Laserfiche WebLink
4 <br />fl <br />N4N <br />Q <br />v <br />OWNERS WL=Z Z <br />Ye BF e15FD FOR <br />CONSJ'RUCY/ON <br />W10 -;q <br />® Denotes location of °R" Value Tests by Anderson 4 Associates <br />R=35 <br />s <br />�c <br />W. D.S. <br />30 59 <br />`RI VER N <br />rt <br />75�I <br />76 <br />58 57 <br />DOD elvF <br />v ` 0C,4 b <br />2EAbENl"B <br />I Q 73�\ 6 <br />I <br />J <br />7 <br />2 <br />� 52 <br />2 <br />0 <br />ti <br />L:U MNE <br />i <br />4 al <br />c + o <br />m � + <br />W//D BRIDGf <br />ROAD , <br />0 <br />YLIRNER ROAD <br />YICINOY MAP <br />NO SCR LE <br />9 <br />I� 0 I J <br />72, 65 <br />0 0 5 <br />78 <br />I;L I 71 66 <br />79d I w 14/50 <br />70 67 7 <br />�I a9 <br />Removeex, tI VXL2� �2� 1 Removeexn;t. <br />68 <br />TempTurri 69 •� I Temp.Turnarou d <br />\ JJ I I I I -'f% <br />17 <br />3-8 <br />/1-3 <br />rc rll <br />I \ \\ \\J\I 1 ,J \�8l -3 Z) ) <br />3 I I I� _41' _.r <br />���D RY�II� <br />L \ \ J=r <br />id <br />\ R I <br />WELL 517E - 1 t 19 <br />SEE SHEET <br />30 31 <br />W 0 1I o is <br />- F <br />$H EET <br />INDEX od - <br />Bk/DGE <br />REVISIONS <br />BY <br />DESIGN DRAWN BY ' <br />� -� � !��{ � � �� � - r <br />COUNTY OF SAN JOAQUIN <br />APPROVED:DEPARTMENT OF PUBLIC WORKS <br />DATE: 3dl) <br />s,jRCE NO.: 125 <br />� Zh/ /7 MWIRATION DATE: <br />D CTO O PUBLIC WORKS <br />IA <br />11/12/93 <br />aE/vclr MnRx <br />4, 1 ) <br />��../ <br />® <br />KEY SHEET QUANTITIES 4 <br />R <br />. 19-6 <br />PER u5.6$. B.M. I9 -B /907-45. <br />Storm Drain Line Indicating direction of flow <br />property line data. <br />18, <br />All off-site water lines shall be pressure tested, disinfected, <br />LOCATION NORTNWIOT CORNER OX <br />The street light system shall be installed by Pacific Gas 1 Electric <br />Fire Hydrant <br />NOTErj <br />Street Light High PressureSodiUmVapor(15OW(CXCept IoOW on <br />M490NIC BUILDING IN 7_114 TOWN <br />of W0011bRlDGE. EIfYATION 49.8; <br />D <br />-0 <br />PLAN 97_ PROFILE <br />A`4S L <br />IS M057 CURRENT AER /72 <br />line. <br />-07 <br />WELL SITE DETAIL <br />19, <br />All off-site storm drains shall be cleaned prior to final acceptance. <br />5. <br />Baumbacb 1 Pia::a (Engineer) shall set all survey controls and <br />20. <br />Contractor shall visit site prior to bidding, Specifications are a <br />construction stakes necessary for completion of work. The Contractor <br />Woodbridge Lighting District <br />GRADING PLAN <br />Woodbridge Sanitary District <br />97 rrt <br />/9 <br />- in <br />GONSTRUCTIOf�I DETAILS <br />construction stakes. Survey and construction stakes that are lost or <br />- F <br />NO. <br />DATE <br />REVISIONS <br />BY <br />DESIGN DRAWN BY ' <br />� -� � !��{ � � �� � - r <br />COUNTY OF SAN JOAQUIN <br />APPROVED:DEPARTMENT OF PUBLIC WORKS <br />DATE: 3dl) <br />s,jRCE NO.: 125 <br />� Zh/ /7 MWIRATION DATE: <br />D CTO O PUBLIC WORKS <br />IA <br />11/12/93 <br />REVISE SS GRADE-ROSEWOODWY <br />ES <br />® <br />510 94 <br />REV 15E fp. 4 UTILITY LOCATIONS <br />E5 <br />Storm Drain Line Indicating direction of flow <br />property line data. <br />18, <br />All off-site water lines shall be pressure tested, disinfected, <br />APP ED eY ' <br />20 -7 <br />R.C.E. �3 y DATE y <br />The street light system shall be installed by Pacific Gas 1 Electric <br />Fire Hydrant <br />flushed and tested for bacteria in conformance with the San Joaquin <br />Street Light High PressureSodiUmVapor(15OW(CXCept IoOW on <br />INDEMNITY CLAUSE <br />Contractor agrees eae that he shall assume sole and <br />complete responsibility for job site conditions during <br />the course of construction of