Laserfiche WebLink
r <br />M <br />D <br />W <br />DRAWING INDEX <br />GENERAL DRAWINGS <br />G1 TITLE SHEET <br />G2 NOTES, LEGEND & SHEET INDEX <br />EC TITLE 24 ENERGY COMPLIANCE FORMS <br />CIVIL DRAWINGS <br />C1 PLOT PLAN <br />C2 SITE PLAN <br />C3 GRADING, DRAINAGE PLAN & UTILITY PLAN <br />C4 CONSTRUCTION DETAILS <br />C5 COUNTY CONSTRUCTION DETAILS <br />C6 COUNTY CONSTRUCTION DETAILS <br />C7 EROSION CONTROL PLAN <br />L1 PLANTING PLAN <br />L2 IRRIGATION PLAN <br />L3 PLANTING & IRRIGATION DETAILS <br />ARCHITECTURAL DRAWINGS <br />Al FLOOR PLAN, MEZZANINE PLAN <br />A2 ROOM FINISH, DOOR & HARDWARE SHCEDULE <br />A3 ROOF PLAN, REFLECTED CIELING PLAN <br />A4 ENLARGED TOILET ROOM PLAN, INTERIOR ELEVATIONS <br />A5 EXTERIOR ELEVATIONS <br />AS BUILDING SECTIONS <br />A7 WALL SECTIONS <br />A8 SECTIONS & DETAILS <br />Ag STAIR SECTIONS & DETAILS <br />STRUCTURAL DRAWINGS <br />S1 FOUNDATION PLAN <br />S2 SECOND FLOOR FRAMING & CEILING PLAN <br />S3 ROOF FRAMING PLAN <br />S4 CONCRETE BLOCK REINFORCING <br />S5 FOUNDATION DETAILS <br />S6 MISCELLANEOUS DETAILS <br />S7 ROOF FRAMING DETAILS <br />S8 STEEL FRAME DETAILS <br />MECHANICAL/PLUMBING DRAWINGS <br />M1.1 MECHANICAL LEGEND, NOTES, ABBREVIATIONS & SYMBOLS <br />M1.2 MECHANICAL LEGEND, NOTES, ABBREVIATIONS & SYMBOLS <br />M2.1 MECHANICAL FLOOR PLANS <br />M3.1 MECHANICAL DETAILS <br />P1.1 PLUMBING LEGEND, NOTES, FIXTURE CONNECTION <br />SCHEDULE & EQUIPMENT SCHEDULE <br />P2.1 PLUMBING FLOOR PLANS <br />P3.1 PLUMBING DETAILS <br />GENERAL NOTES <br />1. No guarantee is intended that underground obstructions, not shown on the plans, may not be encountered. <br />Those shown are based upon the best information available and the contractor is cautioned that the owner <br />and the Engineers assume no responsibility for any obstruction either shown or not shown on these plans. <br />2. Underground Service Alert (U.S.A.) - call toll free 800-227-2600 at least two working days prior to <br />excavation. <br />3. All construction and materials shall be specified and as required by the 1997 Edition of the U.B.C., State and <br />Loco] Codes and Authorities. The work shall be done in accordance with applicable laws, Local Ordinances, <br />Permits and the Contract Documents. <br />4. Contractor shall be responsible for the accurate placement of the building on the site. <br />5. Construction contractor agrees that in accordance with generally accepted construction practices, construction <br />contractor will be required to assume sole and complete responsibility for job site conditions during the <br />course of construction of the project, including safety of all persons and property. That this requirement <br />shall be made to apply continuously and not be limited to normal working hours, and construction contractor <br />further agrees to hold harmless, indemnify and defend the owner, the engineer and his consultants, and each <br />of their officers, employees, and agents. <br />6. The contractor shall secure a trench permit from the California Division of Industrial Safety prior to the <br />excavation