n
<br />PULL BOX P2
<br />PULL BOX 12
<br />RAW SEWAGE
<br />PUMP STATION
<br />SEE DWG E-6
<br />SEE NOTE Q2
<br />CONTROL PANEL "AM"
<br />POWER PANEL "PDP"
<br />PANEL "LPA"
<br />PULL BOX 11
<br />PULL BOX P1
<br />I,
<br />II
<br />II
<br />I�
<br />II
<br />I I
<br />II
<br />i
<br />L-
<br />N
<br />0
<br />!?
<br />/ SEE NOTE Q2---------- y ---------------------------------- -----------------
<br />CONTROL
<br />BUILDING
<br />SEE DWG E-5
<br />II
<br />II
<br />t�
<br />II
<br />I�
<br />t�
<br />I
<br />I
<br />I
<br />II
<br />MAIN SWITCHBOARD "MS" j
<br />I I I
<br />I
<br />1/0 BARE I I SEE
<br />COPPER WIRE I NOTE
<br />1001 I G j
<br />INSTALL PAD & i 1004
<br />BARRIER POSTS I
<br />PER PG&E STANDARDS I , j 1005
<br />I i 1011
<br />1 I I
<br />TO PG&E PULLBOX
<br />AT NEAR SIDE OF ------- °
<br />SADDLE CITY DRIVE i I 1010
<br />I
<br />I I
<br />I
<br />UTILITY TRANSFORMER 1 j
<br />,
<br />STANDBY GENERATOR
<br />I I
<br />I
<br />. I
<br />I
<br />FUEL STORAGE
<br />I
<br />i
<br />USS/pHgl
<br />TO TELCO
<br />PULLBOX AT
<br />NEAR SIDE OF
<br />r NO. 118 a DE BROGGI ROAD
<br />Exp -9-30-96
<br />* f F�£CTR� F��Q NOTES: A INSTALL ALL UNDERGROUND CONDUITS
<br />9lF0 ck1\F�� PER DWG E-3, DETAIL "B"
<br />FILE, 9404C-03 A INSTALL CONDUITS BETWEEN PULL BOXES
<br />PER DWG E-3, DETAIL -F-
<br />3123 BROADWAY
<br />SACRAMENTO, CA. 95817
<br />916-457-8144
<br />SCALE DATE
<br />AUGUST 1994 DESIGNED RLV SUBMITTED -
<br />1' 10' FILE DRAWN ZKV RECOMMENDED
<br />CHECKED RLV APPROVED -
<br />SURGE RETURN
<br />PUMP STATION
<br />SURGE TANK
<br />D A E A F
<br />EMERGENCY STORAGE
<br />RETURN PUMP
<br />53 SEE DWG E-10
<br />I � O
<br />CD
<br />.............................................................. ...................
