Laserfiche WebLink
09 <br />W <br />N <br />�l <br />GENERAL NOTES <br />I. SEE SPECIFICATION SECTION 15400 FOR MATERIAL AND FIXTURE DESCRIPTIONS. <br />2. ALL PLUMBING WORK SHALL BE IN FULL ACCORDANCE WITH ALL APPLICABLE STATE <br />AND LOCAL GODES AND ORDINANCES. <br />3. THE DRAWING5 ARE DIAGRAMMATIC AND ARE INTENDED A5 A GUIDE FOR THE <br />COMPLETE INSTALLATION. THE PLUMBING CONTRACTOR SHALL INSTALL ALL PIPING TO <br />BEST SUIT FIELD 0ONDITION5. <br />4. ALL PIPING SHALL BE RUN TO AVOID ARCHITECTURAL OPENINGS, STRUCTURAL MEMBERS, <br />FIXTURES AND OTHER OBSTRUCTIONS. RUN PIPING CONGEALED WHEREVER POSSIBLE IN <br />PARTITIONS, WALLS, FURRED SPACE -5, OR BELOW FLOORS UNLE55 OTHERWISE NOTED OR <br />INDICATED ON PLANS. PIPING SHALL MAINTAIN A Is MINIMUM CLEARANCE FROM ALL <br />COMBUSTIBLE CONSTRUCTION. <br />5. REFER TO ARCHITECTURAL DRAWING5 FOR EXACT LOCATIONS AND MOUNTING HEIGHTS <br />OF ALL PLUMBING FIXTURES AND ASSOCIATED AGGE55ORIE5. <br />6. INSTALL ALL PIPING WITH AMPLE PROVISION FOR E-XPAN51ON AND CONTRACTION. <br />T. PROVIDE ALL TRIM NECESSARY FOR THE COMPLETE INSTALLATION OF ALL FIXTURES <br />AND EQUIPMENT. <br />8. PROVIDE ACCESS PANELS FOR ALL SHUT-OFF VALVES, TRAP PRIMERS AND WATER <br />HAMMER ARRESTORS LOCATED WITHIN WALLS OR ABOVE FINISHED CEILINGS. <br />COORDINATE EXACT LOCATIONS OF ALL PANELS WITH ARCHITECT. <br />q. ALL VALVES SHALL BE LINE 51ZE UNLESS NOTED OTHERWISE. <br />10. GANG FIXTURE VENT5 WHERE POSSIBLE IN ORDER TO MINIMIZE NUMBER OF ROOF <br />PENETRATIONS. ALL VENT5 THROUGH ROOF MUST TERMINATE NOT LESS THAN 10 FEET <br />FROM OUTDOOR AIR INTAKES AT MECHANICAL UNITS. <br />II. REMOVE ABANDONED PIPING IN AREAS OF RENOVATION WHERE ACCESSIBLE. <br />12. FIELD VERIFY ALL EXISTING PLUMBING VENTS TO BE REUSED PRIOR TO COMMENCING <br />WORK. NOTIFY THE ARCHITECT IN WRITING OF ANY EXISTING C4)NDITION5 WHICH WOULD <br />PRECLUDE THE USE OF ANY EXISTING VENT DESIGNATED FOR REUSE ON THE DRAWINGS. <br />13. STUD PARTITIONS CONTAINING PLUMBING, HEATING, OR OTTER PIPES SHALL BE 50 <br />FRAMED AND THE JOISTS UNDERNEATH 50 SPACED AS TO GIVE PROPER CLEARANCE <br />FOR THE PIPING. HHERE A PARTITION CONTAINING SUCH PIPING RUNS PARALLEL TO THE <br />FLOOR JOISTS, THE JOISTS UNDERNEATH SUCH PARTITIONS SHALL BE DOUBLED AND <br />SPACED TO PERMIT THE PASSAGE OF SUCH PIPES AND SHALL BE BRIDGED. NOTCHES <br />SHALL NOT BE PLACED IN STUDS UNLESS FULLY DETAILED ON THE APPROVED PLANS TO <br />RESTORE THE STRUCTURAL RESISTANCE OF THE MEMBER. ALL 5PLICE5 IN STUDS OR <br />PLATES WHICH ARE REQUIRED TO RE515T LOADS SHALL BE DESIGNED AND FULLY <br />DETAILED ON THE APPROVED DRAWINGS. (5. 