Laserfiche WebLink
1 <br />�5 PROTECTION 20.5 P� <br />q INSTALL DRAIN INLET 3 GENERAL: <br />_.. _..-, �....... V 1 - _ -_--TIO <br />_ 1 20.5 PAD ' _ - - 1. ENTRANCE MAY BE ADJUSTEDUCTION ENTRANCE SBYLTHEECONTRACTORINSTALLED PTO FAIOR C TATEMGRADINGPERATINS. ALLENCEMENT OF GRADING. CONSTRUCTIN OF ON <br />FIBERINSTALL ROLL AD <br />N MAINTAIN RUNTIL _ ��, /1 TRAFFIC ENTERING THE PAVED ROAD MUST CROSS THE CONSTRUCTION ENTRANCE. <br />�� ` 9 % 2 EROSION AND SEDIMENT CONTROL PLAN TO MEET FIELD CONDITIONS SHALL BE MADE ONLY <br />1805 _-PAD INSTALL DRAIN INLET ` G° -�� ' "9.5 PAD .l i _ CHANGES <br />THE APPROVAL OF, OR AT THE DIRECTION OF THE ENGINEER. DURING THE RAINY SEAS., PUBLIC <br />' I'' PRO CTION ROADWAY SHALL BE KEPT CLEAR OF EARTH MATERIAL AND DEBRIS. THE SITE SHALL BE MAINTAINED SO THAT A <br />8.05 PAD 8 5 ,PAD �� 5 <br />MINIMUM OF SEDIMENT LADEN RUNOFF ENTERS THE STORM DRAINAGE SYSTEM AND PUBLIC ROADWAY. THIS <br />I + / PLAN COVERS ONLY THE FIRST WINTER FOLLOWING GRADING. PLANS SHALL BE RESUBMITTED FOR APPROVAL � <br />- 'L. 1 A ri 2 = PRIOR TO SEPTEMBER 1ST OF EACH SUBSEQUENT YEAR UNTIL THE PROPOSED IMPROVEMENTS ARE COMPLETED. w <br />{{ INSTALL ILLI RJLQ - <br />22 - , 120.0 -PAD <br />117.55 PAD �I I PROTECTION 3 OL M S BE INSPECTED AND REPAIRED AT THE END OF EACH WORKING DAY AND IN <br />CONTROL MEASURES HALL <br />ADDITION, AFTER EACH STORM. <br />INSTALL FIBER ROLL <br />INSTALL DRAIN INLET _ - --- --_- -_ <br />�� PROTECTION '� -- ° I"-- �' - 4. ALL EROSION CONTROL BMPs SHALL BE IN PLACE PRIOR TO ANY STORM EVENTS <br />MAINTAIN UNTIL <br />2' � 5. CONTRACTOR TO USE A WATER TRUCK DURING GRADING TO MINIMIZE WIND EROSION AND REDUCE DUST 0 <br />NEC " - _ INSTALLDRAININLET _ ;� \ _ 6. IN CASE DEWATERING IS NECESSARY, THE CONTRACTOR SHALL ENGAGE AN EROSION CONTROL CONTRACTOR Z o <br />x:11 '. 1 /.55'PAD _ % r, - INSTAL - �- . - TO PROPERLY DISPOSE OF THE WATER. DETENTION PONDS MAY BE REQUIRED FOR DEWATERING AND THEY <br />NECESSARY F p PROTECTION I _ _____ -,_._ _______ .__ _ .e WILL BE DESIGNED IF THE NEED ARISES. ALTERNATIVE EFFECTIVE METHODS SHALL BE IMPLEMENTED IF THE +N <br />71 5 PAD 24 -- - - - FAILS TO THE SATISFACTION OF THE INSPECTOR. °' 0 0 <br />i PROPOSED METHOD <br />118 0 AD o a <br />INSTALL DRAT PAD 7.65 PBD I ----- - -- --- --- --- - -_=-a BMP NOTES: W n 00 <br />r j - - _ _ _ "1. ".-_ 1. ALL ON-SITE MATERIALS WILL BE STORED IN LOCK BOX Z x <br />N INLET - v a <br />_ PROTECTION I --_ n .