <br />2 <br />0 v -- <br />- - r=----- - FIRST FLOOR REFLECTED <br />,°" 4'-°"L, "'-6" CEILING PLAN <br />'SECOND FLOOR1/$"=1'-0" No°sINGEATTENTRANCE <br />SECOND FLOOR _REFLECTED <br />PLAN DOOR - SEE DWG #S8 CEILING PLAN <br />I <br />1/8"=1'-0" 11 12 13q <br />15 1/8"=1'—o" <br />-- 16 <br />- --- <br />25'-0" 25'-0" 25'-0" 25'-0" 25'-0" 25'-0" <br />CANOPY DETAILS I II I 8" DIA. PIPE CONCRETE <br />SEE 8'-4" 8'-4" 4'-2" 1, 12'-6" 12'-6" FILLED GUARD POSTS <br />A �-- - �W � <br />eD <br />12Fp � I p 0(TYPICAL) SEE DETAIL 2i� I f -4x4 POST -v • D' �� • 1 • e • I • N 6" C 5 • <br />1311 — <br />0 (! 4 PERSON --� _LI <br />--- - - - _ _ _ SEE _NOTE 5 FOR <br />I �SHOWER COL.SUSPENDED UNIT HEATERS --- SHELVING INFORMATION <br />j 1 0 6" X 8" X 16" (4 PLACES) TYPICAL fO <br />CONCRETE CONC. MASONRY <br />BLOCK WALL TO <br />o MASONRY W I °1 SECOND FLOOR MAINTENANCE BAYS 1' 2" THK PARTS STORAGE I <br />BLOCK 1 I PLATE LINE I I <br />� COLUMN - I C ECKERED D <br />11 <br />----- M EqS' _ D� - -� r- -i r---� r---� S L PLATE ---� r --- <br />I 1 8 r ---I r ---i <br />' ' ' ' I ITH SKID <br />01 I <br />RM. <br />l.y� 2 I I I I I I I 1 i I �, I I I 1 0 I I I I <br />_ I I I I I I I I RESISTANT I I I I I 2'-0" <br />I I I I <br />' g I I I I I -}- -+- I I I I I I I I I <br />1 WA v. 1 I I I I I ' -j—I_ .I _.{ : 1,-j- LINING I I I I I <br />1 +' 1 I 1 1 I I I I I I I I I <br />-� L t- 1- -r -1 y- J <br />I I I I I I I I I I I 1 I I I I <br />f 0 -;bj H�LL rIMEo' ' -°D I I I 12I IMETAL CLOCK-"= I I I I I I I I I I I I <br />1 <br />I 1 I I 1 r I 1 I 1 12I '-G" I W$E MESH PARTIIII <br />ION <br />THRESHOLD 5'-4" 5'-0" 42'-0 (TYPICAL) 1 1 1 I I I I I 10'0" HIGH I <br />D <br />_l L ---J L ---J L ---J F- -I L ---J - -J �- - L ---J L ---J I <br />' 1 I 1 R I 14 65'-0" LONG CONTINUOUS 1 Ill <br />STL FRAME <br />� i U D.F. DD�ICE I RIDGE VENTILATOR ABOVE FOR OVERHEAD I STL FRAME <br />-- - 0 MAKER 4 Al OIL/LUBE 11 I OIOL/L°UBE HEAD <br />I JAN._ SERVICE LINES I SERVICE LINES <br />L ! S NK D . -Co 1 SEE DETAIL III ' ' SEE DETAIL 4 <br />2 .I I - - I� I <br />--- ------------- --- <br />16" - -- 3R u:- w�-l� �' --- -- ---- S� -I- - - - - - —F.D-- o D �- ---� s7 - I <br />7 -- - - - <br />0 12" �_ 361 SH 2 L---- ------- I--LOOR HOIST-�--- --- 7 ----J <br />I 1 FOUNTAIN ~ <br />- p I I III 5/8" TYPE 'X' GYP BD <br />OMENS 1 I �-- HYDRAULIC 6'-9" 3'' o" 5'-6" 3'' o" 6' 9" ENTIRE LENGTH OF WALL <br />FLOOR HOIST SEE DETAIL <br />o I III 1 <br />0 00 1 SHOWER 40 C R I I I I 0 o A7 <br />1 in I I I i f <br />I -- <br />IRO 1 �- � --- � i--- � � --_ � , 1 , � --_ � I I --{- � � -�- I � ° i- i r ___ i � <br />I I 1 <br />c0 SHOWER <br />I I I I I I I I I I I I I I <br />�oJ i i TELEPHONE I i i i o I 1 I I L- 1 1 I 1 I I 1 I I MOTOR bIL <br />8" X 8" X 16" - CLOSET 1 I ' 1 i ' I i -r— L = T - -- - <br />CONC. MASONRY rS NK -'" - I D I I I 1 o I I HYDRAU� IC OIL <br />BLOCK WALL UNDER COUN"E 4� i i i i M 1 I I ' 1 I <br />6 -0' HIGH 1 1 1 1 I I I I I I I =p 1 GREASE I DRUM <br />- REFRIGERAT R I I I <br />Q