5. DJ. ANY CUTTING AND NOTCHING <br />SHALL BE DETAILED ON THE APPROVED PLANS. <br />14. HOLES EXCEEDING ONE THIRD OF THE WIDTH OF THE MEMBER BEING PENETRATED SHALL <br />NOT BE PLACED IN STUDS LWLE55 FULLY DETAILED ON THE APPROVED PLAN5. HOLE5 <br />NOT EXCEEDING ONE THIRD OF THE 5TUD WIDTH SHALL BE NEATLY BORED AND SHALL <br />BE LOCATED IN THE CENTER OF THE MEMBER BEING PENETRATED. <br />SEISMIC RESTRAINT NOTES <br />ALL MECHANICAL COMPONENTS SHALL BE INSTALLED IN ACCORDANCE WITH <br />THE CALIFORNIA BUILDING CODE (IggO), SECTION 1632A — "LATERAL FORGE ON <br />ELEMENTS OF 5TRUGTURES,NON—STRUCTURAL COMPONENTS AND EQUIPMENT <br />SUPPORTED BY STRUCTURES," <br />ALL MECHANICAL COMPONENTS SHALL RESIST THE EFFECTS OF SEISMIC FORGES <br />FOR ZONE 4 AND AS MODIFIED BY THE NEAR SOURCE FACTOR. <br />HVAC DUCTWORK AND PIPING 5Y5TEM5 <br />ALL PIPES AND DUCTS SHALL BE BRACED TO RE515T THE FORGES PRESCRIBED IN <br />GBG SECTION 1630A.2 AND SECTION 1632A.6. <br />DUCTWORK SHALL BE GONSTRUGTED IN ACCORDANCE WITH PROVISIONS CONTAINED <br />IN PART 4, TITLE 24, CALIFORNIA MECHANICAL CODE. <br />PIPING GONSTRUCTED OF NON -DUCTILE MATERIALS SHALL HAVE THE BRACE SPACING <br />REDUCED TO ONE-HALF OF THE SPAGIN6 ALLOWED FOR DUCTILE MATERIALS, IN <br />AGGORDANGE KITH GBG SECTION 1630A.5. <br />EXCEPTIONS, <br />I. FUEL PIPING LESS THAN I INCH INSIDE DIAMETER. <br />2. NON-MEDICAL GAS PIPING LESS THAN 2.5 INCHES INSIDE DIAMETER, OR PIPING <br />SUSPENDED BY INDIVIDUAL HANGERS 12 INCHES OR LE55 IN LENGTH FROM THE <br />TOP OF THE PIPE TO THE BOTTOM OF THE 5TR4'GTURAL SUPPORT FOR THE HANGER. <br />3. RECTANGULAR AIR -HANDLING DUGT5 LE -55 THAN 6 5QUARE FOOT IN CROSS- <br />SECTIONAL AREA, OR ROUND AIR -HANDLING DUCTS LESS THAN 28 INCHES IN <br />DIAMETER, OR DUCT5 SUSPENDED BY HANGER5 12 INCHES OR LE55 IN LENGTH <br />FROM THE TOP OF THE DUCT TO THE BOTTOM OF THE STRUCTURAL SUPPORT <br />FOR THE HANGER, <br />PLUMBING LEGEND <br />SYMBOL <br />ABBREVIATION 4 DESCRIPTION <br />--- <br />GW <br />DOMESTIC, COLD WATER PIPING <br />PENT <br />GD <br />CONDENSATE DRAIN PIPING <br />EMERGENCY SHOWER/EYEWASH <br />114'. <br />PIPE DOWN <br />—O <br />UP <br />PIPE UP <br />---- <br />HW <br />DOMESTIC HOT WATER PIPING <br />----- <br />HWR <br />DOMESTIC HOT WATER RETURN PIPING <br />—G— <br />G <br />GAS PIPING (LON