Laserfiche WebLink
n <br />PULL BOX P2 <br />PULL BOX 12 <br />RAW SEWAGE <br />PUMP STATION <br />SEE DWG E-6 <br />SEE NOTE Q2 <br />CONTROL PANEL "AM" <br />POWER PANEL "PDP" <br />PANEL "LPA" <br />PULL BOX 11 <br />PULL BOX P1 <br />I, <br />II <br />II <br />I� <br />II <br />I I <br />II <br />i <br />L- <br />N <br />0 <br />!? <br />/ SEE NOTE Q2---------- y ---------------------------------- ----------------- <br />CONTROL <br />BUILDING <br />SEE DWG E-5 <br />II <br />II <br />t� <br />II <br />I� <br />t� <br />I <br />I <br />I <br />II <br />MAIN SWITCHBOARD "MS" j <br />I I I <br />I <br />1/0 BARE I I SEE <br />COPPER WIRE I NOTE <br />1001 I G j <br />INSTALL PAD & i 1004 <br />BARRIER POSTS I <br />PER PG&E STANDARDS I , j 1005 <br />I i 1011 <br />1 I I <br />TO PG&E PULLBOX <br />AT NEAR SIDE OF ------- ° <br />SADDLE CITY DRIVE i I 1010 <br />I <br />I I <br />I <br />UTILITY TRANSFORMER 1 j <br />, <br />STANDBY GENERATOR <br />I I <br />I <br />. I <br />I <br />FUEL STORAGE <br />I <br />i <br />USS/pHgl <br />TO TELCO <br />PULLBOX AT <br />NEAR SIDE OF <br />r NO. 118 a DE BROGGI ROAD <br />Exp -9-30-96 <br />* f F�£CTR� F��Q NOTES: A INSTALL ALL UNDERGROUND CONDUITS <br />9lF0 ck1\F�� PER DWG E-3, DETAIL "B" <br />FILE, 9404C-03 A INSTALL CONDUITS BETWEEN PULL BOXES <br />PER DWG E-3, DETAIL -F- <br />3123 BROADWAY <br />SACRAMENTO, CA. 95817 <br />916-457-8144 <br />SCALE DATE <br />AUGUST 1994 DESIGNED RLV SUBMITTED - <br />1' 10' FILE DRAWN ZKV RECOMMENDED <br />CHECKED RLV APPROVED - <br />SURGE RETURN <br />PUMP STATION <br />SURGE TANK <br />D A E A F <br />EMERGENCY STORAGE <br />RETURN PUMP <br />53 SEE DWG E-10 <br />I � O <br />CD <br />.............................................................. ................... <br />PULL BOX P3CK)SLUDGE POLYMER STORAGE SLUDGE DEWATERING <br />i SEE DWG E-8 FACILITIES <br />PULL BOX 13 <br />--------- <br />------------ <br />o`- --- - <br />--- <br />AERATION TANK 44 <br />65 <br />SEE DWG E-7 63 6 <br />CLARIFIER FILTER PUMP STATION #25 <br />----------i---------- <br />43 <br />L- - - <br />FUTURE EXPANSION <br />FACILITIES <br />I <br />I <br />I <br />I <br />SEE NOTE <br />I <br />I <br />I <br />t <br />I <br />PULL BOX P4 <br />PULL BOX 14 -� <br />I <br />I <br />I <br />I <br />I <br />I <br />---------------� <br />I � <br />I <br />I I <br />I , <br />I , <br />I , <br />I i <br />I , <br />I , <br />I , <br />I , <br />I <br />I <br />I , <br />I , <br />I , <br />I , <br />I , <br />I, <br />I <br />1012 <br />pur <br />- F--m� <br />82 <br />I h <br />L -----J <br />63 200 <br />6" MAGNETIC <br />FLOWMETER <br />7� <br />I I <br />I I � <br />LPA <br />- J #27 <br />LPA <br />93 <br />vWp <br />I <br />00 <br />WP t <br />91 <br />I ) <br />----- O <br />- CHEMICAL STORAGE <br />EFFLUENT <br />FLOW <br />EFFLUENT POLYMER STORAGE <br />SEE DWG E-9 (FILTER