PARTITION2 1 1 I I 1 ' i i i i i i i i -I 8 1 i i i i _ <br />0 2 I f7YA I �D.. 4, - L_ -_J L ---J L __J L_ _J I _ J L _ L_ _J L___J <br />LUNCH OFFICE AREA <br />N 2� 6 <br />3 io ( , <br />I� ,( ROOM r I S o„ x 11 -o" I I <br />- �D zi I TRANSLUCENT ROOF AIR <br />�5_/ 4"X4" POST 1 I PANELS (TYPICAL) ZTANKAL 2TANKAL COMPRESSOR <br />RECEIVER <br />- - <br />I <br />FOR DETAIL OF THIS AREA _ 5 <br />SEE DRAWING NO. A10 ' ' 12'-6” <br />N I I 12" <br />rn I 12'-6" D <br />% I D <br />o i 16'-816'-8" <br />FIRST FLOOR PLAN <br />A1/8,, =1 ' _0" <br />0 <br />Q <br />a <br />i <br />10 25'-0" 1 1 <br />I i BOX IN STL COLUMN <br />WITH WOOD FRAMING <br />8'-0" 9'-0" (TYP 4 PLACES) <br />I <br />0 <br />I <br />2R <br />OFFICE 0 0 <br />AREA -I <br />rn <br />8'-4" <br />42" HIGH D <br />WALL 13 v <br />STORAGE <br />/D\ <br />OW o <br />10 __ 3R I 0 00 <br />D OMENS ^I ( Ln <br />1 1 <br />RM 1 �, <br />DN -- - - 00 <br />D i -0 <br />SINK 1 2 &D -\N <br />❑ JAN. <br />I D .I <br />REFIRG-G.. 11 <br />-1 <br />SPACE El! N M <br />DF. 1 <br />o = /_w <br />E <br />10 ❑ W I <br />3R <br />F VEN ING 2 X 6 STUDS <br />IFMA H_ 16 O.C. THIS <br />ENTIRE WALL <br />W ALONG COLUMN <br />2R LINE 11 <br />- 4"I 5'-0" o�4' - 8" 3'- 8" <br />I � I <br />- - 0) <br />LUNCH ROOM <br />2R 0 <br />101_0„ <br />2 i 2 I 5 <br />mmmm -------- - ---. - - -im I N. <br />M ETAI <br />® C <br />10 11 <br />RI <br />SI <br />GYP B <br />SOFFIT <br />+-7'-0' <br />" TYPI <br />YP. B[ <br />EILINC <br />+9'0" <br />UNAUTHERIZED CHANGES. USES AND TIME EFFECTS: EMCON WILL NOT BE RESPONSIBLE OR LIABLE FOR UNAUTHORIZED CHANGES TO OR USES OF THIS PLAN/DRAWING. ANY CHANGE TO THIS PLAN/DRAWING <br />MUST BE DOCUMENTED IN WRITING AND REQUIRES APPROVAL BY EMCON. THIS PLAN/DRAWING REFLECTS THE REGULATORY REQUIREMENTS OR CONCURRENCE IN EFFECT AT THE TIME OF ITS ISSUANCE. <br />Gr c • <br />Pl� 1s. --7 <br />44 <br />0 <br />WASH PAD <br />RECESSED FLUORESCENT <br />LIGHT FIXTURES <br />(TYPICAL) <br />30. <br />IG <br />. BD. <br />LING <br />3'0" <br />'ENDED ACOUSTICAL <br />CEILING - SEE <br />IL1 <br />A6 <br />FOR LOCATION OF i <br />SUMP & SUMP PIT <br />SEE DETAIL 1 I W <br />� JO <br />0 <br />1 wU <br />j Z o <br />TYp Z f- <br />I � I w pO <br />• z W 0 <br />Q = U <br />Ix Ix <br />N L) w <br />v 0 0 <br />N • 3 w <br />I w 0 0 <br />/ Of ZZ <br />/•I > :3 LAJ <br />$" • C LLL FUEL j v � w <br />DIA <br />prlC. FILLED <br />6U^RD R� ST• 51=E <br />ISLAND o Z w <br />DETAIL I "ryp . I w Z <br />c:5 zo U � <br />�._ A N U <br />- 4'-8" HIGH <br />8" X 8" X 16" ' <br />CONC. MASONRY <br />BLOCK WALL <br />- ELECTRIC/OIL <br />PUMPING UNIT <br />D ' • D -METAL THRESHOLD _'-'� 2'-6" X 3I' 6" OPERABLE <br />TYP 1Q <br />® EXT DOORS LOUVER (4 PLACES) <br />_ 1 4 3/26/92 RECORD DRAWING -PER CONTRACTOR <br />14'- 0" <br />PROVIDE STEEL ANGLE <br />NOSING AT ENTRANCE <br />DOOR - SEE DWG #S8 <br />3 <br />6/10/91 <br />PLAN CHECK 4116/ql <br />A. INTERIOR MATERIAL AND FINISH SCHEDULE <br />B. DOOR AND WINDOW SCHEDULE AND DETAILS <br />2 <br />4/03/91 <br />PLAN CHECK 3/28/91 <br />FOR INTERIOR ELEVATIONS OF MAINTAINANCE BAY <br />AREA, INDICATED AS <br />.2 <br />1 <br />3/18/91 <br />PLAN CHECK 3/12/91 <br />WHS <br />A D <br />AFD <br />P.R. <br />0 <br />2/2/91 <br />ISSUED FOR CONSTRUCTION <br />WHS <br />AFD <br />AFD <br />P.R. <br />REV <br />DATE <br />DESCRIPTION <br />JDWN 8 <br />DES BY <br />CHK BY <br />APP 13 <br />DATE OF ISSUE DWN BY N.SOMA CHK BYA.F.DIMALANTA <br />_E_U 19 1 DES BY A.F.DIMALANTA APP BYPHIL R08Y woo <br />3/4"0 E.M.T. FASTEN TO 1-0 12 GA HANGER WIRE <br />E.M.T. W/ 1/2" TEK SCREW ® 4'-0" O.C. EA WAY <br />AT EACH SIDE. LOCATE AT <br />2'-0" O.C. EA WAY. 1" EXTEND TO <br />E.M.T. W/ NOTCHED END STRUCTURE ABOVE <br />0 <br />45° 6" 45 <br />45° 45° <br />MAX <br />MAIN RUNNER LCROSSRUNNER <br />NOTE: <br />WIRES SHALL BE ATTACHED TO SUSPENDED MEMBERS W/ <br />MIN. OF 3 TURNS. <br />SPLAYED WIRE BRACING POINTS SHALL BE PLACED ® 12�-0" <br />O.C. IN BOTH DIRECTIONS W/ THE FIRST POINT WITHIN <br />4' OF WALL. <br />LIGHTING FIXTURES UP TO 56 LBS. SHALL HAVE 2 ADD- <br />ITIONAL #12 HANGERS CONNECTING THE FIXTURES <br />HOUSING TO THE STRUCTURE ABOVE; THE WIRES MAY <br />BE SLACK <br />T—BAR CEILING <br />DETAIL <br />N.T.S. A6 <br />ANOR r�y��F <br />0 <br />0t No. C 13255 <br />`nkl, tom. <br />F CN <br />Z WALL LEGEND: <br />METAL FRAME BUILDING WALL WITH ZEE GIRTS <br />BY PASS INSTALLATION <br />WOOD FRAME WALL WITH 2x4 STUDS AT 16" O.C. <br />UNLESS NOTED OTHERWISE <br />8" x8" x 1 6" CONCRETE MASONRY BLOCK WALL <br />UNLESS NOTED OTHERWISE <br />NOTES: <br />1. <br />SEE DRAWING NO. A11 FOR THE FOLLOWING INFORMATION: <br />A. INTERIOR MATERIAL AND FINISH SCHEDULE <br />B. DOOR AND WINDOW SCHEDULE AND DETAILS <br />C. WASHROOM ACCESSORIES SCHEDULE <br />2. <br />FOR INTERIOR ELEVATIONS OF MAINTAINANCE BAY <br />AREA, INDICATED AS <br />E1 > SEE DRAWING NO. A8. <br />3. <br />PROVIDE INSULATION AS FOLLOWS: <br />A. EXTERIOR WALLS - R13 BLANKET TYPE FIBERGLASS <br />B. ROOF - R19 BLANKET TYPE FIBERGLASS <br />C. VAPOR BARRIER FACING ON INSULATION SHALL <br />BE PROVIDED AS PER METAL BUILDING MANUFACTURERS <br />SPECIFICATIONS. <br />D. INSULATION MATERIALS AND WIDTH OF FIBERGLASS <br />BLANKET SHALL BE IN ACCORDANCE WITH THE <br />SPECIFICATION OF METAL BUILDING MANUFACTURER. <br />4. <br />ALL DIMENSIONING IN OFFICE AREA IS TO FACE OF STUD <br />U.N.O. <br />D1 5. <br />CONTRACTOR TO PROVIDE AND COORDINATE WITH OWNER <br />DESIGN, ARRANGEMENT, AND REQUIREMENTS OF THE WORK <br />TABLES AND SHELVINGS AND OTHER STORAGE REQUIREMENTS <br />IN THE PARTS STORAGE ROOM. <br />2Q 6. <br />OFFICE/MAINTENANCE BUILDING SHALL BE PROVIDED WITH A <br />COMPLETE FIRE PROTECTION AUTOMATIC SPRINKLER SYSTEM <br />IN ACCORDANCE WITH SECTION 15330 OF THE SPECIFICATIONS. <br />SAN JOAQUIN COUNTY <br />NORTH COUNTY SANITARY LANDFILL <br />SAN JOAQUIN COUNTY, CALIFORNIA <br />OFFICE/MAINTENANCE BUILDING—FLOOR PLANS <br />DRAWING NO. <br />A 6 <br />PROJECT NO. <br />939-02.43 <br />RECORD DRAWING <br />