<br />PULL BOX P3CK)SLUDGE POLYMER STORAGE SLUDGE DEWATERING
<br />i SEE DWG E-8 FACILITIES
<br />PULL BOX 13
<br />---------
<br />------------
<br />o`- --- -
<br />---
<br />AERATION TANK 44
<br />65
<br />SEE DWG E-7 63 6
<br />CLARIFIER FILTER PUMP STATION #25
<br />----------i----------
<br />43
<br />L- - -
<br />FUTURE EXPANSION
<br />FACILITIES
<br />I
<br />I
<br />I
<br />I
<br />SEE NOTE
<br />I
<br />I
<br />I
<br />t
<br />I
<br />PULL BOX P4
<br />PULL BOX 14 -�
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />---------------�
<br />I �
<br />I
<br />I I
<br />I ,
<br />I ,
<br />I ,
<br />I i
<br />I ,
<br />I ,
<br />I ,
<br />I ,
<br />I
<br />I
<br />I ,
<br />I ,
<br />I ,
<br />I ,
<br />I ,
<br />I,
<br />I
<br />1012
<br />pur
<br />- F--m�
<br />82
<br />I h
<br />L -----J
<br />63 200
<br />6" MAGNETIC
<br />FLOWMETER
<br />7�
<br />I I
<br />I I �
<br />LPA
<br />- J #27
<br />LPA
<br />93
<br />vWp
<br />I
<br />00
<br />WP t
<br />91
<br />I )
<br />----- O
<br />- CHEMICAL STORAGE
<br />EFFLUENT
<br />FLOW
<br />EFFLUENT POLYMER STORAGE
<br />SEE DWG E-9 (FILTER COMPRESSOR)
<br />FUTURE EXPANSION
<br />FACILITIES
<br />L-----------
<br />----------
<br />----------
<br />----------
<br />`-
<br />`-- SAMPLER RECEPTACLE
<br />CONTINUOUS FLOW FILTER
<br />CHLORINATION BUILDING
<br />SEE DWG E-8
<br />CHLORINE CONTACT BASIN
<br />G
<br />REVISION
<br />DESCRIPTION
<br />UTILITY CONTACTS:
<br />PG&E: FRANK SALADY
<br />(209) 942-1407
<br />PAC BELL: BILL CHELSETH
<br />(916) 811-4745
<br />H
<br />BY I APP I DATE
<br />COND.
<br />NO.
<br />FROM
<br />CONDUIT SCHEDULE
<br />TO
<br />COND.
<br />SIZE
<br />CONDUIT
<br />TYPE
<br />CONDUCTOR
<br />SIZE & QTY
<br />VIA
<br />PULL BOXES
<br />NOTES
<br />COND.
<br />NO.
<br />FROM
<br />CONDUIT SCHEDULE
<br />COND.
<br />TO SIZE
<br />CONDUIT
<br />TYPE
<br />CONDUCTOR
<br />SIZE & QTY
<br />VIA
<br />PULL BOXES
<br />NOTES
<br />1
<br />POWER PANEL "PDP"
<br />CONTROL PANEL "AB"
<br />3"
<br />GRS 3#3/0,
<br />1 4 GND
<br />72
<br />CONTROL PANEL "FC'
<br />FILTER COMPRESSOR #2
<br />-
<br />-
<br />-
<br />PACKAGE UNIT
<br />2
<br />POWER PANEL "PDP"
<br />F CONTROL PANEL BLOWER 3
<br />2"
<br />GRS
<br />-
<br />73
<br />PANEL "LPB"
<br />CONTROL PANEL "FC"
<br />1"
<br />GRS-PVC
<br />3#10,
<br />1#1 0 GND
<br />3
<br />POWER PANEL "PDP"
<br />CONTROL PANEL RS
<br />1"
<br />GRS-PVC 3
<br />10, 1 10 GND
<br />P1
<br />74
<br />PANEL " LPB"
<br />AIR DRYER
<br />3/4:'
<br />GRS-PVC
<br />2#12,
<br />13N GND
<br />_
<br />4
<br />POWER PANEL "PDPn
<br />TRANSFORMER A
<br />1 2
<br />GRS 243,
<br />1#6 GND
<br />75
<br />PANEL "LPB"
<br />SAND FILTER
<br />3/4:'
<br />GRS-PVC
<br />-
<br />STUB AND CAP
<br />5
<br />POWER PANEL "PDP"
<br />CONTROL PANEL "ESRP"
<br />1"
<br />GRS-PVC 3#12,
<br />1#12 GND
<br />P1,P2,P3
<br />76
<br />EFFLUENT POLYMER PUMP
<br />CONTROL PANEL "AM"
<br />3/4"
<br />GRS-PVC
<br />1#16
<br />T.S.PR.