__ \ \I 2. USE WATERING TRUCK FOR DUST CONTROLm <br />3. ALL PLANTER AREAS TO RECEIVE STRAW AND TACKIFIER AFTER PAVING ACTIVITIES ARE COMPLETE o <br />-- - - .. <br />O o <br />INSTALL DRAIN IN I + 9 4. ALL DEBRISAND SOLID WASTE TO BE STOCKPILED IN A 40 YARD DUMPSTER W d 3 0 <br />- INSTALL `IIB �r, <br />- I NECESSARY <br />UNTIL LET -- -"' -- �_ - - i- T' S. ALL SPOILPILESTO BE COVERED COMPLETELY WITH PLASTIC SHEETING AND SPOIL REAS TO BE <br />PROTECTION - - - if SURROUNDED WITH STRAW/FIDE ROLLS. <br />ROLL <br />�� 6 WASHED ON PROJECT SITE. ALL VEHICLE AND <br />7 5 PAD <br />34 N' MACHINERY MAINTENANCE E 0 BERPER PERFORMED FUELED Z <br />I <br />04 <br />INSTAL RAIN IOL '._ 7. ALL WATER PUMPED FROM TRENCHES OR SEDIMENT TRAP MUST PASS THROUGH A GRAVEL BAG FOR <br />PROTECTION 1 FILTRATION BEFORE R IS DISCHARGED ON PROPERTY. <br />- -- <br />N <br />lqt CLg <br />--- `-- _ 8. DURING ROUGH GRADING CONTRACTOR TO INSTALL HEARTH DIKE AND STRAW/FILTER ROLLS AT PERIMETER OF <br />INSTALL DRAIN INLT <br />1119.0 PAD �'., THE PROPERTY TO MANTAIN RUN-OFF ON SITE <br />i .: INSTALL DRAIN INLET PROTECTION,, �; '' _ ---- ------ ,; ----- �a 9. IN CASE COLLOIDAL SUSPENSION NEEDS TO BE REMOVED PRIOR TO DISCHARGE, THE CONTRACTOR WILL <br />.. ll7.r F'Ail + ,+ PROTECTION u _ DESIGN AND CONSTRUCT TEMPORARY HOLDING BASINS. THE DESIGN OF THE BASIN WILL BE ADDRESSED IF V N 0 <br />'i _ - (; • 7 7 THE NEED ARISES. <br />28 <br />1 1 } 0 PAD , 10.ALL LANDSCAPED AREAS ARE GRADED TO DRAIN IN THE DIRECTION OF THE DRAIN INLET. REFER TO Q <br />li16.5 PAD <br />116.50 PAD �- S. LANDSCAPING AND GRADING PLAN FOR DRAINAGE PATTERNS. F- Z Z <br />29 <br />1 6.5 PAD �' Q <br />INSTALL FIBER ROLL 6.5 PAD U <br />- <br />MAIN UNTIL i _ ___- EROSION CONTROL NOTES: Z H <br />---- MEf.-;,ESSARY - - �; ! - - 1. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CONSTRUCTED AND LL_ Q <br />'i 33 MAINTAINED IN ACCORDANCE WffH THIS PUNS AND SPECIFICATIONS AND THE - <br />35 Z <br />-- _ : � CALTRANS STORM WATER QUALITY HANBONS, CURRENT EDITION (MARCH 2003). Cn <br />- ,, <br />q ' _ - 7� �,'i- 6 2. EROSION CONTROL BEST MANAGEMENT PRACTICES (BMPs) SHALL INSTALLED AND 0 <br />14 I �,_ 32 \ / ! - +I I <br />117.0 PAD. - 3g, MAINTAINED DURING THE WET SEASON (OCTOBER 15 THROUGH APRIL 30). SEDIMENT W Q <br />117.0 FAD � _ � - ., CONTROL BMPs SHALL BE INSTALLED AND MAINTAINED ALL YEAR. <br />31 " -. - - 3. ALL DRAINAGE INLETS IMMEDIATELY DOWNSTREAM OF THE WORK AREAS AND <br />WITHIN THE WORK AREAS SHALL BE PROTECTED WITH SEDIMENT CONTROL AND Z <br />116.5 PA I; I _ INLET FILTER BAGS, YEAR ROUND. INLET FILTER BAGS SHALL BE REMOVED Z O <br />FROM THE DRAINAGE INLETS UPON ACCEPTANCE OF THE PUBLIC LV m Z <br />r. \ <br />IMPROVEMENTS. <br />' 4. ALL STABILIZED CONSTRUCTION ACCESS LOCATIONS SHALL BE CONSTRUCTED PER <br />ATTACHED DETAIL WHERE CONSTRUCTION TRAFFIC