My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-3100
PublicWorks
>
VAULT MAPS
>
Subdivision - SU (GIS FILES)
>
SU-3075-3221
>
SU-3100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2024 9:17:54 AM
Creation date
10/9/2024 9:17:53 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8" DIAMETER ALT. <br />SEWER PIPE <br />Location Quantity <br />STADIUM DRIVE 381 L.F. <br />UTAH AVENUE 310 L.F. <br />SAN RAFAEL AVENUE 670 L.F. <br />TOTAL 1,361 L.F. <br />MAINTENANCE HOLE (M.H.) <br />& FRAME COVER (M.H.) <br />Location Quantity <br />FULTON AVENUE <br />UTAH AVENUE <br />SAN RAFAEL AVENUE <br />2 EA. <br />4 EA. <br />6 X EA. <br />TOTAL 11 EA. <br />ac FRA AMPH O (L.H. <br />A.C. (MISC. AREAS) <br />0.50' TRENCH REPAIR <br />Location Quantity <br />TOTAL 4,050 S.Y. <br />4" DIAMETER ALT. <br />SEWER PIPE <br />I Location Quantity I <br />FULTON AVENUE <br />STADIUM DRIVE <br />UTAH AVENUE <br />SAN RAFAEL AVENUE <br />174 L.F. <br />145 L.F. <br />454 L.F. <br />1,004 L.F. <br />TOTAL 1,777 L.F. <br />PLANING <br />CONCRETE <br />MAINS <br />LATERALS <br />TOTAL <br />FULTON <br />172 <br />19 <br />141 <br />S.Y. <br />STADIUM <br />170 <br />16 <br />186 <br />S.Y. <br />UTAH AVE <br />1,750 <br />48 <br />48 <br />S.Y. <br />SAN RAFAEL <br />577 <br />103 <br />680 <br />S.Y. <br />TOTAL 4,050 S.Y. <br />4" DIAMETER ALT. <br />SEWER PIPE <br />I Location Quantity I <br />FULTON AVENUE <br />STADIUM DRIVE <br />UTAH AVENUE <br />SAN RAFAEL AVENUE <br />174 L.F. <br />145 L.F. <br />454 L.F. <br />1,004 L.F. <br />TOTAL 1,777 L.F. <br />PLANING <br />CONCRETE <br />ASPHAP.`f" <br />PAVEMENT <br />Location <br />Qw-ntity <br />FULTON STREET <br />690 <br />S.Y. <br />STADIUM DRIVE <br />454 <br />S.Y. <br />UTAH AVENUE <br />967 <br />S.Y. <br />SAN RAFAEL AVENUE <br />1,750 <br />S.Y. <br />TOTAL 4,050 <br />S.Y. <br />ADJUST MAINTENANCE HOLE <br />FRAMES AND COVERS <br />Location Quantity <br />FULTON STREET <br />STA. 12+50 1 EA. <br />STA. 15+25 1 EA. <br />SAN RAFAEL AVENUE <br />STA. 12+50 1 EA. <br />STA. 15+25 1 EA, <br />TOTAL 4 EA. <br />MAINTAIN <br />EXISTING LAWN (SOD) <br />Location Quantity <br />63 SERVICES <br />® 3.33 S.Y. TOTAL 210 S.Y. <br />ASPHALT CONCRETE <br />(TYPE 8) <br />Location Quantity <br />ROADWAY OVERLAY 688 TONS <br />TRENCH REPAIR 484 TONS <br />TOTAL 1,172 TONS <br />M e <br />S- <br />1,/,.,olg6 ,_s.: <br />WEST LANE HEIGHTS / PARK <br />SEWER PROJECT, PHASE 2 <br />SUMMARY OF QUANTITIES <br />SCALE: NONE <br />DESIGNED BY: <br />DRAWN BY: C.J.G. <br />CHECKED BY: <br />RECORD DWG.: <br />DEPAKi MENT OF PUBLIC WORKS <br />CIN OF STOCKTON, CALIFORNIA <br />APPROVED BY: DATE: <br />7- 3 —96 <br />41CCITY ENGINEER <br />STOCKTON. C. ,LIF. <br />SHEET NO <br />OF % SHEFTS <br />PROJECT JO. <br />3 91a•cp C <br />
The URL can be used to link to this page
Your browser does not support the video tag.