<br />11, 12, 13
<br />CHEMICAL PACING
<br />6
<br />POWER PANEL "PDP"
<br />CONTROL PANEL FFP"
<br />1"
<br />GRS-PVC 3#12,
<br />1#12 GND
<br />P1,P2,P3
<br />80
<br />TRANSFORMER "C"
<br />PANEL "LPC"
<br />1"
<br />GRS
<br />3#6,
<br />1#8 GND
<br />7
<br />POWER PANEL "PDPh
<br />TRANSFORMER "B"
<br />1/4-
<br />GRS-PVC 3#8,
<br />1#10 GND
<br />P1,P2,P3
<br />81
<br />PANEL "LPC"
<br />CONTROL PANEL "PMU"
<br />1"
<br />GRS-PVC
<br />2
<br />8,
<br />1#12 GND
<br />6
<br />POWER PANEL PD
<br />TRANSFORMER "
<br />1 4
<br />GRS-PVC 3#8,
<br />1#10 GND
<br />P1,P2,P3
<br />82
<br />CONTROL PANEL PMU
<br />SLUDGE DEWATERING
<br />3/4:'
<br />GRS-PVC
<br />4#14,
<br />1#14 GND
<br />9
<br />POWER PANEL "PDP"
<br />TRANSFORMER "D"
<br />1 4
<br />GRS-PVC 3#8.
<br />1#10 GND
<br />P1,P2,P3, P4
<br />83
<br />CONTROL PANEL "PMU"
<br />CONTROL PANEL "AM"
<br />3/47
<br />GRS-PVC
<br />1#16
<br />T.S.PR.
<br />11, 12, 13
<br />CHEMICAL PACING
<br />10
<br />POWER PANEL "PDP"
<br />F SLUDGE POLYMER STRG
<br />1/4!
<br />GRS-PVC
<br />-
<br />P1,P2,P3
<br />STUB AND CAP
<br />84
<br />F SLUDGE POLYMER STORAGE
<br />CONTROL PANEL "AM"
<br />31e
<br />GRS-PVC
<br />-
<br />11, 12, 13
<br />F CHEMICAL PACING
<br />11
<br />CONTROL PANEL "AB"
<br />AERATION BLOWER #1
<br />1 1 4
<br />GRS 3#4,
<br />11.8 GND
<br />90
<br />TRANSFORMER "D"
<br />PANEL "LPD"
<br />1"
<br />GRS
<br />3
<br />6,
<br />1 #8 GND
<br />12
<br />CONTROL PANEL "Alir
<br />AERATION BLOWER #2
<br />1 1/4
<br />GRS 3#4,
<br />1#8 GND
<br />91
<br />CL2 BUILDING
<br />CONTROL PANEL "AM"
<br />1"
<br />GRS-PVC
<br />1
<br />16
<br />T.S.PR.
<br />11, 12, 13, 14
<br />CHEMICAL PACING
<br />21
<br />CONTROL PANELBLOWER 3
<br />F AERATION BLOWER 3
<br />1/47
<br />GRS
<br />-
<br />92
<br />PANEL "LPA"
<br />SAMPLER RECEPTACLE
<br />31e
<br />GRS-PVC
<br />2
<br />12,
<br />1 12 GND
<br />P1, P2, P3, P4
<br />31
<br />CONTROL PANEL "RSP"
<br />RAW SEWAGE PUMP #1
<br />31/4"
<br />PVC -80 SUBMERSIBLE PUMP CABLE
<br />93
<br />PANEL "LPA'
<br />CHEM STORAGE AREA RECPT
<br />314
<br />GRS-PVC
<br />2
<br />12,
<br />1#12 GND
<br />P1, P2, P3, P4
<br />32
<br />CONTROL PANEL "RSP"
<br />RAW SEWAGE PUMP 2
<br />3/4-
<br />PVC -60 SUBMERSIBLE PUMP CABLE
<br />200
<br />INFLUENT FLOW METER
<br />CONTROL PANEL "AM"
<br />3/4:'
<br />GRS-PVC
<br />1
<br />16
<br />T.S.PR., 2#14, 1#14 GND
<br />11, 12, 13, 14
<br />33
<br />CONTROL PANEL "RSP"
<br />RAW SEWAGE PUMP #3
<br />3 4
<br />PVC -60 SUBMERSIBLE PUMP CABLE
