Laserfiche WebLink
LEGEND <br />Ss / ® LOCATION OF "Ri1 VALUE TESTS PER ANDERSON 4 ASSOC. SOILS REPORT NO 59118 <br />DAM"I/VA <br />0 91 <br />N <br />SCALE: I"=100' <br />F <br />9 <br />TURNER RORD <br />illI I VICINITY MAI <br />-f, �' s <br />CND SL'ALE� <br />BENCH MARK DATUM <br />PER U.S.B S. 9,M 19-8 190? -4S. LOCATION NORTMWEST <br />CORNER OF MASONIC BUILDING INTVAIL TOWN OF WOOD- <br />B121DGE. ELEVATION 4S. 85 IS MUST CURRENT PER - <br />FEMA. <br />UNIT 2 <br />SHEE <br />O KEY SHEET & NOTES <br />2O - OO PLAN & PROFILE <br />® GRADING PLAN <br />CONSTRUCTION DETAILS <br />CONSTRUCTION STAICING LIAIIILITY WAlVIR <br />These Improvement Marls have been prepared will, the Intent ilial file ILuI of Bat nJbach & Plazza, hnc. will <br />be performing the conslrncfioa skulking for the complete project. if, however, another engineering and/or <br />s,uveying Ili -in should be employed to Ilse (hese plans fm• the propose of construction staking, notice is hereby <br />given that file fun of Baumbach & Piazza, lire. will not ass,une an res wnsibilil for errors or , c <br />Y - 1 9 o,1L liens, <br />If tiny, which might occur and which could have been avoided, corrected or mitigated if Ballinbach & 1'la7.za, <br />like. had performed file staking woik, or if Buunnbuch & Piltzza, hnc. had been contacted prior to slaking <br />regarding any question of nunbigully ill the plans, hnlerprelallon of the pleas, or enghleeling Inconsistencies <br />contalraed In the plans. <br />g N0. DATE REVISIONS BY DESIGN •S. _DRAWN BY 6AD. <br />E <br />LL <br />N <br />m <br />PROV BY i Y PIAZZA / <br />o - R.C.E.19,(_�ipl•,Efp•'9i°11i97 DATE <br />INDENINITY ('LMJSE <br />The. Conlruclor og,r.es that he shall assume sole and complete responsildlii3' fol• job site conditions during <br />like c'oul so, of eonstrrkc(bul IIf Nis prejM l: (lull this r`gllreJueJn1 Shall ali]]]t"� l'Iuktinnnllsly Anil ]lot be ]hulled <br />14) normal working hooks; and that file Coafllclor shell defend, Indemnify and bold harmless, the Cotndy of <br />Son .Joaquin, its elrc(ed officials, employees, agelnl S, also file owner and pr{'oject engineer from any and all <br />claims of kllgallon, damages and aliorley s, fee%, 1'01, persona] injury or prolifu ly thumage of whatever naluwe <br />rvldch are claimed to have occurred during file Iona of this project. � <br />eaumTY OF SANJOAQUIN <br />DEPAUMENT U PUBLIC W OWKS <br />A ROVED INY hemi M.ulvo DATE° <br />III <br />� KIL No: <br />biQECTO U�L'IC QKS EXP. DATA <br />RMRWOOD DRIVE TI =1;,0 ; 9VALUE=29 <br />(ND SCALE( 6E.4EOUIRED.125. 6.EPRaV1DED 4_2_10 <br />60' MATCH SAME TYPE ASU IT NO,2 <br />N'M FT %C@FT. <br />O. Zi' AC ,TYPE" 5; DVEQ PRI ME tm-r IS[-\JELED CUR I3,GUT 2_2 <br />011)Afl.,CL.n Q.C.@45% ESIDEWALK <br />0.8'-45q Q.C. ORIGINAL GROUND. 0.8 - 42% 12-.C. CCONC. SUfl6QADE <br />WWDR07 COURT a WMDRIFT WAY COMP) <br />WW wo SCALED MATCH EXISTING UNIT NO. I �lW <br />ki� AC TYPE•8", OVE4 PRIME COAT --L <br />957- RC OQICGINAL CaPQUNO <br />MU)FT CT.: T 1.-3.5, 4 -VALUE -21 <br />WIN➢RIFT WA O LN) DF ffIAMIFT T T. L 4.O ; R VAW Er35 <br />WIMUIFT WAY CS) OF WIKi ZF T CT T 1,=AU,, 2 -VALUE -21 <br />n <br />-M-VELEM CURB,CGUTCEQ <br />S%L\NALK <br />0.8 -92% R,C.000NC.SUBC�eADE nm?.) <br />STeEET <br />Q0.1C?MT <br />STeEET Ur."NS <br />= W000641DGE LIf�41TIN6 DISTRICT <br />IDE� <br />Gk.DDP.2.4qD3?V <br />=WOOOISUbrE- 8ANITA4Y DISTRICT <br />NATURAL GAS g ELECTRIC <br />= P. C -e. tE. <br />TELEP14ONE <br />PACIFIC BELL <br />tlW11iNt�DQQIF1FTT XVCT0. 1)Dr\AMtZTTQT. <br />LORI CAILETV <br />1 <br />WADE P I E y <br />ffRM JJJ <br />- "- T <br />QES MAINENANCE <br />= i UKELUMN❑Q <br />CTA1''WINDQITWACSO1NDeF? <br />0.2 <br />DRAIN LINE %(DIRECTION OF FLOW <br />l.U3 <br />SEQVICU <br />STeEET Ur."NS <br />= W000641DGE LIf�41TIN6 DISTRICT <br />SANITAR'( SEWER <br />=WOOOISUbrE- 8ANITA4Y DISTRICT <br />NATURAL GAS g ELECTRIC <br />= P. C -e. tE. <br />TELEP14ONE <br />PACIFIC BELL <br />CABLE TV <br />LORI CAILETV <br />1 <br />WADE P I E y <br />ffRM JJJ <br />- "- T <br />QES MAINENANCE <br />= i UKELUMN❑Q <br />Lt <br />EXISTING PROPOSED <br />DRAIN LINE %(DIRECTION OF FLOW <br />- s'sS -_� sr-_gAUITAR <br />C SEWER UNE WI