PRE55URF-) <br />3/4" <br />OFD <br />OVERFLOW DRAIN <br />- <br />RD <br />ROOF DRAIN <br />RAIN WATER LEADER PIPING <br />-- <br />SD <br />STORM DRAIN PIPING <br />- — - <br />V <br />VENT PIPING <br />0 <br />VTR <br />VENT THRU ROOF <br />TRAP PRIMER <br />55, W <br />SANITARY SEWER, WASTE PIPING (AF(5) <br />I/2" <br />55, H <br />SANITARY SEWER, WASTE PIPING N6) <br />— <br />PA <br />PIPING ANCHOR <br />0 <br />POG <br />POINT OF CONNECTION <br />�— <br />PGO <br />FLOOR GLEAN OUT <br />�— <br />GOTG <br />GLEAN OUT TO GRADE <br />—iH <br />HB <br />HOSE B15B <br />—� <br />WHA <br />WATER HAMMER ARRESTOR <br />3/4" <br />- <br />UNION <br />1-1/2" <br />KILL -MOUNTED <br />WALL GLEAN OUT <br />GFF <br />PIPING GAP (GAPPED FOR FUTURE) <br />IbI <br />BV <br />BALL VALVE <br />IOU <br />GG <br />BALANCING VALVE <br />IV <br />GKV <br />CHECK VALVE <br />--IVH. <br />GC <br />GAS C.OGK <br />Da <br />GV <br />GATE VALVE <br />04 <br />PRV <br />PRESSURE REGULATOR VALVE <br />r <br />PG <br />PRE55L RE GAUGE <br />-� <br />SOV <br />SHUT OFF VALVE IN VALVE BOX <br />STIR <br />STRAINER <br />TH <br />THERMOMETER <br />® <br />P <br />PUMP <br />CDC <br />RPBP <br />REDUCED PRESSURE BACKFLOW PREVENTER <br />® <br />FG <br />FLEXIBLE CONNECTION <br />DV <br />DRAIN VALVE <br />�— <br />DIRECTION OF FLON <br />PRLV <br />PRESSURE RELIEF VALVE <br />MV <br />MIXING VALVE <br />• <br />FD <br />FLOOR DRAIN <br />® <br />FS <br />FLOOR SINK <br />—M6— <br />MG <br />6A5 PIPING (MEDIUM PRESSURE) <br />-� <br />SLOPE PIPING IN DIRECTION OF ARROW <br />TRAP PRIMER VALVE <br />AFC <br />ABOVE FINISHED CEILING <br />AFF <br />ABOVE FINISHED FLOOR <br />AFC, <br />ABOVE FINISHED GRADE <br />AP <br />AOCE55 PANEL <br />BF <br />BELOW FLOOR <br /><GTE> <br />CONNECT TO EXISTING <br />GFH <br />OUBIG FEET PER HOUR <br />iE) <br />EXISTING <br />MI <br />NEW <br />NIG <br />NOT IN CONTRACT <br />Uri <br />UNDERGROUND <br />S.G.D. <br />SEE CIVIL DRAWINGS <br />5.5.D. <br />SEE STRUCTURAL DRAWIN66-5 <br />S.A.D. <br />SEE ARCHITECTURAL DRAWINGS <br />S -MD <br />SEE MECHANICAL DRAWINGS <br />HAZARDOUS MATERIALS NOTE <br />IF DURING THE COURSE OF THIS WORK THE CONTRACTOR OBSERVES THE EXISTENCE <br />OF HAZARDOUS MATERIALS, THE CONTRACTOR SHALL IMMEDIATELY TERMINATE <br />FURTHER WORK IN THAT AREA AND NOTIFY THE OWNER OF THE CONDITION. THE <br />OWNER WILL, AFTER CONSULTATION WITH THE ARCHITECT OR ENGINEER DETERMINE <br />FURTHER COURSE OF ACTION. <br />PLUMBING