of any trench five feet in depth or greater. <br />7. Contractor shall uncover existing buried utilities with utility owner to verify locations and elevations of utilities. <br />Buried utilities include but are not limited to water mains, sewer lines, storm drains, gas mains and laterals, <br />electrical distribution lines and telephone lines. It shall be the contractor's responsibility to notify the owner <br />of utilities conflicting with the proposed construction. <br />8. Benchmarks: Vertical Datum 24.90 per Plague in concrete footing of the Southerly Radar support. <br />Horizontal control based on (2) crosses scribed into the top of curb (CP1 & CP2), see plan. <br />9. Distance and invert grades of storm drain and sanitary sewer are to the center line of inlets, catch basins <br />and manholes - distances are horizontal. <br />10. The contractor shall check and verify all dimensions and existing conditions before laying out the work and <br />notify the engineer of any discrepancies before starting work. He shall be responsible for any errors resulting <br />from his failure to do so. <br />11. Dimensions take precedence over scale, do not scale drawings. All dimensions are to face of curbs and <br />concrete, unless otherwise noted. <br />12. Contractor shall provide dust control measures at all times during construction as per Section 10 of the <br />Standard Specifications of the State of California and per City of Stockton requirements. <br />13. All earthwork and site grading shall be in accordance with the recommendations contained in the Geotechnical <br />Investigation for this project as prepared by Kleinfelder dated March 22, 2002, and any further recommendations <br />of the project soil engineer. <br />14. Excess soil, if any is to be removed from the site by the Contractor. <br />15. All pads to be constructed to tolerance of plus or minus 0.1 foot from planned pad elevation. <br />16. The Household Hazardous Waste Facility shall include sprinklers for fire suppression as required by the Uniform Fire Code. <br />Contractor shall submit sprinkler system design to the San Joaquin County Fire Protection Bureau <br />for review and approval, secure permits and pay fees. <br />17. e Contractor shall apply and s cure a Grading Permit from Ihe on Joaquin County Department of Planning and <br />Building Inspection. Plan check and inspection fees will be paid by the County. See Sheet C2 for the estimated <br />earthwork quantities. <br />18. Inspections: <br />A. In addition to inspections that may be required by the San Joaquin County Department of Planning and Building <br />Inspection, the Contractor shall coordinate and call for the Soils Engineer to inspect and confirm the adequacy of <br />the soil pad preparation, the foundation excavations plus the placement and compaction of fill material. Refer to <br />the Geotechnical Investigation for specific requirements. <br />B. Special Inspections are required for this project. The Owner shall retain these inspectors, however, the Contractor <br />shall coordinate these inspections. Special Inspections