Laserfiche WebLink
Z <br />N <br />N <br />d <br />(D <br />O <br />co <br />O <br />N <br />0 <br />rn <br />rn <br />i <br />N <br />O <br />IT <br />O1 <br />0 <br />U <br />V) <br />U <br />o' <br />a - <br />IM <br />A A2 <br />2'- 10" <br />- N 4" X2 1/2"X2 1/2" FIRE <br />DEPT. INLET CONN. � h_ <br />91-10" <br />TANK FILL CAP ® 8' <br />ABOVE TOP OF GRADE <br />to <br />�\ --- <br />N 6" X4 F7 DUCER <br />2'-0" I <br />n <br />200 GAL. DIESEL <br />\ FUEL TANK <br />6"X6"X4" TEE \ <br />FLOW METER FM -1 \ ,� <br />�--2"O VENT PIPE RISER \� <br />UP THRU ROOF WITH <br />Ali <br />FLASH ARRESTOR <br />Crw <br />o a <br />- JOCKEY PUMP m <br />;0 8" FL FROM FIRE CONTROL PANEL <br />WATER STORAGE <br />TANK - SEE DWG. <br />NO. M9 (2) FUEL LINES PLACED IN - <br />4"0 PVC SCH. 40 SECONDARY <br />-- CONTAIMENT PIPE BELOW CONCRETE <br />SLAB <br />0 <br />o <br />�i6" FL 8" X 6" ECC. REDUCER <br />N N 10" Al <br />8" SOV -1 g" FL <br />INION <br />I " <br />V-2 <br />6" FL TO FIRE L2,_6" <br />WATER STORAGE - <br />TANK -SEE DWG. N0. M9-� OW METER REDUCER <br />M-2 <br />2" SOV -3 JOCKEY PUMP P-2� <br />_ �LIt1 P <br />4" W FROM <br />WATER WELL I 1 1/4"x2 1 /2" <br />SEE DWG. NO. M9 REDUCER -- <br />NI 2 1/2" CV -1 <br />`t I 2 1/2" SOV 2 <br />f <br />I <br />P 7-2 - <br />411 <br />i <br />f 3" <br />3 <br />N <br />2'- 7" 49-8" <br />6" FL <br />28'-0" <br />FLOW METER <br />FM -2 <br />PRESSURE TANK <br />PT -2 <br />(V <br />0 <br />I <br />1/2" CV -2 <br />2 1/2" F L <br />PON - <br />I <br />N <br />i <br />PI AN <br />UP THRU ROOF EXHAUST PIPE <br />WITH MUFFLER AND SILENCER <br />3' -8"x3' -8"x2'-0" DEEP SUMP <br />(SEE ARCH. DWG. NO. Al2 <br />FOR DETAILS) <br />FIRE PUMP <br />P-1 <br />— PRESSURE RELIEF VALVE <br />PRV-1 <br />4" F L <br />6" CV -1 8" SOV -2 <br />',ER REDUCER <br />R� �LA1% <br />Z IL <br />slp)wO <br />SEE NOTE 5 - - <br />8" F L <br />8'x4' SPACE FOR c.1 <br />CHLORINATION SYSTEM <br />(SEE DWG. NO. M6 <br />FOR P & ID) <br />TO BOOSTER PUMP IN <br />CHLORINATION SYSTEM <br />1 BY ELECTRICAL CONTRACTOR <br />_ 3" SOV -6 1 3" CV -3 - - -- -- --- - <br />OCA <br />FS -1 Al <br />4" x3" REDUCER <br />A3 NOTES: <br />1. FOR FIRE PUMP HOUSE LOCATION <br />SEE DWG. NO. C4 <br />2. FOR FIRE PUMP HOUSE STRUCTURAL <br />DETAILS SEE DWG. NO. Al2 <br />3. FOR P&ID AND EQUIPMENT SCHEDULE <br />SEE DWG. NO. M1 <br />4. FOR FIRE PUMP HOUSE ELECTRICAL <br />LAYOUT SEE DWG. NO. E12 <br />5. CONTRACTOR TO PROVIDE 4 1/2"X12' LONG <br />FLEXIBLE HARD SUCTION HOSE W/4 1/2" N.S.F.T. <br />CONNECTIONS FOR USE BY FIRE DEPT. <br />HOSE SHALL BE HUNG ON WALL IN PUMP HOUSE. <br />1 ' - 9 A/ 2" <br />f �Q 12'-5" 1'-6" <br />8" FL