Laserfiche WebLink
1 <br />m <br />IYl" <br />TOILET ROOM <br />SCALE: 1/4" = 1'-0" <br />PLUMBING FLOOR PLAN <br />SGA -E: 1/8"=1'-O" <br />SHEET NOTES <br />IO FURNISH AND INSTALL NEW WATER CLOSET AND CONNECT TO <br />PIPING. <br />O2 FURNISH AND INSTALL LAVATORY AND CONNECT TO PIPING. <br />O3 FURNI5H AND INSTALL URINAL AND CONNECT TO PIPING. <br />OFURNISH AND INSTALL FLOOR DRAIN. <br />O FURNISH AND INSTALL ADA COMPLIANT SHOWER FIXUTRE. <br />CONNECT TO PIPING. <br />O8 FURNISH AND INSTALL EMERGENCY SHOWER/EYEWASN. CONNECT <br />TO PIPING. <br />O FURNISH AND INSTALL H05E BIBS W/VACUUM BREAKER. <br />O FURNISH AND INSTALL ELECTRIC. WATER HEATER ABOVE <br />RE5TROOM. COORDINATE WITH ELECTRICAL. SEE DETAIL 5/P3.1 <br />OFLIRNI5H AND INSTALL WATER HAMMER ARRESTORS WITH <br />ACCE55 PANEL BETWEEN LAST TWO FIXTURES ON EACH BRANCH. <br />10 FURNISH AND INSTALL WATER HEATER T4P DRAIN. TERMINATE <br />AT BUILDING EXTERIOR WITH DOWNTURNED ELBOW 8" ABOVE <br />GRADE. VERIFY LOCATION. <br />II PIPING ABOVE CEILING AND BELOW MEZZANINE, TYP. <br />12 SEE PLUMBING FLOOR PLAN FOR CONTINUATION. <br />13 FIRE SPRINKLER WATER SUPPLY. SEE CIVIL DRAWING5. <br />14 R15ER PIPING TO WATER HEATER ABOVE. <br />IS WATER SUPPLY TO BUILDING W/SOV, SEE CIVIL DRAWING5. <br />Ib SEE CIVIL DRAWINGS FOR CONTINUATION. <br />11 FURNISH AND INSTALL WASTE PIPING TO SUMP FROM TRENCH <br />DRAIN, BY OTHERS, TVP. COORDINATE CONNECTION. <br />18 PIPING UP A5 HIGH AS POSSIBLE, TVP. <br />19 PIPING BELOW GRADE, TYP. <br />® FURNISH AND INSTALL THERMOSTATIC MIXING VALVE AT <br />EMERGENCY 514OWER/EYEWA51-1. <br />21 FURNISH AND INSTALL HOT WATER CIRCULATING PUMP, TIMER <br />AND AQUA5TAT. COORDINATE WITH ELECTRICAL. <br />Q FURNISH AND INSTALL AIR ELIMINATOR WITH DRAIN AND <br />SHUT-OFF VALVE AT HIGH POINT OF HWR PIPING. TERMINATE <br />VENT DRAIN TO NEAREST TRENCH DRAIN. <br />O FURNISH AND INSTALL ALARM LIGHT AND SIGNAL AT EXTERIOR <br />EMERGENCY SHOWER. COODINATE WITH ELECTRICAL. <br />?4 HNR DOWN TO PUMP AND WATER HEATER. <br />O COMBINE PLUMBING VENTS IN WALL AND RUN FULL 51ZE 2" VENT <br />TO ROOF. SEE MEZZANINE FLOOR PLAN. <br />�A <br />MEZZANINE FLC <br />26 VENT PIPING ABOVE CEILING. <br />21 FIRE SPRINKLER RISER. SEE DETAIL 1/P3.1 <br />OH FURNISH AND INSTALL COMPRE55ED AIR (CA) PIPING AND <br />CONNECT THROUGH FULL PORT BALL VALVE TO AIR <br />COMPRESSOR BY OTHERS. <br />29 GA PIPE RISER ON WALL. <br />® GA PIPE AS HIGH AS POSSIBLE. <br />31 GA PIPE RISER DOWN TO AIR OUTLET. CONFIRM HE164T AND <br />LOCATION, TYP.-5. <br />32 FURNISH AND INSTALL FULL PORT BALL VALVE AND QUICK <br />D15CONNECT (OD), TYP.-5. <br />33 FURNISH AND INSTALL FULL PORT BALL VALVE, GAP PIPE STUB <br />FOR FUTURE CONNECTION. <br />O CONNECT GA PIPING TO CAN CRUSHER W/SOV. COORDINATE <br />CONNECTION LOCATION WITH INSTALLING CONTRACTOR. <br />OPIPING TIGHT TO WALL, TYP. <br />OGA PIPING ON TOP OF INTERIOR ROOM. <br />31 TERMINATE FLOOR DRAIN TO SUMP. <br />O FURNISH AND INSTALL TRAP PRIMER TO FLOOR DRAIN. <br />PLAN <br />O FURNISH AND INSTALL 3/4" DRAIN FROM WATER HEATER <br />OVERFLOW PAN. TERMINATE ADJACENT TO T4P RELIEF PIPE. <br />® FURNISH AND INSTALL PRESSURE REDUCING VALVE SET TO 50 <br />PSI. <br />8z5 S� eVp o <br />sui( C <br />sane Ron OR 95404 <br />T& (707)544-07&{ <br />Fan (707)544-0866 <br />0 Cdprght 2002 <br />rn�; i nc'c' ry <br />I I Wt Mendocino Avenue <br />Santa Rosa. CA 95401 <br />707-546-1332 <br />WN(fax) 707-546-5733 <br />.hornangia.a,s.com <br />a <br />N <br />D <br />Q <br />e <br />don No: <br />01-847/155 <br />Draw" By: <br />TS/JN/DL' <br />Checked By: <br />JH/EM <br />Data: <br />JULY 3, 2002 <br />Sheat Namca, <br />P2.1 <br />2 of 3 <br />