<br />201
<br />ICONTROL PANEL "AM"
<br />INSTRUMENT PULLBOX "11"
<br />2"
<br />GRS-PVC
<br />-
<br />FOR FUTURE EXPANSION
<br />34
<br />CONTROL PANEL nRSPO
<br />FLOAT SWITCHES
<br />1
<br />PVC -80 FLOAT SWITCH CABLE
<br />202
<br />CONTROL PANEL AM
<br />INSTRUMENT PULLBOX "11"
<br />2"
<br />GRS-PVC
<br />-
<br />FOR FUTURE EXPANSION
<br />35
<br />CONTROL PANEL "RSP'CONTROL
<br />PANEL AM"
<br />3/4
<br />GRS-PVC 2T1
<br />4
<br />11
<br />HIGH LOW LEVEL ALARM
<br />203
<br />INTRUSION DOOR SWITCHES
<br />CONTROL PANEL "AM"
<br />3/9
<br />EMT
<br />6#14
<br />40
<br />TRANSFORMER A"
<br />PANEL "LPA
<br />2
<br />GRS 3;1/0,
<br />1 6 GND
<br />301
<br />PANEL "LPA"
<br />POWER PULLBOX "P1"
<br />2"
<br />GRS-PVC
<br />-
<br />FOR FUTURE EXPANSION
<br />41
<br />CONTROL PANEL "SRP"
<br />SURGE RETURN PUMP 1
<br />-
<br />- SUBMERSIBLE PUMP CABLE
<br />STRAIN RELIEF TO PANEL
<br />302
<br />POWER PANEL "PDP"
<br />POWER PULLBOX "P1
<br />GRS-PVC
<br />-
<br />FOR FUTURE EXPANSION
<br />42
<br />CONTROL PANEL SR
<br />SURGE RETURN PUMP 2
<br />-
<br />- SUBMERSIBLE PUMP CABLE
<br />STRAIN RELIEF TO PANEL
<br />303
<br />POWER PANEL "PDP"
<br />POWER PULLBOX "P1"
<br />GRS-PVC
<br />-
<br />FOR FUTURE EXPANSION
<br />43
<br />PANEL "LPA"
<br />CONTROL PANEL "SRP"
<br />1
<br />GRS-PVC 2#10,
<br />1#12 GND
<br />P1, P2, P3
<br />1000
<br />POWER UTILITY
<br />UTILITY TRANSFORMER
<br />PVC -120
<br />3
<br />8"
<br />NYLON PULL ROPE
<br />44
<br />PANEL "LPA
<br />CONTROL PANEL "CPCP"
<br />3 4"
<br />GRS-PVC 2
<br />12, 1 12 GND
<br />P1, P2, P3
<br />1001
<br />UTILITY TRANSFORMER
<br />MAIN SWITCHBOARD "MS"
<br />t4e
<br />PVC -120
<br />3
<br />8"
<br />NYLON PULL ROPE
<br />45
<br />CONTROL PANEL "SRP"
<br />FLOAT SWITCHES
<br />-
<br />- FLOAT SWITCH CABLES
<br />STRAIN RELIEF TO PANEL
<br />1002
<br />MAIN SWITCHBOARD "MS"
<br />ATS
<br />GRS
<br />3
<br />600, 1 2 GND
<br />51
<br />CONTROL PANEL "ESRP"
<br />EMERG. STRG RTN PUMP
<br />3 4"
<br />GRS-PVC SUBMERSIBLE PUMP CABLE
<br />1003
<br />ATS
<br />POWER PANEL PDP"
<br />GRS
<br />3
<br />600, 1 2 GND
<br />52
<br />CONTROL PANEL ESRP"
<br />FLOAT SWITCH
<br />3 4
<br />GRS-PVC FLOAT SWITCH CABLE
<br />1004
<br />GENERATOR
<br />ATS
<br />GRS-PVC
<br />3
<br />4/0, 1 6 GND, 1#1/0 NEU
<br />53
<br />CONTROL PANEL "ESRD"
<br />CONTROL PANEL "AM"
<br />31e
<br />GRS-PVC 2#14
<br />11, 12, 13
<br />HIGH LEVEL ALARM
<br />1005
<br />GENERATOR
<br />CONTROL PANEL "AM"
<br />3./4!'