TO FIRE WATER SYSTEM - -- ---- -I <br />SEE DWG. NO. C4 <br />3" W TO WATER SYSTEM <br />SEE DWG. NO. C4 <br />8" EC -1 <br />2'-9" <br />Lim <br />- PIS <br />(FOR PT -1) <br />-1/4" <br />STAINLESS <br />STEEL <br />TUBING <br />Al <br />O <br />I <br />N <br />2 <br />0 <br />P-2 <br />6" F L <br />J <br />UNAUTHORIZED CHANGES, USES AND TIME EFFECTS: EMCON will not be responsible or liable for unauthorized changes to or uses of this plan/drawing. Any change to this <br />plan/drawing must be documented in writing and requires approval by EMCON. This plan/drawing reflects the regulatory requirements or concurrence in effect at the time of its issuance. <br />5 <br />3" W <br />CI <br />EL. 118'-3 3/4" U <br />TOP OF GRADE <br />1 1 /4" CV -2 <br />�4"x3" <br />REDUCER <br />v30' <br />PIS — — — TO WELL PUMP P-3 <br />BY ELECTRICAL CONTRACTOR <br />1/4" SOV -5 <br />(AT THE FACE OF THE <br />I <br />i <br />0 i <br />3" SOV -6 <br />PRESSURE TANK PT -1 <br />EL. 121'-4 3/4" <br />-— PT -2 <br />3 <br />3/26/92 <br />RECORD DRAWING -PER CONTRACTOR <br />2 <br />5/10/91 <br />PLAN CHECK 4/16/91'y <br />1 <br />3/18/91 <br />PLAN CHECK 3/12/91 <br />KMN <br />wsOWU <br />SFS <br />P.ROBY <br />0 <br />2/2/91 <br />ISSUED FOR CONSTRUCTION <br />J.P.S. <br />J.P.S. <br />SFS <br />SFS <br />REV <br />DATE <br />DESCRIPTION <br />DWN B <br />DES 8Y <br />CHK BY <br />APP B <br />DATE OF ISSUE DWN BY J. SLANK CHK BY S.F. STRONG._ <br />FEB_ 1991_. _ DES BY J. SLANK APP BY S.F. STRONG <br />6" FL <br />FLOW METER <br />PG -1 (PRESSURE GAUGE <br />LOCATION ROTATED <br />FOR CLARITY) —� <br />1/4" SOV -5 <br />PRESSURE TANK <br />PT -2 <br />i <br />EL. 119'-7 3/4" <br />EL. 118'-7 314" <br />T.O.C. EL. 117'-9 3/4" 1 <br />T.O.C. EL. 117'-9 3/4" <br />2 1 /2" FL <br />J <br />N <br />jTEE <br />W <br />EL. 125'-6 3/4" <br />2 1/2" FL <br />1'-10" <br />,-2 1/2"xl 1/2" <br />REDUCER <br />/-1 1/2"xt 1/2"x1/2" <br />REDUCING TEE <br />(2 PLCS.) <br />1/2" CV -2 <br />-1 1/2" CV -2 <br />SECTION 3 <br />1/2" =1 '-0" <br />EL 125-6 314" <br />1" PIPING TO CHLORINATION SYSTEM. <br />PIPING TO BE FIELD ROUTED PER <br />P&ID - SEE DWG. NO. M6 <br />2- 6 <br />- EL 119'-9 --- <br />' ' <br />3 CV -3 Al <br />6" SOV -2 FS -1 <br />1 J <br />t 3" SOV -6 3" CV -3 <br />SECTION 2 <br />1/2"=1'-0" <br />EMcon <br />l�Associotes <br />EL. 119'-0 3/4" <br />\L-3" X 3" X 1" RED. TEE <br />� F <br />h121772 �� 1 <br />r, EXP. <br />SAN JOAQUIN COUNTY <br />NORTH COUNTY SANITARY LANDFILL <br />SAN JOAQUIN COUNTY, CALIFORNIA <br />FIRE PUMP HOUSE -PIPING LAYOUT & DETAILS <br />DRAWING NO. <br />M8 <br />PROJECT NO. <br />939-02.43 <br />RECORD DRAWING <br />