this project, including <br />safety of all persons and property; that this <br />requirement shall apply continuously and not be limited <br />to normal working hours; and that the Contractor shall <br />defend, indemnify and hold harmless, the County of San <br />Joaquin, its elected officials, officers, employees, <br />agents, also the owner and project engineer from any <br />and all claims, costs of litigation, damages, and <br />attorney's fees, for personal injury or property damage <br />of whatever nature which are claimed to have occurred <br />during the term of this project. <br />CONSTRUCTION STAKING LIABILITY WAIVER <br />These improvement plans have been prepared with the <br />intent that the firm of Baumbach & Piazza, Inc. will be <br />performing the construction staking for the complete <br />project. If, however, another engineering and/or <br />surveying firm should be employed to use these plans for <br />the purpose of construction staking, notice is hereby <br />given that the firm of Baumbach & Piazza, Inc. will not <br />assume any responsibility for errors or omissions, if <br />any, which might occur and which could have been avoided, <br />corrected or mitigated if Haumbach & Piazza, Inc. had <br />performed the staking work. <br />STRUCTURAL SECTIONS <br />R/W go ' <br />/ Z 2 / <br />9BYG/G4 GG if 5 -� \ \ \ 0.20'A-C: <br />.20'A.G. Ty G 0,00 DYER PRIME C09% <br />0.8 =.92 % /e O. 80' 95 0/0 R. C. <br />Co/7G..Sab r4dG <br />Comp, <br />ROSFW00D WAY zz.=40 R-rraL11Ev35 <br />G. f. RFQU/RPD = 0.83 <br />(, c� PROV/DFD = 0.8.8 <br />22' <br />1 <br />LF -GI <br />EXISTING <br />PROPOSM <br />G FNFRRL <br />N 0 1'E S <br />1. <br />All work shall conform to these plans and any special orovisions for <br />17. <br />Contractor shall be responsible for notifying and co -coordinate all <br />LOW Pbint <br />this project, <br />High Point <br />work with any agency requiring removal or relocation of utilities, <br />2. <br />Refer to the final map of this subdivision for all center line and <br />Clean Out to Grade <br />such as Pacific Bell, P. G. 1 E., etc. <br />Storm Drain Line Indicating direction of flow <br />property line data. <br />18, <br />All off-site water lines shall be pressure tested, disinfected, <br />3. <br />The street light system shall be installed by Pacific Gas 1 Electric <br />Fire Hydrant <br />flushed and tested for bacteria in conformance with the San Joaquin <br />Street Light High PressureSodiUmVapor(15OW(CXCept IoOW on <br />Company. <br />Agin CArre <br />County Health Code Requirements prior to connecting to existing water <br />4. <br />Contractor shall receive an approved set of plans and specifications <br />/yin COid Rbrzn <br />line. <br />fF4 C.'arA A Ar.7 <br />prior to beginning construction. <br />19, <br />All off-site storm drains shall be cleaned prior to final acceptance. <br />5. <br />Baumbacb 1 Pia::a (Engineer) shall set all survey controls and <br />20. <br />Contractor shall visit site prior to bidding, Specifications are a <br />construction stakes necessary for completion of work. The Contractor <br />Woodbridge Lighting District <br />separate document. <br />Woodbridge Sanitary District <br />shall be responsible for the preservation of all survey and <br />21. <br />New traffic striping and the restoration of any damaged existing <br />Pacific Bell <br />construction stakes. Survey and construction stakes that are lost or <br />Lodi Cable T,V. <br />painted legends or signs is the responsibility of the Contractor and <br />destroyed due to Contractor's negligence will be set by the Engineer <br />hbkelujnne Acres Maintenance District <br />shall be included in his bid price. <br />at the Contractor's expense. <br />27. <br />Where water crosses SD or SS use an 18-20 ft. length of C1. 