FIXTURE CONNECTION SCHEDULE <br />TAG <br />DESCRIPTION <br />COLD <br />WATER <br />HOT <br />WATER <br />DRAIN <br />/WASTE <br />PENT <br />NOTES <br />E5 -I <br />EMERGENCY SHOWER/EYEWASH <br />114'. <br />- <br />_ <br />_ <br />ADA COMPLIANT <br />30 GALLONS; 4500K 18 GPH RECOVERY AT 100 F. <br />206VAG, I PHASE <br />350 <br />W/FLOOR DRAIN <br />HB -I <br />H05E BIBB <br />3/4" <br />- <br />- <br />- <br />HALL <br />MI'WAGU <br />20 <br />BREAKER <br />FD -I <br />FLOOR DRAIN <br />I/2" <br />- <br />3" <br />1-1/2" <br />TRAP PRIMER <br />L -I <br />LAVATORY <br />I/2" <br />1/2" <br />2" <br />-I/2" <br />LLBARRMO <br />EE <br />PP <br />1 GPM • 5 FT HD <br />0.43A, 115V, 1/40 HP <br />10 <br />SH -I <br />SHOWER FIXTURE, ADA (SEE DETAIL 2/A4) <br />I/2" <br />I/2" <br />- <br />- <br />BARRIER FREE <br />U -I <br />URINAL <br />3/4" <br />- <br />2" <br />1-1/2" <br />KILL -MOUNTED <br />BARRIER -FREE <br />WATER CLOSET <br />1" <br />- <br />4" <br />2" <br />Fp <br />FLUOO - UNT <br />ADA <br />NUTE5. <br />I. SEE PLUMBING LIST IN SPECIFICATION SECTION 15400 <br />2. SEE ARCHITEGTIR4L DRAWING5 FOR FIXTURE MOUNTING HEIGHTS. <br />3. FLL15H VALVE HANDLE ON WIDE 5112E OF STALL <br />PLUMBING EQUIPMENT SCHEDULE <br />TAG <br />MAKE 4 MODEL <br />DESCRIPTION <br />Revisions <br />By <br />WT. <br />A.D. SMITH <br />ELECTRIC 5TORA6E WATER HEATER <br />_I <br />DEL -30 <br />30 GALLONS; 4500K 18 GPH RECOVERY AT 100 F. <br />206VAG, I PHASE <br />350 <br />A.O. SMITH <br />EXPANSION TANK. <br />ET -I <br />V_5E <br />2 GALLON <br />20 <br />THERM05TATIC MIXING VALVE <br />TV -I <br />4220 <br />EMERGENCY SHOWER <br />15 <br />P <br />HW GIRGULATION RUMP W/AgUA5TAT <br />-I <br />PP <br />1 GPM • 5 FT HD <br />0.43A, 115V, 1/40 HP <br />10 <br />A <br />HAWS <br />EMERGENCY ALARM SYSTEM <br />-I <br />gOOI <br />12OVAC/1/60 <br />I5 <br />825 Si mtoa Av m <br />Suite C <br />Sane Rues Ca 95904 <br />Tel, (707)5444784 <br />p� (707) 544-0966 <br />© Copyright 2002 <br />H <br />eng o ee <br />521 Mendocino Avenue <br />Santa Rosa, CA 95401 <br />707-546-1332 <br />(fax) 707-546-5733 <br />www.hornengineers.com <br />W <br />J <br />D <br />W <br />W <br />� U <br />Isla. <br />Cn <br />Q <br />LU <br />Z YJ <br />G Q <br />J <br />i � 4Z� <br />2 W <br />Job No: <br />Drown By. <br />Cheo"ee ey: <br />Dote: <br />01-847/155 <br />TS/JN/DB <br />JH/EM <br />JULY 3, 2002 <br />Revisions <br />By <br />Sheet Number <br />P1.1 <br />\ nr 3 <br />