My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-3735
PublicWorks
>
VAULT MAPS
>
Subdivision - SU (GIS FILES)
>
SU-3684-3820
>
SU-3735
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2024 9:36:57 AM
Creation date
10/9/2024 9:36:55 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STORM WATER POLLUTION PREVENTION PLAN <br />WITH THE EXCEPTION OF PROPERLY DESILTED WATER FROM SITE DEWATERING, THE <br />CONTRACTOR SHALL NOT DISCHARGE ANY MATERIALS AND/OR LIQUIDS TO THE STORM <br />DRAINAGE SYSTEM. ACTIVITIES OF PARTICULAR CONCERN ARE: <br />A. CONTRACTOR SHALL DESIGNATE A CONCRETE TRUCK CLEAN—OUT AREA. CITY <br />INSPECTOR APPROVED BEST MANAGEMENT PRACTICES SHALL AT ALL TIMES BE FULLY <br />IMPLEMENTED AT AND AROUND THE CLEAN—OUT AREA. <br />B. TACK COAT AND PRIME COAT ASPHALTS SHALL BE CAREFULLY SPRAYED AND ANY <br />EXCESS MATERIAL SPILLED SHALL BE CLEANED UP IMMEDIATELY BY PROPER <br />METHODS. <br />C. ALL EQUIPMENT REFUELING IN THE PROJECT AREA SHALL BE CAREFULLY DONE TO <br />AVOID SPILLAGE. ANY SPILLS SHALL BE CONTAINED AND CLEANED UP IMMEDIATELY <br />IN ACCORDANCE WITH STATE AND LOCAL REQUIREMENTS. ALL FUELING VEHICLES <br />SHALL BE EQUIPPED WITH SPILL CLEANUP MATERIALS AND EQUIPMENT. <br />D. CONTRACTOR SHALL CONTROL AND PROPERLY DISPOSE OF ALL LIQUIDS DURING <br />SAWCUTTING ACTIVITIES <br />EROSION CONTROL NOTES: <br />1. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED PER THE STANDARD <br />CONSTRUCTION SPECIFICATIONS DATED OCTOBER 1997 AND THE EROSION AND <br />SEDIMENT CONTROL STANDARDS AND SPECIFICATIONS, LATEST REVISION. <br />WHERE DISCREPANCIES EXIST THE STANDARD DRAWINGS OF THE EROSION <br />AND SEDIMENT CONTROL STANDARDS AND SPECIFICATIONS SHALL SUPERSEDE <br />THE STANDARD DRAWINGS OF THE STANDARD CONSTRUCTION SPECIFICATIONS. <br />2. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED DURING <br />CONSTRUCTION BY THE CONTRACTOR PER THE EROSION AND SEDIMENT CONTROL <br />STANDARDS AND SPECIFICATIONS, LATEST REVISION. <br />3. DUST CONTROL SHALL BE PRACTICED PER THE GRADING ORDINANCE AND <br />STANDARD CONSTRUCTION SPECIFICATIONS, LATEST REVISION. <br />4. INLET FILTERS SHALL BE PLACED AROUND ALL DRAIN INLETS WHICH COULD RECEIVE <br />DRAINAGE IN UNPAVED AND PAVED AREAS DURING THE WET SEASON <br />(OCTOBER 1—APRIL 15). <br />5. STORM DRAIN INLET FILTERS PER ATTACHED DETAIL SHALL BE <br />PLACED ON ALL DRAIN INLETS AFTER COMPLETION OF PAVING AND SHALL <br />REMAIN IN PLACE ON A YEAR ROUND BASIS. FILTERS SHALL BE REMOVED BY <br />THE CONTRACTOR UPON ACCEPTANCE