<br />GRS-PVC
<br />4
<br />14
<br />ATS GEN START & GEN ALARM
<br />61
<br />CONTROL PANEL "FFP"
<br />FILTER FEED PUMP 1
<br />31e
<br />PVC -80 SUBMERSIBLE
<br />PUMP CABLE
<br />1006
<br />MAIN SWITCHBOARD "MT
<br />CONTROL PANEL AM"
<br />3 4"
<br />GRS-PVC
<br />2114
<br />POWER FAIL ALARM
<br />62
<br />CONTROL PANEL FFP"
<br />FILTER FEED PUMP #2
<br />3/4'
<br />PVC -80 SUBMERSIBLE PUMP CABLE
<br />1007
<br />TELEPHONE BACKBOARD
<br />TELEPHONE UTILITY
<br />2'
<br />PVC -40
<br />3
<br />8"
<br />NYLON PULL ROPE
<br />63
<br />CONTROL PANEL FF
<br />FILTER AIR SOLENOID VALVE
<br />314e I
<br />GRS-PVC 2#14,
<br />1#14 GND
<br />1008
<br />TELEPHONE BACKBOARD
<br />CONTROL PANEL A
<br />3 4
<br />GRS
<br />PHONE CABLE
<br />AUTO DIALER
<br />64
<br />CONTROL PANEL FF
<br />FLOAT SWITCHES
<br />2
<br />PVC -80 FLOAT SWITCH CABLES
<br />1009
<br />PANEL uLP9
<br />AREA LIGHTS
<br />3/4!'
<br />GRS-PVC
<br />2#12,
<br />1#12 GND
<br />P1
<br />65
<br />CONTROL PANEL FF
<br />CONTROL PANEL AM
<br />3/4" 1
<br />GRS-PVC 2#14
<br />11, 12, 13
<br />HIGH LOW LEVEL ALARM
<br />1010
<br />FUEL STORAGE
<br />GENERATOR
<br />3 4'
<br />GRS-PVC
<br />2#14
<br />LOW FUEL SWITCH
<br />70
<br />TRANSFORMER Er
<br />I PANEL "LPB"
<br />1
<br />GRS 13#6,
<br />1#8 GND
<br />1011
<br />PANEL "LPA"
<br />I GEN. HEATER & CHARGER
<br />3/4!'
<br />GRS-PVC
<br />4#12,
<br />2f.12 GND
<br />71
<br />CONTROL PANEL "FC
<br />FILTER COMPRESSOR #1
<br />- I
<br />- -
<br />1012
<br />PANEL *LPAr
<br />JAREA LIGHTS
<br />3/4- 1
<br />GRS-PVC
<br />2#12,
<br />1#12 GND
<br />P1, P2, P3
<br />®DEWANTE AND STOWELL
<br />CONSULTING ENGINEERS
<br />SACRAMENTO, CALIFORNIA
<br />FLAG CITY
<br />SAN JOAQUIN CO.. CALIFORNIA
<br />WASTEWATER TREATMENT FACILITIES
<br />ELECTRICAL SITE PLAN
<br />DRAWING NUMBER SHEET NUMBER
<br />E-4 34 of 44
<br />1.1
<br />4
<br />S
<br />2
<br />1
<br />
|