Laserfiche WebLink
2x6 Rafter <br />0 <br />s <br />ELEVATION A <br />SCALE: 3/8" =1 ' 9 <br />Composition Shingles <br />on 1/2" CDX Plywood <br />Simpson LU24 <br />Hanger <br />2x4 studs <br />® 16" O.C. <br />DETAIL 2 <br />SCALE: 1"=1' 9 <br />1/2" CCX Plywood <br />at all exposures <br />2X6 Barge Rafter <br />`f 2x6 Outrigger <br />® 24" O.C. <br />Solid 2x6 <br />Blocking <br />2x6 F <br />24" C <br />(DF#2 <br />b <br />M <br />To P.G.&E. <br />service <br />DETAIL 1 <br />SCALE: 1"=1' 9 <br />12'-0" <br />5'-3" 1 1 3'-0" 1 3'-9" <br />FLOOR PLAN <br />SCALE: 3/8"=l' <br />d Blocking <br />/2" CCX Plywood <br />it all exposures (Typ.) <br />2x6 Fascia board <br />'8" T1-11 Siding <br />5'0" <br />9 <br />I <br />'b <br />;0 <br />I <br />5'x8' Area <br />reserved for <br />250 Gallon <br />Deisel Tank <br />SOUTH ELEVATION <br />SCALE: 3/8"=11' <br />EQUIPMENT SCHEDULE <br />1O Deisel—powered Generator Set, 125 KVA. <br />l2 J Air Duct to Radiator with Flexible coupler. <br />O Louver Vent, 36"x36" at Radiator, 30"x36" <br />at south wall. <br />OResidential Silencer with heat wrap. <br />ODiesel lines to Generator Day Tank. <br />O Electric Service Panel, 480/277V, 200A, 4W, 3 0. <br />OAutomatic Transfer Switch with 4" conduit to <br />riser located as per Generator requirements. <br />8O Subpanel, 120/240V, 100A, 3W, 1 0. <br />9O Booster Pump motor controller, NEMA Class 8502, <br />Size 00. <br />10 <br />Pump Control Panel, NEMA Class 8940, Size 4. <br />11 <br />Fire Extinguisher with AB & C rating. <br />Metal Door and Jamb, 3'-0" x 6'-8", 18 Gage <br />12 <br />Steel with fixed pin hinges and a heavy—duty <br />hasp bolted through the door. <br />13 <br />2" Sch. 80 PVC water line for chlorination system. <br />14 <br />Chlorine solution discharge line. <br />15 <br />3/4" Sch. 80 PVC pressure line from tank to pump <br />switch. <br />16 <br />3/4" Conduit from tank—mounted air compressor. <br />17 <br />Flexible exhaust connector. <br />108 <br />18 <br />Exhaust Thimble for roof penetration with rain cap. <br />19 <br />2x6 DF#2 Rafters 24" O.C. Double rafters at <br />exhaust supports.' <br />20 <br />Class A Roof: composition shingles on 1/2" CDX <br />plywood. <br />21 <br />Booster Pump Shelf, 18"x24" at 34" above floor. <br />22 <br />Foundation — see Sheet 10. <br />WEST ELEVATION <br />SCALE: 3/8" =1 ' <br />Nall—Mount <br />_fight Fixture <br />;Typical) <br />PROJECT ENGINEER DATE CHECKED DATE SUBMITTED DATE APPR VED DATE P U M P H 0 U S E SHEET TOTAL <br />COUNTY OF SAN J OAQ U I N SCALE AS NOTED ELEVATIONS & DETAILS VICTOR WATER SYSTEM IMPROVEMENTS INO. SHEETS <br />9 <br />C:\\ACTOR\ P LAN\ P U M P H O U S <br />