OF SUBDIVISION IMPROVEMENTS. <br />6. STABILIZED CONSTRUCTION SITE ACCESS SHALL BE CONSTRUCTED PER <br />ATTACHED DETAIL WHERE CONSTRUCTION TRAFFIC ENTERS OR LEAVES <br />PAVED AREAS. THE STABILIZED ACCESS SHALL REMAIN IN PLACE ON A YEAR <br />ROUND BASIS UNTIL COMPLETION OF CONSTRUCTION. <br />7. SENSITIVE AREAS AND AREAS UNDISTURBED BY GRADING SHALL BE PROTECTED <br />BY FILTER ROLL BARRIER AS SHOWN ON THE ROUGH GRADING PLAN AND <br />CONSTRUCTED PER ATTACHED DETAILS. FILTER ROLL BARRIER, OR APPROVED EQUAL, <br />SHALL REMAIN IN PLACE ON A YEAR ROUND BASIS. <br />8. FILTER ROLL, STRAW WATTLE BARRIER OR OTHER EROSION CONTROL MEASURES <br />BE CONSTRUCTED PER ATTACHED DETAILS, TO PROVIDE PROTECTION AT THE <br />PERIMETER OF THE PROJECT WHERE SHEET FLOW TYPE RUNOFF MAY DISCHARGE <br />TO ADJACENT PROPERTIES. STRAW ROLL, OR APPROVED EQUAL, SHALL REMAIN IN <br />PLACE ON A YEAR ROUND BASIS, <br />9. THE FIRST 18' BEHIND THE SIDEWALK ON LOT FRONT YARDS, THE FIRST 7.5' <br />BEHIND THE SIDEWALK ON STREET SIDEYARDS AND ALL SLOPES STEEPER <br />THAN 10:1 SHALL BE HYDROSEEDED WITH AN APPROVED SEED MIXTURE AFTER <br />COMPLETION OF CURB, GUTTER AND SIDEWALK AND JUST PRIOR TO THE RAINY <br />SEASON TO ALLOW MAXIMUM GROWTH OF HYDROSEEDED AREA. <br />GENERAL: <br />1. A CONSTRUCTION ENTRANCE SHALL BE INSTALLED PRIOR TO COMMENCEMENT OF GRADING. LOCATION OF <br />THE ENTRANCE MAY BE ADJUSTED BY THE CONTRACTOR TO FACILITATE GRADING OPERATIONS. ALL <br />CONSTRUCTION TRAFFIC ENTERING THE PAVED ROAD MUST CROSS THE CONSTRUCTION ENTRANCE. <br />2. CHANGES TO THIS EROSION AND SEDIMENT CONTROL PLAN TO MEET FIELD CONDITIONS SHALL BE MADE <br />ONLY WITH THE APPROVAL OF, OR AT THE DIRECTION OF THE CITY ENGINEER. DURING THE RAINY SEASON, <br />PUBLIC ROADWAY SHALL BE KEPT CLEAR OF EARTH MATERIAL AND DEBRIS. <br />THE SITE SHALL BE MAINTAINED SO THAT A MINIMUM OF SEDIMENT LADEN RUNOFF ENTERS THE STORM <br />DRAINAGE SYSTEM AND PUBLIC ROADWAY. THIS PLAN COVERS ONLY THE FIRST WINTER FOLLOWING <br />GRADING. PLANS SHALL BE RESUBMITTED FOR APPROVAL PRIOR TO SEPTEMBER IST OF EACH <br />SUBSEQUENT YEAR UNTIL THE PROPOSED IMPROVEMENTS ARE COMPLETED. <br />3. CONTROL MEASURES SHALL BE INSPECTED AND REPAIRED AT THE END OF EACH WORKING DAY AND, IN <br />ADDITION, AFTER EACH STORM. <br />0 <br />10, <br />INSTALL STRAW ROLL <br />AND AT BACK OF WALK O <br />Z <br />INSTALL GRAVEL BAGS <br />AND FILTER FABRICS <br />OO <br />Q <br />TO PROTECT ALL INLETS <br />OO OO <br />J <br />CL <br />(TYP ALL INLETS) <br />F— <br />INSTALL