J
<br />N
<br />n
<br />O
<br />C"
<br />IDN
<br />0
<br />0
<br />N
<br />O
<br />N
<br />0
<br />rn
<br />Ol
<br />O
<br />0
<br />U
<br />w
<br />a
<br />L41,
<br />IRRIGATION SHEET NOTES
<br />1. THE IRRIGATION SYSTEM DESIGN IS DIAGRAMMATIC. DUE TO THE
<br />SCALE OF THE DRAWING, ONLY THE MAINLINE PIPING IS SIZED. WHERE
<br />PIPING, VALVES, QUICK COUPLERS, ETC. ARE SHOWN OUTSIDE OF
<br />THE PLANTING AREAS, THE INTENT SHALL BE FOR THE PIPING,
<br />VALVES, ETC. TO BE INSTALLED WITHIN THE PLANTERS.
<br />2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL
<br />ACTUAL SITE CONDITIONS AND FOR MAKING PRESSURE AND GPM
<br />AVAILABLE CHECKS AT POINT OF CONNECTION. THE SYSTEM IS
<br />DESIGNED FOR 40 TO 48 GPM PER IRRIGATION VALVE. SHOULD
<br />THERE BE A DISCREPANCY, THE CONTRACTOR SHALL ADJUST THE
<br />PIPE SIZES TO RENDER THE PROPER PSI AT THE SPRINKLERS. IN NO
<br />CASE SHALL THE VELOCITY EXCEED 5.0 ON THE MAINLINE.
<br />3. LATERAL LINE (NON -PRESSURE) SIZING GUIDELINES SHALL BE AS
<br />FOLLOWS: 3/4" O.D. - 0 TO 10 GPM, 1" O.D. - 11 TO 15 GPM; 1-1/4"
<br />O.D. - 16 TO 25 GPM; 1-1/2" O.D. - 26 TO 40 GPM; 2" O.D. - 41 TO 65
<br />GPM. REFER TO THE IRRIGATION EQUIPMENT SCHEDULE, THIS SHEET,
<br />FOR SPRINKLER SPECIFICATION ON GPM.
<br />4. IRRIGATION PIPE DEPTHS: MAINLINE AND LATERAL LINES UNDER
<br />SERVICE DRIVES -30 INCHES OF COVER OVER PIPES; MAINLINE AND
<br />LATERAL LINES UNDER ALL OTHER PAVED AREAS - 24 INCHES OF
<br />COVER OVER PIPES. ALL PIPES UNDER PAVING SHALL BE BEDDED IN
<br />6 INCHES OF CLEAN SAND AROUND PIPES. IN PLANTING AREAS
<br />MAINLINES ARE TO HAVE 18 INCHES, AND LATERAL LINES 12 INCHES
<br />OF COVER OVER PIPES.
<br />5. STUB OUT CONNECTION POINTS ARE SHOWN AS 2". IMMEDIATELY
<br />INCREASE SIZE OF PIPE AND INSTALL A 2-1/2" GATE VALVE IN VALVE
<br />BOX.
<br />6. ALL LOW VOLTAGE CONTROL WIRE UNDER PAVED AREAS SHALL BE
<br />SLEEVED. CONTROL WIRES SHALL FOLLOW THE MAINLINE ROUTING
<br />TAPED AND BUNDLED EVERY 20 FEET.
<br />7. ALL WIRE CONNECTIONS SHALL BE MADE AT REMOTE CONTROL
<br />VALVES ONLY, WITH RAINBIRD #ST-03/PT-S5 SNAP-TITE
<br />CONNECTORS. PROVIDE A 2 FOOT COIL OF WIRE FOR EACH
<br />CONNECTION. TAPE WIRE BUNDLES EVERY 20 FEET.
<br />8. ALL GATE VALVES AND REMOTE CONTROL VALVES SHALL BE
<br />HOUSED IN VALVE BOXES AS SHOWN IN THE DETAILS.
<br />9. IRRIGATION CONTROLLERS SHALL BE WALL MOUNTED BACK TO BACK
<br />IN TWO (2) IRRIGATION ENCLOSURE HOUSINGS WITH SUB -ASSEMBLY
<br />PANELS. ELECTRICAL SUPPLY PROVIDED TO THE LOCATION BY
<br />ELECTRICAL CONTRACTOR.
<br />10. THE IRRIGATION SPRINKLER LOCATIONS SHALL BE COORDINATED
<br />WITH PLANT MATERIAL PLACEMENT.
<br />11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING HIS
<br />WORK WITH OTHER TRADES.
<br />12. REFER TO THE SPECIFICATIONS
<br />13. MAINTENANCE PERIOD 60 DAYS.