DiRECTIDN CF FLOW <br />m vv =WATER LASE <br />CE- = =� <br />=FIRE HYDRANT <br />BC <br />•BEGIN CURVE <br />EC <br />=END CUQVE <br />BC2 <br />-6E&IN CUQ6 RETURN <br />ECR <br />=END CUIQB RETURN <br />GB <br />=GRADE 84EAK <br />I <br />=STOP SIGN <br />GCB <br />=CURB INLET CATCH BASIN <br />= •- <br />=ST7EETLIGLIT(Wi30'S70.c8'ARM)N46uPRESSURESODIUMVLPOR <br />?t <br />=STREET SIGN (ISO W) <br />w <br />=WATER VALVE WITH BOX <br />LP <br />=LOW PRINT <br />44P <br />•14161.1 POINT <br />TC <br />-TOP OF CURB <br />COTG <br />-CLEAN-DUTTO GRADE <br />d <br />8.0. -P LDW DF F <br />- O - --�- <br />SANITARY SEWEQ MANNULE (MW) <br />'-0-- <br />=STORM DEAN MANHOLE CSDM I) <br />EK. 31.08 INV, 34.D8 <br />=PIPE INVERT ELEVATION <br />=CENTERLINE <br />RAMP <br />APPROVE <br />BHA <br />DATE <br />SM JsasoNr PNauQ RUM <br />SM JasmN QeIMlr PM FAWN OAT E <br />::rawrr_-s!v�hi�- r _Id1G' <br />lie . <br />BAUMBACH & PIAZZA <br />CIVIL ENGINEERS <br />SURVEYORS <br />323 W. ELM ST, LOD1, CALIF. <br />95240 PM: 209-38B-BB'IB <br />2 \ <br />gni 4 Ib rrll.�If A <br />asV �/ 2sk" al <br />GENERAL NOTES <br />1. All work shad] conform to these plans and special provisions for this <br />project. <br />2. Refer to the final map of this subdivision for all centerline and - <br />property line dais. " <br />3. The street light system shell be installed by P. G. & E. Company. <br />4. The Contractor shall receive an approved set of plans and <br />specifications prior to beginning construction. <br />S. Baninbach & Piazza (Engineer) shall set all survey controls and <br />construction slakes„necessary for completion of woreL The <br />Contractor shall be responsible for the preservation of all survey <br />and construction stakes. Survey and construction stakes that are <br />lost or destroyed, due to Contractor's negligence, will be reset by <br />the Engineer al the Contractor's expense. <br />6. The existing underground I1011ti6s were plotted from available <br />records. The Contractor shall be responsible for contacting all <br />utility agencies to mark their facilities In the field before any <br />excavation. The Contractor shall notify and coordinate all work <br />with airy agency requiring removal or relocation of their utilities. <br />Pacific Bell, P. G. & E., Loth Cable T.V., Woodbridge Sanitary <br />District and Mokelumnne, Acres Maintenance District and U.S.A. <br />(800) 642-2444. <br />7. Rome services, fire hydrant laterals and street light coledull shall <br />be installed prior to curb and gutter construction. All underground <br />utMes within the street area, Including gas and telephone lines, <br />shall be installed prior to paving. <br />IL AB manholes are to be set flush with the finish grade, unless <br />otherwise Indicated. <br />9. AM water lines shall have a minimum cover of 30". <br />10. Water used in any phase of construction, such as backfill <br />compaction, dust control, testing or other work herein required, <br />ehaB be included in the trait price or lamp sum bid for the <br />respective Item of construction. • <br />11. Contractor agrees that he shag assume sole and complete <br />responsibility for job site conditions during /he' course of <br />construction of this project, Including safety for all persons and <br />property; that this requirement shall apply continuously and not be <br />limited to normal working hours and that Contractor shall defend, <br />Indemnify, and hold the Owner, County and the Engineer harmless <br />from any and all liability, real or alleged, In connection with tine <br />performance of work on this project, excepting for liability arising <br />from the sole negligenc0"61 the Owner or the Engineer. <br />12- Contractor shall give Engineer a mhdnu m of 48 hours notification <br />prior to staking any ntilhles. <br />13. Sanitary Sewer Services shall be marked by the curb & gutter <br />Contractor with an "S" stamped on the top of curb. <br />14. Water services shag be marked by the curb and,gutter Contractor <br />with a "W" stamped on the top of curb. Location of -water <br />markings shall be verified In the field by the Engineer. <br />15. Lot grading shall be completed before starting