shall be performed per UBC Sections 106 and 1701 and per <br />the Special Inspection Agreement for this project and are required for the following: <br />1. Concrete: During the taking of the test specimens and placing of reinforced concrete with compressive <br />strength of 3,000 psi. <br />2. Reinforcing Steel: During placing of reinforcing steel for all concrete required to have special inspection by <br />Item 1. <br />3. Structural Welding: During the welding of any member or connection which is designed to resist loads and <br />forces required by this code. <br />4. Structural Masonry. For fully grouted open-end hollow -unit masonry during preparation and taking of any <br />required prisms or test specimens, at the start of loying units, after the placement of reinforcing steel, grout <br />space prior to each grouting iperations, and during all grouting operations. <br />5. Epoxy Secured Dowels and Anchors (if needed): The inspector shall include a check of the hole iGe arid <br />cleanliness and epoxy material being used. <br />n _ <br />ABBREVIATIONS <br />0-A01=841ASITE-PI AN20. d%gq NOTES - G2 52/13/02 09.02.45 AM <br />LEGEND <br />® CATCH BASIN <br />0 DRAINAGE INLET <br />D5. DOWNSPOUT (ROOF DRAINAGE) <br />❑ WATER METER <br />• WATER VALVE <br />19 FIRE HYDRANT <br />0 GAS METER <br />A GAS METER <br />OC.O. SEWER CLEANOUT <br />OM.H. MANHOLE <br />O POWER POLE <br />❑ JOINT POLE <br />OS.P. SERVICE POLE <br />OG.P. GUY POLE <br />O-p,IIF LIGHT STANDARD <br />`&T.P. TELEPHONE POLE <br />• 1 MARKER OR DELINEATOR <br />O� HOSE BIB <br />GATE VALVE <br />(T) TEMPERED GLAZING <br />I ROOM NUMBER <br />Z FINISH GROUP <br />A DOOR TYPE <br />I HARDWARE GROUP <br />OI EXTERIOR FINISH GROUP <br />INTERIOR ELEVATION KEY <br />I SHEET <br />4 ELEVATION NUMBER <br />DETAIL NUMBER <br />AI SHEET NUMBER <br />SECTION NUMBER <br />SHEET NUMBER <br />CONSULTANT LIST: <br />CIVIL ENGINEER <br />EBA Engineeering <br />825 Sonoma Avenue <br />Suite C <br />Santa Rosa, CA 95404 <br />Tel: 707 / 544-0784 <br />Fax: 707 / 544-0866 <br />A R C H I T E C T <br />Roger Wilson <br />1250 Addison Street, # 104 <br />Suite 104 <br />Berkeley, CA 94702 <br />Tel: 510 / 649-8003 <br />Fax: 510 / 649-8151 <br />STRUCTURAL ENGINEER <br />Kenneth R. Hughes <br />3620 Mt. Diablo Blvd., #203 <br />Lafayette, California 94702 <br />Tel: 925 / 284-2808 <br />Fax: 925 / 284-7492 <br />PROJECT DATA <br />ELECTRICAL ENGINEER <br />Bruce Wishard <br />437 Carrillo Street <br />Santa Rosa, California 95401 <br />Tel: 707 / 526-0606 <br />Fax: 707 / 526-0607 <br />MECHANICAL ENGINEER <br />Horn Engineering <br />521 Mendocino Avenue <br />Santa Rosa, California 95407 <br />Tel: 707 / 546-1332 <br />Fax: (707 / 546-5733) <br />GEOTECHNICAL ENGINEER <br />Klienfelder, Inc. <br />2825 East Myrtle Street <br />Stockton, California 95205 <br />Tel: 209 / 948-1345 <br />Fax: (209 / 948-0621) <br />AGG <br />AGGREGATE <br />FG <br />FINISH GRADE <br />POC <br />POINT OF CONNECTION <br />ELECTRICAL DRAWINGS <br />H3 <br />Be <br />BEGINNING OF CURB <br />FIN <br />FINISH LAYER <br />PVC <br />POLYVINYL CHLORIDE <br />STORAGE <br />S1 <br />CMP <br />CORRUGATED METAL PIPE <br />FL <br />FLOW LINE <br />R <br />RADIUS <br />E1 ELECTRICAL SITE PLAN <br />a <br />3 <br />06 4- <br />rN <br />4 <br />Z 11 <br />COMP <br />COMPACTION <br />FND <br />FOUNDATION <br />RCP <br />REINFORCED CONCRETE PIPE <br />E2 ELECTRICAL FLOOR PLAN, PANEL SCHEDULE <br />By <br />DIA <br />DIAMETER <br />INV <br />INVERT <br />SCH <br />SCHEDULE <br />& SINGLE LINE DIAGRAM <br />III -N <br />DF <br />DOUGLAS FIR <br />L <br />LENGTH <br />SO <br />STORM DRAIN <br />BUILDING AREA <br />EA <br />EACH <br />MAX <br />MAXIMUM <br />SS <br />SANITARY SEWER <br />MEZZANINES <br />1,148 SF <br />EC <br />END OF CURVE <br />MIN <br />MINIMUM <br />TC <br />TOP OF CURB <br />TOTAL <br />8,858 SF <br />ELEV <br />ELEVATION <br />NO <br />NUMBER <br />TYP <br />TYPICAL <br />H-2 MIXING ROOM <br />193 SF <br />EX <br />EXISTING <br />NTS <br />NOT TO SCALE <br />VC <br />VERTICAL CURVE <br />266 SF <br />FF <br />FINISH FLOOR <br />2,268 SF <br />B OFFICE <br />0-A01=841ASITE-PI AN20. d%gq NOTES - G2 52/13/02 09.02.45 AM <br />LEGEND <br />® CATCH BASIN <br />0 DRAINAGE INLET <br />D5. DOWNSPOUT (ROOF DRAINAGE) <br />❑ WATER METER <br />• WATER VALVE <br />19 FIRE HYDRANT <br />0 GAS METER <br />A GAS METER <br />OC.O. SEWER CLEANOUT <br />OM.H. MANHOLE <br />O POWER POLE <br />❑ JOINT POLE <br />OS.P. SERVICE POLE <br />OG.P. GUY POLE <br />O-p,IIF LIGHT STANDARD <br />`&T.P. TELEPHONE POLE <br />• 1 MARKER OR DELINEATOR <br />O� HOSE BIB <br />GATE VALVE <br />(T) TEMPERED GLAZING <br />I ROOM NUMBER <br />Z FINISH GROUP <br />A DOOR TYPE <br />I HARDWARE GROUP <br />OI EXTERIOR FINISH GROUP <br />INTERIOR ELEVATION KEY <br />I SHEET <br />4 ELEVATION NUMBER <br />DETAIL NUMBER <br />AI SHEET NUMBER <br />SECTION NUMBER <br />SHEET NUMBER <br />CONSULTANT LIST: <br />CIVIL ENGINEER <br />EBA Engineeering <br />825 Sonoma Avenue <br />Suite C <br />Santa Rosa, CA 95404 <br />Tel: 707 / 544-0784 <br />Fax: 707 / 544-0866 <br />A R C H I T E C T <br />Roger Wilson <br />1250 Addison Street, # 104 <br />Suite 104 <br />Berkeley, CA 94702 <br />Tel: 510 / 649-8003 <br />Fax: 510 / 649-8151 <br />STRUCTURAL ENGINEER <br />Kenneth R. Hughes <br />3620 Mt. Diablo Blvd., #203 <br />Lafayette, California 94702 <br />Tel: 925 / 284-2808 <br />Fax: 925 / 284-7492 <br />PROJECT DATA <br />ELECTRICAL ENGINEER <br />Bruce Wishard <br />437 Carrillo Street <br />Santa Rosa, California 95401 <br />Tel: 707 / 526-0606 <br />Fax: 707 / 526-0607 <br />MECHANICAL ENGINEER <br />Horn Engineering <br />521 Mendocino Avenue <br />Santa Rosa, California 95407 <br />Tel: 707 / 546-1332 <br />Fax: (707 / 546-5733) <br />GEOTECHNICAL ENGINEER <br />Klienfelder, Inc. <br />2825 East Myrtle Street <br />Stockton, California 95205 <br />Tel: 209 / 948-1345 <br />Fax: (209 / 948-0621) <br />HOUSEHOLD HAZARDOUS WASTE FACILITY <br />OCCUPANCY <br />maAnoas <br />8"0 <br />MIXING ROOM <br />H2 <br />!ti 0 5444M <br />CANOPIES & STRORAGE <br />H3 <br />y <br />e. 30M ; <br />REUSE ROOM <br />M <br />STORAGE <br />S1 <br />No..S0m <br />FW43,1-4 <br />'rx CML <br />V of o:a�TO`I/4roi <br />OFFICE <br />8 <br />OCCUPANCY SEPARATIONS <br />a <br />3 <br />06 4- <br />rN <br />4 <br />Z 11 <br />Job No: 01-841 <br />H3//B <br />2 HOURS <br />oo<n SEPT. 03, 2002 <br />MIXING ROOM (112) <br />By <br />I <br />( <br />Ir EE l- <br />2 HOURS <br />m00A <br />TYPE OF CONSTRUCTION <br />III -N <br />HOUSEHOLD HAZARDOUS WASTE FACILITY <br />OCCUPANCY <br />maAnoas <br />8"0 <br />MIXING ROOM <br />H2 <br />!ti 0 5444M <br />CANOPIES & STRORAGE <br />H3 <br />y <br />e. 30M ; <br />REUSE ROOM <br />M <br />STORAGE <br />S1 <br />No..S0m <br />FW43,1-4 <br />'rx CML <br />V of o:a�TO`I/4roi <br />OFFICE <br />8 <br />OCCUPANCY SEPARATIONS <br />a <br />3 <br />06 4- <br />7 <br />4 <br />Z 11 <br />Job No: 01-841 <br />H3//B <br />2 HOURS <br />oo<n SEPT. 03, 2002 <br />MIXING ROOM (112) <br />By <br />BUILDING PERMIT PLAN <br />®CHECK - 12/09/2002 <br />AUK <br />PER UBC SEC. 307.1.3.2 <br />2 HOURS <br />TYPE OF CONSTRUCTION <br />III -N <br />ehwt Num <br />FIRE SPRINKLERS <br />YES <br />BUILDING AREA <br />BUILDING <br />5,376 SF <br />MEZZANINES <br />1,148 SF <br />CANOPIES <br />2,334 SF <br />TOTAL <br />8,858 SF <br />AREAS BY OCCUPANCY <br />H-2 MIXING ROOM <br />193 SF <br />H-3 CANOPIES & STORAGE 5,459 SF <br />M REUSE ROOM <br />266 SF <br />S-1 STORAGE <br />2,268 SF <br />B OFFICE <br />672 SF <br />ALLOWABLE AREA <br />H-2 H-3 <br />M <br />S-1 B <br />BASIC <br />3,700 SF 7,500 SF <br />12,000 SF <br />12,000 SF 12,000 SF <br />SEPARATION 3 SIDES) <br />N/A N/A <br />N/A <br />N/A N/A <br />SEPARATION 2 SIDES) <br />N/A N/A <br />N/A <br />+6,000 +6,000 <br />FIRE SPRINKLERS <br />N/A N/A <br />X3 <br />X3 X3 <br />.TOTALS <br />3,700 SF 7,500 SF <br />36,000 SF <br />54,000 SF 54,000 SF <br />ALLOWABLE AREA OF MIXED <br />OCCUPANCIES PER 1998 CBC SECTION 504,3: <br />(H-2) 193 +(H-3) 5,459 <br />+ (M) 266 + (S-1, <br />B)2,940 <br />= .84 < 1.0 <br />3,700 7,500 <br />36,000 <br />54,000 <br />Note: The Storage Area is <br />not constructed for <br />explosion <br />control per UBC Section 307.10. <br />The following materials, <br />Identified as H2 in the Building Code, are not permitted <br />in the Storage Area due to <br />explosion control requirements <br />In the 1994 UFC: <br />1. Class 1 Organic Peroxides. <br />2. Class 3 Nondetonatable Unstable (Reactive) <br />Materials. <br />3. Pyrophoric Gases <br />4. Flammable or Oxidizing <br />Gases. <br />5. Class 3 Water -Reactive Materials. <br />aw <br />ENGINEERING <br />maAnoas <br />8"0 <br />` amarum <br />11th OMS46M <br />!ti 0 5444M <br />,�PFGFL'SS/0177, <br />S <br />y <br />e. 30M ; <br />ENP. 3-31-04 <br />Or CAL\ <br />ba p0.0FESSIppq <br />..Q' s. So <br />W � L <br />No..S0m <br />FW43,1-4 <br />'rx CML <br />V of o:a�TO`I/4roi <br />IIS <br />a <br />3 <br />06 4- <br />7 <br />4 <br />Z 11 <br />Job No: 01-841 <br />went sr• WJK <br />cn«aa sy: DS <br />oo<n SEPT. 03, 2002 <br />Revisions <br />By <br />BUILDING PERMIT PLAN <br />®CHECK - 12/09/2002 <br />AUK <br />ehwt Num <br />G2 <br />2 a 3 <br />I <br />