<br />BERM. SEE 'EMCON' PR
<br />1' = 50'-0"
<br />I I \
<br />I Z
<br />I
<br />I
<br />I 13
<br />F, ti
<br />Z 35 Fri
<br />1V +
<br />FUTURE PROCESSING AREA
<br />ACCESS RD., ALSO SEE 'EMCON' I X•
<br />PROJ. No. 939-02.25. SHT'S. 2 do 3
<br />Z
<br />060, 7-0 P P --I L_L_ ° I W I ( X • !�
<br />5 E FL/- 1 �NT�Y N L+j
<br />JW
<br />xMF•
<br />_ 15
<br />1 4
<br />FROM � + ACCESS ROAD
<br />HARNEY 21
<br />LANE -- --- ---: --
<br />W
<br />W
<br />I D
<br />0
<br />S
<br />V)
<br />id;
<br />- J DRAIN DITCH x Xxx x xxxxx Kxx x�-
<br />N \
<br />F-
<br />U
<br />> ���
<br />a p1
<br />33•l., G,I'h
<br />Z
<br />2
<br />2' LDSP. IRRIG.
<br />SERV., SEE DWG. No. C4
<br />-2%Z NAt-1H0NP 4A --r5 vP�Vr,
<br />- L, G, PH
<br />X•
<br />' -
<br />-6 y 3oi.2. G' F1
<br />z+
<br />RECYCLING CENTER
<br />49 -1 Ci
<br />41
<br />IRRIGATION EQUIPMENT SCHEDULE
<br />I�1
<br />HAW U -
<br />r-1 C>P F 1-- i -j c>-
<br />P I FT I D W
<br />O
<br />HUpf rf-
<br />L- 2-0
<br />`>!'ror of , l,J/,*-i �JoZZ1-�, 2.s �r1 D 35 f'•s.1, .
<br />v
<br />HUWlf_�R_
<br />I-20
<br />A" For-uP (J/_O4 U0z7_L5I
<br />17) OF
<br />FAJ UF -P
<br />17 SST
<br />-_�1r.WF cT-160L, roP-Wr L/slP5-STpF 1-IOZZL.Fj 1.21 :�f11 � 3o P'S.I•
<br />E)
<br />PAI NNPIP
<br />ZZ sip
<br />5Hr-d6 s-Tr_Eitf-r-1SrF_Af-r-Q 3.22IHQ 1. LA I Q & O$1 -3o P,4-. I.
<br />O
<br />F-Alu�,IP-2
<br />10 S IBS
<br />ISH PUt5 __> Fp.`(- FO 1.5-11H 9) 0.-1G,T® 0.5-L 000.39 -3v PSI.
<br />OP
<br />F-4iK E31 N9
<br />IO Sr-sr
<br />I61:>6 Pam Uf - F(91.5"11 HO o--191-T00.52.1a 0 o•39 - W M.I.
<br />REV
<br />F-AlW81F-P
<br />I4•'0Z
<br />r uP.,r, G0I 1FIW61 6U6V,L.F,Z-- 0-5lif'rl,F�Ul,LGIVL1,E�-
<br />®QG
<br />FA)"Nf2p
<br />APP 8
<br />IIQUIL0L4 VA, -VV, l,J/I.OGK•-IW61- PWf!58P 7--Gds/F,(_
<br />®
<br />TOi
<br />Go-' V✓-�-ol2s2-0rl-opo
<br />F�ho-r[5
<br />®
<br />HAAMHC)"
<br />'rb�Zv
<br />H300 6I,9IJ�5
<br />2 -ISS'(? . H`(�[z1P Lol-)'1•�LLE�S, Wa�� MvuUT 1W rU64_0FGWF_r_S
<br />s---�
<br />G•l�?►SS 2c:o (,YL I L�A'TrrFa,4r,
<br />f7V G (F rLr-_� U tZ1✓ w 1-I E�5, Qs r Arrr,-cv I%17
<br />s-
<br />4Ag-
<br />r� goy- V -F- vA,Lv
<br />s�/�-5-A
<br />_ a��1�1�."rlaN st,�t�/���I-F�Tp-�•� �LEEV�-N 4oPvL
<br />2 r -,A .. Lj/2 Gol�'1'(u'�1-�� Sug-/�5�►-161-ISS
<br />vA W o.
<br />VAS LV E�. 517-15-
<br />• I •x X• X. urxT To IAV- <-Y�rO�
<br />•X
<br />• I •X X• x•
<br />• X •X +- -x �- - - R- - - -� - - �-- - -�- -i ! x • 1 N C� 1 �.-f �'S � U 6 �1�1� 1 �� � � 1.