ENTERS OR LEAVES PAVED AREAS. THE W Q <br />STABILIZED ACCESS SHALL BE MAINTAINED ON A YEAR ROUND BASIS UNTIL COMPLETION <br />U Z <br />i <br />ix 0 <br />CONSTRUCTION <br />ALLREAS <br />_ _ CONSTRUCTION _ CONSTRUCTION 5. DISTURBED DURING CONSTRUCTION, BY GRADING, TRENCHING, OR OTHER ACTIVITIES, <br />P 'f' - ENTRANCE SHALL BE PROTECTED FROM EROSION DURING THE WET SEASON (OCTOBER 15 THROUGH C. O <br />ENTRANCE CHRISMAN ROAD -__ - ._-._ _ -_. _-__ .__..__ _._____ - , _. --_-- _-- APRIL 30). HYDROSEED, IF UTILIZED, MUST BE PLACED BY SEPTEMBER 15. HYDRO EE <br />- PLACED DURING THE SEASON SHALL USE A SECONDARY EROSION PROTECTION METHOD <br />N DURING LXkSIRUCTION, „ - <br />.. SUCH AS EROSION CONTROL BLANKETS OR STRAW MULCH W <br />6. SENSITIVE REAS AND AREAS WHERE EXISTING VEGETATION IS BEING PRESERVED Design ACCESS TO sBE FROM CHmmN ROAD S RFSIRICTED IXOEPr AT APPROVED TEMPORARY CONSTRUCTION ENTRANCES SHALL BE PROTECTED WITH CONSTRUCTION FENCING. SEDIMENT CONTROL BMPs g <br />SHALL BE INSTALLED WHERE ACTIVE CONSTRUCTION AREAS DRAIN INTO SENSITIVE AMC <br />------ INSTALL STRAW ROLL OR FILTER ROLL O OR PRESERVED VEGETATION AREAS Check <br />A DETAILED INSTALLATION AND MAINTENANCE SCHEDULE DURING <br />THE VAROUS PHASES OF CONSTRUCTION IS OUTLINED IN SECTION <br />3 OF THE SWPPP BOOK. <br />ROUGH GRADING: INSTALL CATCHBASIN INLET PROTECTION, INSTALL <br />STRAW OR FILTER ROLLS AT BACK OF WALK <br />AND AT EDGE OF GRADING. THE EXISTING <br />GROUND DOES NOT HAVE A DEFINED DIRECTION <br />OF FLOW. A CONSTRUCTION ENTRANCE SHALL <br />BE INSTALLED PRIOR TO COMMENCING GRADING <br />INSTALL CONSTRUCTION O <br />ENTRANCE PROTECTION 4 <br />®INSTALL CONCRETE WASHOUT AREA IN <br />LOCATIONS APPROVED BY A CERTIFIED <br />IN EROSION & SEDIMENT CONTROL <br />5 <br />PROFESSIONAL <br />7. SEDIMENT CONTROL BMPs SHALL BE PLACED ALONG THE PROJECT PERIMETER WHERE <br />DRAINAGE LEAVES THE PROJECT. SEDIMENT CONTROL BMPs SHALL BE MAINTAINED YEAR <br />ROUND UNTIL THE CONSTRUCTION IS COMPLETE OR THE DRAINAGE PATTERN HAS BEEN <br />CHANGED AND NO LONGER LEAVES THE SITE. <br />8. THE FOLLOWING AREA ARE TO RECEIVE HYDROSEEDING OR OTHER EROSION CONTROL: <br />LOT FRONT YARD BEHIND SIDEWALK - THE FIRST 18 FEET OR TOP OF SLOPE <br />(WHICHEVER IS GREATER) <br />SIDEYRDS BEHIND THE SIDEWALK - THE FIRST 7.5 FEET OR TOP OF SLOPE <br />(WHICHEVER IS GREATER) <br />SLOPES - ALL SLOPES GRATER THAT 10:1 <br />SUBSTANTIAL COMPLIANCE AT ALL TIME WITH THE STORM WATER POLLUTION <br />AMC <br />Date <br />01/27/05 <br />AREA RESERVED FOR WASTE <br />Original Drawing Scale <br />PREVENTIONy PLAN OF CALFORNIA)GENEPARED FOR THE ERAL CONSTRUCTION PROJECT