COMPRESSOR) <br />FUTURE EXPANSION <br />FACILITIES <br />L----------- <br />---------- <br />---------- <br />---------- <br />`- <br />`-- SAMPLER RECEPTACLE <br />CONTINUOUS FLOW FILTER <br />CHLORINATION BUILDING <br />SEE DWG E-8 <br />CHLORINE CONTACT BASIN <br />G <br />REVISION <br />DESCRIPTION <br />UTILITY CONTACTS: <br />PG&E: FRANK SALADY <br />(209) 942-1407 <br />PAC BELL: BILL CHELSETH <br />(916) 811-4745 <br />H <br />BY I APP I DATE <br />COND. <br />NO. <br />FROM <br />CONDUIT SCHEDULE <br />TO <br />COND. <br />SIZE <br />CONDUIT <br />TYPE <br />CONDUCTOR <br />SIZE & QTY <br />VIA <br />PULL BOXES <br />NOTES <br />COND. <br />NO. <br />FROM <br />CONDUIT SCHEDULE <br />COND. <br />TO SIZE <br />CONDUIT <br />TYPE <br />CONDUCTOR <br />SIZE & QTY <br />VIA <br />PULL BOXES <br />NOTES <br />1 <br />POWER PANEL "PDP" <br />CONTROL PANEL "AB" <br />3" <br />GRS 3#3/0, <br />1 4 GND <br />72 <br />CONTROL PANEL "FC' <br />FILTER COMPRESSOR #2 <br />- <br />- <br />- <br />PACKAGE UNIT <br />2 <br />POWER PANEL "PDP" <br />F CONTROL PANEL BLOWER 3 <br />2" <br />GRS <br />- <br />73 <br />PANEL "LPB" <br />CONTROL PANEL "FC" <br />1" <br />GRS-PVC <br />3#10, <br />1#1 0 GND <br />3 <br />POWER PANEL "PDP" <br />CONTROL PANEL RS <br />1" <br />GRS-PVC 3 <br />10, 1 10 GND <br />P1 <br />74 <br />PANEL " LPB" <br />AIR DRYER <br />3/4:' <br />GRS-PVC <br />2#12, <br />13N GND <br />_ <br />4 <br />POWER PANEL "PDPn <br />TRANSFORMER A <br />1 2 <br />GRS 243, <br />1#6 GND <br />75 <br />PANEL "LPB" <br />SAND FILTER <br />3/4:' <br />GRS-PVC <br />- <br />STUB AND CAP <br />5 <br />POWER PANEL "PDP" <br />CONTROL PANEL "ESRP" <br />1" <br />GRS-PVC 3#12, <br />1#12 GND <br />P1,P2,P3 <br />76 <br />EFFLUENT POLYMER PUMP <br />CONTROL PANEL "AM" <br />3/4" <br />GRS-PVC <br />1#16 <br />T.S.PR. <br />11, 12, 13 <br />CHEMICAL PACING <br />6 <br />POWER PANEL "PDP" <br />CONTROL PANEL FFP" <br />1" <br />GRS-PVC 3#12, <br />1#12 GND <br />P1,P2,P3 <br />80 <br />TRANSFORMER "C" <br />PANEL "LPC" <br />1" <br />GRS <br />3#6, <br />1#8 GND <br />7 <br />POWER PANEL "PDPh <br />TRANSFORMER "B" <br />1/4- <br />GRS-PVC 3#8, <br />1#10 GND <br />P1,P2,P3 <br />81 <br />PANEL "LPC" <br />CONTROL PANEL "PMU" <br />1" <br />GRS-PVC <br />2 <br />8, <br />1#12 GND <br />6 <br />POWER PANEL PD <br />TRANSFORMER " <br />1 4 <br />GRS-PVC 3#8, <br />1#10 GND <br />P1,P2,P3 <br />82 <br />CONTROL PANEL PMU <br />SLUDGE DEWATERING <br />3/4:' <br />GRS-PVC <br />4#14, <br />1#14 GND <br />9 <br />POWER PANEL "PDP" <br />TRANSFORMER "D" <br />1 4 <br />GRS-PVC 3#8. <br />1#10 GND <br />P1,P2,P3, P4 <br />83 <br />CONTROL PANEL "PMU" <br />CONTROL PANEL "AM" <br />3/47 <br />GRS-PVC <br />1#16 <br />T.S.PR. <br />11, 12, 13 <br />CHEMICAL PACING <br />10 <br />POWER PANEL "PDP" <br />F SLUDGE POLYMER STRG <br />1/4! <br />GRS-PVC <br />- <br />P1,P2,P3 <br />STUB AND CAP <br />84 <br />F SLUDGE POLYMER STORAGE <br />CONTROL PANEL "AM" <br />31e <br />GRS-PVC <br />- <br />11, 12, 13 <br />F CHEMICAL PACING <br />11 <br />CONTROL PANEL "AB" <br />AERATION BLOWER #1 <br />1 1 4 <br />GRS 3#4, <br />11.8 GND <br />90 <br />TRANSFORMER "D" <br />PANEL "LPD" <br />1" <br />GRS <br />3 <br />6, <br />1 #8 GND <br />12 <br />CONTROL PANEL "Alir <br />AERATION BLOWER #2 <br />1 1/4 <br />GRS 3#4, <br />1#8 GND <br />91 <br />CL2 BUILDING <br />CONTROL PANEL "AM" <br />1" <br />GRS-PVC <br />1 <br />16 <br />T.S.PR. <br />11, 12, 13, 14 <br />CHEMICAL PACING <br />21 <br />CONTROL PANELBLOWER 3 <br />F AERATION BLOWER 3 <br />1/47 <br />GRS <br />- <br />92 <br />PANEL "LPA" <br />SAMPLER RECEPTACLE <br />31e <br />GRS-PVC <br />2 <br />12, <br />1 12 GND <br />P1, P2, P3, P4 <br />31 <br />CONTROL PANEL "RSP" <br />RAW SEWAGE PUMP #1 <br />31/4" <br />PVC -80 SUBMERSIBLE PUMP CABLE <br />93 <br />PANEL "LPA' <br />CHEM STORAGE AREA RECPT <br />314 <br />GRS-PVC <br />2 <br />12, <br />1#12 GND <br />P1, P2, P3, P4 <br />32 <br />CONTROL PANEL "RSP" <br />RAW SEWAGE PUMP 2 <br />3/4- <br />PVC -60 SUBMERSIBLE PUMP CABLE <br />200 <br />INFLUENT FLOW METER <br />CONTROL PANEL "AM" <br />3/4:' <br />GRS-PVC <br />1 <br />16 <br />T.S.PR., 2#14, 1#14 GND <br />11, 12, 13, 14 <br />33 <br />CONTROL PANEL "RSP" <br />RAW SEWAGE PUMP #3 <br />3 4 <br />PVC -60 SUBMERSIBLE PUMP CABLE <br />201 <br />ICONTROL PANEL "AM" <br />INSTRUMENT PULLBOX "11" <br />2" <br />GRS-PVC <br />- <br />FOR FUTURE EXPANSION <br />34 <br />CONTROL PANEL nRSPO <br />FLOAT SWITCHES <br />1 <br />PVC -80 FLOAT SWITCH CABLE <br />202 <br />CONTROL PANEL AM <br />INSTRUMENT PULLBOX "11" <br />2" <br />GRS-PVC <br />- <br />FOR FUTURE EXPANSION <br />35 <br />CONTROL PANEL "RSP'CONTROL <br />PANEL AM" <br />3/4 <br />GRS-PVC 2T1 <br />4 <br />11 <br />HIGH LOW LEVEL ALARM <br />203 <br />INTRUSION DOOR SWITCHES <br />CONTROL PANEL "AM" <br />3/9 <br />EMT <br />6#14 <br />40 <br />TRANSFORMER A" <br />PANEL "LPA <br />2 <br />GRS 3;1/0, <br />1 6 GND <br />301 <br />PANEL "LPA" <br />POWER PULLBOX "P1" <br />2" <br />GRS-PVC <br />- <br />FOR FUTURE EXPANSION <br />41 <br />CONTROL PANEL "SRP" <br />SURGE RETURN PUMP 1 <br />- <br />- SUBMERSIBLE PUMP CABLE <br />STRAIN RELIEF TO PANEL <br />302 <br />POWER PANEL "PDP" <br />POWER PULLBOX "P1 <br />GRS-PVC <br />- <br />FOR FUTURE EXPANSION <br />42 <br />CONTROL PANEL SR <br />SURGE RETURN PUMP 2 <br />- <br />- SUBMERSIBLE PUMP CABLE <br />STRAIN RELIEF TO PANEL <br />303 <br />POWER PANEL "PDP" <br />POWER PULLBOX "P1" <br />GRS-PVC <br />- <br />FOR FUTURE EXPANSION <br />43 <br />PANEL "LPA" <br />CONTROL PANEL "SRP" <br />1 <br />GRS-PVC 2#10, <br />1#12 GND <br />P1, P2, P3 <br />1000 <br />POWER UTILITY <br />UTILITY TRANSFORMER <br />PVC -120 <br />3 <br />8" <br />NYLON PULL ROPE <br />44 <br />PANEL "LPA <br />CONTROL PANEL "CPCP" <br />3 4" <br />GRS-PVC 2 <br />12, 1 12 GND <br />P1, P2, P3 <br />1001 <br />UTILITY TRANSFORMER <br />MAIN SWITCHBOARD "MS" <br />t4e <br />PVC -120 <br />3 <br />8" <br />NYLON PULL ROPE <br />45 <br />CONTROL PANEL "SRP" <br />FLOAT SWITCHES <br />- <br />- FLOAT SWITCH CABLES <br />STRAIN RELIEF TO PANEL <br />1002 <br />MAIN SWITCHBOARD "MS" <br />ATS <br />GRS <br />3 <br />600, 1 2 GND <br />51 <br />CONTROL PANEL "ESRP" <br />EMERG. STRG RTN PUMP <br />3 4" <br />GRS-PVC SUBMERSIBLE PUMP CABLE <br />1003 <br />ATS <br />POWER PANEL PDP" <br />GRS <br />3 <br />600, 1 2 GND <br />52 <br />CONTROL PANEL ESRP" <br />FLOAT SWITCH <br />3 4 <br />GRS-PVC FLOAT SWITCH CABLE <br />1004 <br />GENERATOR <br />ATS <br />GRS-PVC <br />3 <br />4/0, 1 6 GND, 1#1/0 NEU <br />53 <br />CONTROL PANEL "ESRD" <br />CONTROL PANEL "AM" <br />31e <br />GRS-PVC 2#14 <br />11, 12, 13 <br />HIGH LEVEL ALARM <br />1005 <br />GENERATOR <br />CONTROL PANEL "AM" <br />3./4!' <br />GRS-PVC <br />4 <br />14 <br />ATS GEN START & GEN ALARM <br />61 <br />CONTROL PANEL "FFP" <br />FILTER FEED PUMP 1 <br />31e <br />PVC -80 SUBMERSIBLE <br />PUMP CABLE <br />1006 <br />MAIN SWITCHBOARD "MT <br />CONTROL PANEL AM" <br />3 4" <br />GRS-PVC <br />2114 <br />POWER FAIL ALARM <br />62 <br />CONTROL PANEL FFP" <br />FILTER FEED PUMP #2 <br />3/4' <br />PVC -80 SUBMERSIBLE PUMP CABLE <br />1007 <br />TELEPHONE BACKBOARD <br />TELEPHONE UTILITY <br />2' <br />PVC -40 <br />3 <br />8" <br />NYLON PULL ROPE <br />63 <br />CONTROL PANEL FF <br />FILTER AIR SOLENOID VALVE <br />314e I <br />GRS-PVC 2#14, <br />1#14 GND <br />1008 <br />TELEPHONE BACKBOARD <br />CONTROL PANEL A <br />3 4 <br />GRS <br />PHONE CABLE <br />AUTO DIALER <br />64 <br />CONTROL PANEL FF <br />FLOAT SWITCHES <br />2 <br />PVC -80 FLOAT SWITCH CABLES <br />1009 <br />PANEL uLP9 <br />AREA LIGHTS <br />3/4!' <br />GRS-PVC <br />2#12, <br />1#12 GND <br />P1 <br />65 <br />CONTROL PANEL FF <br />CONTROL PANEL AM <br />3/4" 1 <br />GRS-PVC 2#14 <br />11, 12, 13 <br />HIGH LOW LEVEL ALARM <br />1010 <br />FUEL STORAGE <br />GENERATOR <br />3 4' <br />GRS-PVC <br />2#14 <br />LOW FUEL SWITCH <br />70 <br />TRANSFORMER Er <br />I PANEL "LPB" <br />1 <br />GRS 13#6, <br />1#8 GND <br />1011 <br />PANEL "LPA" <br />I GEN. HEATER & CHARGER <br />3/4!' <br />GRS-PVC <br />4#12, <br />2f.12 GND <br />71 <br />CONTROL PANEL "FC <br />FILTER COMPRESSOR #1 <br />- I <br />- - <br />1012 <br />PANEL *LPAr <br />JAREA LIGHTS <br />3/4- 1 <br />GRS-PVC <br />2#12, <br />1#12 GND <br />P1, P2, P3 <br />®DEWANTE AND STOWELL <br />CONSULTING ENGINEERS <br />SACRAMENTO, CALIFORNIA <br />FLAG CITY <br />SAN JOAQUIN CO.. CALIFORNIA <br />WASTEWATER TREATMENT FACILITIES <br />ELECTRICAL SITE PLAN <br />DRAWING NUMBER SHEET NUMBER <br />E-4 34 of 44 <br />1.1 <br />4 <br />S <br />2 <br />1 <br />