CONSTRUCTION <br />ENTRANCE PROTECTION <br />O <br />C <br />z <br />CONTRACTOR TO STABILIZE <br />THROUGH HYDROSEEDING <br />W <br />MLd <br />DISTURBED SOIL PRIOR TO <br />RAINY SEASON <br />INSTALL CONCRETE WASHOUT AREA IN <br />EL <br />LOCATIONS APPROVED BY A <br />CERTIFIED PROFESSIONAL O <br />IN EROSION & SEDIMENT CONTROL <br />J <br />INSTALL EQUIPMENT REFUEL <br />AND SERVICE AREA IN _ <br />LOCATIONS APPROVED BY A <br />CERTIFIED PROFESSIONAL - <br />IN EROSION & SEDIMENT CONTROL <br />M <br />GENERAL: <br />1. A CONSTRUCTION ENTRANCE SHALL BE INSTALLED PRIOR TO COMMENCEMENT OF GRADING. LOCATION OF <br />THE ENTRANCE MAY BE ADJUSTED BY THE CONTRACTOR TO FACILITATE GRADING OPERATIONS. ALL <br />CONSTRUCTION TRAFFIC ENTERING THE PAVED ROAD MUST CROSS THE CONSTRUCTION ENTRANCE. <br />2. CHANGES TO THIS EROSION AND SEDIMENT CONTROL PLAN TO MEET FIELD CONDITIONS SHALL BE MADE <br />ONLY WITH THE APPROVAL OF, OR AT THE DIRECTION OF THE CITY ENGINEER. DURING THE RAINY SEASON, <br />PUBLIC ROADWAY SHALL BE KEPT CLEAR OF EARTH MATERIAL AND DEBRIS. <br />THE SITE SHALL BE MAINTAINED SO THAT A MINIMUM OF SEDIMENT LADEN RUNOFF ENTERS THE STORM <br />DRAINAGE SYSTEM AND PUBLIC ROADWAY. THIS PLAN COVERS ONLY THE FIRST WINTER FOLLOWING <br />GRADING. PLANS SHALL BE RESUBMITTED FOR APPROVAL PRIOR TO SEPTEMBER IST OF EACH <br />SUBSEQUENT YEAR UNTIL THE PROPOSED IMPROVEMENTS ARE COMPLETED. <br />3. CONTROL MEASURES SHALL BE INSPECTED AND REPAIRED AT THE END OF EACH WORKING DAY AND, IN <br />ADDITION, AFTER EACH STORM. <br />0 <br />10, <br />U) <br />Z <br />Z <br />IU <br />\ <br />Q <br />STRU <br />N <br />U) <br />Z <br />Z <br />W <br />Q <br />J <br />CL <br />Q <br />F— <br />_V <br />C <br />z <br />0 <br />W <br />MLd <br />W <br />Z <br />EL <br />N <br />0of <br />N <br />J <br />Z <br />M <br />Z <br />N <br />o <br />U <br />O <br />W <br />W® <br />° <br />rn <br />o <br />Zm <br />M N <br />N <br />W <br />0.. .. <br />M <br />�z <br />M <br />� <br />m <br />N <br />C <br />Q <br />W <br />ogoo <br />a3_ <br />-o <br />N <br />Z <br />Z <br />Q <br />J <br />CL <br />Q <br />F— <br />~N <br />C <br />z <br />0 <br />W <br />MLd <br />CL <br />C <br />Z <br />EL <br />0of <br />N <br />J <br />U <br />M <br />Design <br />AMC <br />Check <br />AMC <br />Date <br />12/02/03 <br />Scale <br />1" = 100' <br />Original Drawing Scale <br />- 0Lw L�w�I <br />Sheet Number <br />1 Of 2 <br />Project File No. <br />
The URL can be used to link to this page
Your browser does not support the video tag.