200 pipe, <br />6. <br />The existing underground utilities were plotted from available <br />centered over the SS or SD if: a) The water is under the SS or SD. <br />records. The Contractor shall be responsible for contacting all <br />b) The vertical clearance is less than 1 foot. <br />utility agencies to mark their facilities in the field before any <br />23. <br />No materials resulting from tapping procedures may enter District <br />excavation, The Contractor shall notify and coordinate all work <br />sewer. <br />with any agency requiring removal or relocation of their utilities. <br />24. <br />All work will be required to be inspected by the Department of Public <br />Pacific Bell, P. 6. 1 E., Lodi Cable T. V., Woodbridge Sanitary <br />Works. They shall be notified not less than 24 hours in advance of <br />District and Mokeluene Acres Maintenance District, U.S.A. (800) 642- <br />commencement of work. <br />2444• <br />25. <br />Eash SS service to have C.D. at property. <br />7. <br />House services, fire hydrant laterals, and street light conduit shall <br />26. <br />It is agreed that field conditions may require changes to these <br />be installed prior to curb and gutter construction. All underground <br />plans. It is further agreed that the Director of Public Works may <br />utilities within the street area, including gas and telephone lines, <br />require changes, alterations or additions to these plans, when the <br />shall be installed prior to paving. <br />Director deems them to be necessary or desirable for the proper <br />B. <br />All manholes to be set flush with the finish grade unless otherwise <br />completion of the work, provided that such changes, alterations or <br />indicated. <br />additions shall not exceed 101 of the original estimate of the cost <br />9. <br />All water lines shall have a minimum cover of 30'. <br />for the improvements without prior approval of the surety. <br />10, <br />Nater used in any phase of construction, such as backfill compaction, <br />27, <br />Fire hydrant bid shall include the following: Tee, 6' Lateral, 6' <br />dust control, testing or other work herein required, shall be <br />Valve and complete fire hydrant assembly. <br />included in the unit price or lump sum bid for the respective item of <br />construction. <br />11. <br />Contractor agrees that he shall assume sole and complete <br />responsibility for job site conditions during the course of <br />28, <br />Contractor shay; notify Nokeluene Acres Maintenance District for <br />construction of this project, including safety for all persons and <br />approval prior to connecting water line to existing water main. <br />property; that this requirement shall apply continuously and not be <br />29, <br />Installation of all sanitary sewer improvements shall conform to the <br />limited to normal working hours and that Contractor shall defend, <br />standards of the Woodbridge Sanitary District. All such work is <br />indemnify, and hold the Owner, County and the Engineer harmless from <br />subject to inspection by the District Engineer. The Contractor shall <br />any and all liability, real or alledged, in connection with the <br />notify District Engineer 48 hours prior to the commencement of any <br />performance of work on this project, excepting for liability arising <br />work on the sanitary system. <br />from the sole negligence of the Owner or the Engineer. <br />11. <br />Contractor shall give Engineer a minimum