any underground <br />construction. Refer to attached grading plan. <br />Lot 2' <br />fir g • <br />SS S w. <br />TYPICAL <br />ATE: (Typ. All Lots) <br />I- Unless othowlse noted, services to be <br />at center of lots. <br />2. Services e/niella of 3 feet apart on mais <br />Line & einioian of 3 feet from wines. <br />3. All utter services shall be upstreaw N <br />FN valve in cul -de -sat. <br />4. (dater Service shall include meter and <br />meter box per detail, Sheet 6. <br />5. Sewer Service shall be stubbed and capped <br />at R/;,1 (no cleanout). <br />^,Wotwr 6drrii4lr <br />l i or <br />SERVI( <br />LOT <br />N <br />16. Separation of water and sewer mains (including crossings) and <br />sewer laterals crossing over water mains shall meet or exceed the <br />latest standards of the State of Callforzds Department of health <br />Services. <br />17. The Contractor shall be responsible for nofiWng and co-ordinating <br />all work with any agency requiring removal or relocation of utilities <br />such as Pacific ]cell, P. G. & E., etc. <br />18. Ali off-site water lines shall be pressure tested, disinfected, flushed <br />and tested. for bacterin in conformance will, the San Joaquin <br />-County Health Code Requirements prior to connecting to existing <br />water line. <br />19. All off -elle storm drains shall be cleaned prior to final acceptance <br />20. The Contractor shall visit the site prior to bidding. Specifications <br />are a separate document. <br />21. New traffic striping and the restoration of any damaged existing <br />painted legends or signs Is The responsibility of the Contractor and <br />shall be included in his bid price. , <br />22. Where the water crosses SD or SS use an 18-20" length of CL 200 <br />pipe, centered over, the SS or SD IG a) the water Is under the SS or <br />SD. b) the vertical clearance is less than I fool. <br />23. No materials reselling from tapping procedures may enter District <br />sewer. <br />24. All work will be required to be inspected by the 1%partarkenf of <br />Public Works. They shall be notified not less than 24 hours In <br />advance of commencement of work. <br />26. It Is agreed that neld conditions may require changes 10 these <br />plans. It Is further agreed that the Director of Public Works may <br />require changes, alterations or additions to these plans, when the <br />Director deems them to be necessary or desirable for the proper <br />completion of the work, provided that such changes, alterations and <br />additions shall not exceed 10% of the original estimate of the cost <br />for the improvements without prior approval of the surety. <br />27. Fire hydrant bid shall Include ilia following: Tee, 6" lateral, 6" <br />valve and complete fire hydrant assembly. <br />28. The Contractor shall notify Mokelemne Acres Maintenance District <br />for approval prior to connecting the water Una to exhaling water <br />main. <br />29. Installation of all sanitary sewer Improvements shall conform to the <br />standards of the Woodbridge Sanitary District. All arch work /s <br />subject to inspection by the District Engineer. The Contractor shall <br />notify the District Engineer 48 hours prior to the commencement <br />of any work on the sanitary sewer system. (209) 946-0268. <br />30. Pipe type and strengths allowed for kindergrouud utilities, miles <br />otherwise specified on plans, are as follows: Storm Drain (SD)== <br />RCT CL III or PVC (SDR 35); Sanitary Sewer (SS)r=PVC per <br />ASTM D3034, SDR 35; Water (W)+PVC, CL 150 or greater per <br />AWWA Std. C-900. ' <br />31. All traffic signs and markings shall conform to the San Joaquin <br />County Standards and to the "Marmal of Uniform Traffic Devices". <br />32. Any changes to the approved Improvement Plans and Specifications <br />must be prepared and certified by the "Civil Engineer" and shall <br />be approved by the "Director" prior to implementation. <br />33. All materials used as sanitary sewer system must have written <br />approval from the District Engineer prior to installation. <br />"WINDWOOD" SUBDIVISION SHEET OF <br />KEY SHEET UNIT NO. 3 A JOB NO. BBaS-32_-5 <br />SUBD IVI S ION IMPROVEMENTS NO. Imo- 105e) <br />