<br />!Fu.;�Fr_�
<br />•� - r �tcP� I
<br />•X P P P P �, �1 5•L► Pr1 I
<br />X•
<br />r . x
<br />9'
<br />2G
<br />----� e q 3°I.2 r i X I x
<br />G \
<br />2' e X RAMP OFFICE/MAINT. BUILD -G. \
<br />xe
<br />l-lo''T.S- I-1"G••S. I FUEL
<br />I �• • I I -3" E. ISLAND CRUSHED ROCK
<br />X• X �' SURFACE. SEE \ �
<br />l•'t L5.,1-1 �•S. .. �Z DWG. No. C4
<br />2�f yPf� I I X• I - - r . I z Zo r3 � Pi1 \
<br />020 Id
<br />1%, +M��+ `� ♦.• • +
<br />SERV., SEE DWwon I
<br />Id
<br />'R ma'
<br />.�►i ►,
<br />be Wool
<br />� C 7
<br />�, ® ��• , ` • • • •
<br />rr�,r, �rrr
<br />•
<br />► /
<br />Xr 15 •
<br />VALVE XONTROLLER STATION I-L-jCHEDULE
<br />rA
<br />���0000000a�m000000000000vv0000��m0
<br />1
<br />3/26/92
<br />RECORD DRAWING -PER CONTRACTOR
<br />0
<br />2/2/91
<br />ISSUED FOR CONSTRUCTION
<br />REV
<br />DATE
<br />DESCRIPTION
<br />JDWN B
<br />DES BY
<br />HK, Y
<br />APP 8
<br />DATE OF ISSUE DWN BY'r-GT I�To CHK BY f -
<br />FEB. 1991 DES BY APP BY '
<br />vooe�°0000v��e000�0000e�e
<br />e�oo�oe
<br />00000000000eo■�oo0oa��e0v�eeo�o�oo
<br />f
<br />z. poL .� p .. JZ5-4z P
<br />� � �' �:� �' `_`/PLV �--AIZ �--:A�t�S1aj1�1 X17__ �U_ �•I'j"N �(Z.
<br />No. 153
<br />LECHNER ASSOCIATES
<br />Landscape Architecture / Consulting
<br />1212 West Cliff Drive (408) 457-0484
<br />Santa Cruz, CA 95060 FAX (408) 457-0485
<br />�14 >, Zq 4Pr1
<br />�r. emcon-
<br />Associates
<br />--->
<br />4' �tkA
<br />..1,I r .
<br />SAN JOAQUIN COUNTY
<br />NORTH COUNTY SANITARY LANDFILL
<br />SAN JOAQUIN COUNTY, CALIFORNIA
<br />IRRIGATION PLAN
<br />4PH
<br />33.8
<br />el-rh
<br />32. ZGtPI-1 �
<br />DRAWING NO.
<br />L 1
<br />PROJECT NO.
<br />939-02.43
<br />16.
<br />UNAUTHORIZED CHANGES, USES AND Ttl41E EFFECTS: EMCON will not be responsible or liable for unauthorized changes to or uses of this plan/drawing. Any change to this
<br />RECORD DRAWING
<br />plan/drawing must be documented in writing and requires approval by EMCON. This plan/drawing reflects the regulatory requirements or concurrence in effect at the time of its issuance.
<br />- r3l 5 lS-
<br />1
<br />3/26/92
<br />RECORD DRAWING -PER CONTRACTOR
<br />0
<br />2/2/91
<br />ISSUED FOR CONSTRUCTION
<br />REV
<br />DATE
<br />DESCRIPTION
<br />JDWN B
<br />DES BY
<br />HK, Y
<br />APP 8
<br />DATE OF ISSUE DWN BY'r-GT I�To CHK BY f -
<br />FEB. 1991 DES BY APP BY '
<br />�14 >, Zq 4Pr1
<br />�r. emcon-
<br />Associates
<br />--->
<br />4' �tkA
<br />..1,I r .
<br />SAN JOAQUIN COUNTY
<br />NORTH COUNTY SANITARY LANDFILL
<br />SAN JOAQUIN COUNTY, CALIFORNIA
<br />IRRIGATION PLAN
<br />4PH
<br />33.8
<br />el-rh
<br />32. ZGtPI-1 �
<br />DRAWING NO.
<br />L 1
<br />PROJECT NO.
<br />939-02.43
<br />16.
<br />UNAUTHORIZED CHANGES, USES AND Ttl41E EFFECTS: EMCON will not be responsible or liable for unauthorized changes to or uses of this plan/drawing. Any change to this
<br />RECORD DRAWING
<br />plan/drawing must be documented in writing and requires approval by EMCON. This plan/drawing reflects the regulatory requirements or concurrence in effect at the time of its issuance.
<br />- r3l 5 lS-
<br />
|