of 48 hours notification <br />prior to staking any utilities. <br />30, <br />Pipe type ano'strengths allowed for underground utilities, unless <br />13. <br />Sanitary sewer services shall be marked by the curb 6 gutter <br />otherwise specified on plans, are as follows: Storm Drain (SD) - RCP 0111 <br />contractor with an 'S' stamped on the top of curb. <br />or PVC (SDR35) I Sanitary Sewer (SS) - PVC, per ASTM D3034, SDR35; <br />14. <br />Water services shall be marked by the curb and gutter Contractor with <br />Water (W) - PVC, Cl. 150 or greater per ANNA Std, C-900 <br />a 'N' stamped on the top of curb. Location of water markings shall <br />be verified in the field by the Engineer. <br />31. <br />Ali Ara311c signs and'marnhgs !Mali conform to San Joaquin County <br />15. <br />Lot grading shall be completed before starting any underground <br />Standards and to the 'Manual of Uniform Traffic Control Devices'. <br />construction. Refer to attached grading plan. <br />32. <br />Any changes to the approved Improvement Plans and Specifications must <br />16. <br />Separation of water and sewer mains (including crossings) and sewer <br />be prepared and certified by the 'Civil Engineer' and shall be <br />laterals crossing over water mains shall meet or exceed the latest <br />approved by the 'Director' prior to implementation. <br />standards of the State of California Department of Health Services. <br />33. <br />All materials used as sanitary sewer system must have written approval <br />from District Engineer prior installation. <br />STRUCTURAL SECTIONS <br />R/W go ' <br />/ Z 2 / <br />9BYG/G4 GG if 5 -� \ \ \ 0.20'A-C: <br />.20'A.G. Ty G 0,00 DYER PRIME C09% <br />0.8 =.92 % /e O. 80' 95 0/0 R. C. <br />Co/7G..Sab r4dG <br />Comp, <br />ROSFW00D WAY zz.=40 R-rraL11Ev35 <br />G. f. RFQU/RPD = 0.83 <br />(, c� PROV/DFD = 0.8.8 <br />22' <br />1 <br />LF -GI <br />EXISTING <br />PROPOSM <br />DVVF - <br />X <br />veeft fi/rx <br />N <br />Water Valve <br />e/ <br />LOW Pbint <br />RP <br />High Point <br />rc <br />Top of Curb <br />COPS <br />Clean Out to Grade <br />Storm Drain Line Indicating direction of flow <br />-_ <br />Sanitary Sewer Line Indicating direction of flow <br />Water Line <br />Fire Hydrant <br />yT(C,� 3o"b'I!- Born <br />Street Light High PressureSodiUmVapor(15OW(CXCept IoOW on <br />BC <br />Agin CArre <br />EC <br />find Cure <br />BCR <br />/yin COid Rbrzn <br />ECA' <br />fF4 C.'arA A Ar.7 <br />BG. <br />orwab lrealt <br />4 <br />$VP 5/GN <br />C/CB <br />Curb Inlet Catch Basin <br />SERVICES'- <br />Street Lights <br />Woodbridge Lighting District <br />Sewage <br />Woodbridge Sanitary District <br />Natural Gas & Electric <br />- P. G. & E. <br />Telephone <br />Pacific Bell <br />Television Cable <br />Lodi Cable T,V. <br />Water <br />Storm Drainage <br />hbkelujnne Acres Maintenance District <br />APPROVED BY <br />5 AN <br />r� BEYf1ED CG jS /. c. A.L. irPE 'E" OYER PRIME CDAr <br />0.8 YIx RC R70 f. S., (Liss d-1..C.e 96x <br />R.C. ORIC. 6R01W <br />(OHC. iUBGRADf COMDACI <br />/ CAIfF <br />DENEDICt <br />DVVF - <br />RIVER:WOOD <br />DRIVE <br />G f <br />RFQU/RFD / 25 <br />G P. PROV/DPD /. 26 <br />R-VqL UE= 35 <br />BAUMBACH & PIAZZA <br />CIVIL ENGINEERS KEY SHEET <br />SURVEYORS <br />323 W. ELM ST. LOD1, CALIF. <br />95240 PH: 209-388-6618 <br />BRI <br />INFER, WOOD <br />E <br />s <br />rTIRL D15rRICT <br />D6E SANIPSRY D/47,?M <br />" WINDWOOD11 SUBDIVISION <br />UNIT N0. 2 <br />SUBDIVISION IMPROVEMENTS <br />r ,`2, <br />ATE <br />Q/v /9, /99 <br />APE <br />SHEET O OF 9 <br />JOB NO. SSSS -L <br />FILE <br />NO. <br />G-/047 <br />I Wy,) <br />