IN <br />THIS PERMIT WITH <br />REQUIRES THAT THE SWPPP BE KEPT UP TO DATE TO REFLECT THE CHANGING <br />SITE CONDITIONS AND THE SWPPP IS TO BE AVAILABLE ON SITE AT ALL TIMES FOR <br />REVIEW BY STATE AND LOCAL INSPECTORS. <br />CONCRETE WASHOUT AREA <br />BIN AND MATERIA STORAGE <br />®TO <br />AND/OR EROSION CONTROL BLANKETSProject <br />��' <br />USE REMOVABLE <br />ALL MATERIALS TO BE STORED <br />File No. <br />7 <br />,,CONTRACTOR`:TO <br />CONGRTE WASHOUT BINS <br />IN; LOCK, BOX. ENTIRE STORAGE <br />04-137 <br />ORI.REFER TO DETAILS <br />AREA,TO BE WRAPPED BY=_X.1 <br />INSTALL FIBER ROLL <br />AW_ DIIIIMNM� <br />CONTRACTOR TO RELOCATE <br />MINIMUM 6" BERM CONTRACTOR <br />_ <br />MAINTAIN UNTIL <br />AS NECESSARY <br />TCt:RELOCATE AS, NECESSARY 3 <br />NECESSARY <br />- J <br />4 120 PAD <br />, <br />INSTRUCTION <br />20.7 PAC <br />12 - <br />INSTALL_DRAIN <br />INLET <br />.ENTRANCE <br />5 <br />179.7 PkD <br />PROTECT]O.N <br />_ = <br />I PAD <br />19.7 PAD <br />t <br />b <br />120.0 AAD <br />1 <br />�5 PROTECTION 20.5 P� <br />q INSTALL DRAIN INLET 3 GENERAL: <br />_.. _..-, �....... V 1 - _ -_--TIO <br />_ 1 20.5 PAD ' _ - - 1. ENTRANCE MAY BE ADJUSTEDUCTION ENTRANCE SBYLTHEECONTRACTORINSTALLED PTO FAIOR C TATEMGRADINGPERATINS. ALLENCEMENT OF GRADING. CONSTRUCTIN OF ON <br />FIBERINSTALL ROLL AD <br />N MAINTAIN RUNTIL _ ��, /1 TRAFFIC ENTERING THE PAVED ROAD MUST CROSS THE CONSTRUCTION ENTRANCE. <br />�� ` 9 % 2 EROSION AND SEDIMENT CONTROL PLAN TO MEET FIELD CONDITIONS SHALL BE MADE ONLY <br />1805 _-PAD INSTALL DRAIN INLET ` G° -�� ' "9.5 PAD .l i _ CHANGES <br />THE APPROVAL OF, OR AT THE DIRECTION OF THE ENGINEER. DURING THE RAINY SEAS., PUBLIC <br />' I'' PRO CTION ROADWAY SHALL BE KEPT CLEAR OF EARTH MATERIAL AND DEBRIS. THE SITE SHALL BE MAINTAINED SO THAT A <br />8.05 PAD 8 5 ,PAD �� 5 <br />MINIMUM OF SEDIMENT LADEN RUNOFF ENTERS THE STORM DRAINAGE SYSTEM AND PUBLIC ROADWAY. THIS <br />I + / PLAN COVERS ONLY THE FIRST WINTER FOLLOWING GRADING. PLANS SHALL BE RESUBMITTED FOR APPROVAL � <br />- 'L. 1 A ri 2 = PRIOR TO SEPTEMBER 1ST OF EACH SUBSEQUENT YEAR UNTIL THE PROPOSED IMPROVEMENTS ARE COMPLETED. w <br />{{ INSTALL ILLI RJLQ - <br />22 - , 120.0 -PAD <br />117.55 PAD �I I PROTECTION 3 OL M S BE INSPECTED AND REPAIRED AT THE END OF EACH WORKING DAY AND IN <br />CONTROL MEASURES HALL <br />ADDITION, AFTER EACH STORM. <br />INSTALL FIBER ROLL <br />INSTALL DRAIN INLET _ - --- --_- -_ <br />�� PROTECTION '� -- ° I"-- �' - 4. ALL EROSION CONTROL BMPs SHALL BE IN PLACE PRIOR TO ANY STORM EVENTS <br />MAINTAIN UNTIL <br />2' � 5. CONTRACTOR TO USE A WATER TRUCK DURING GRADING TO MINIMIZE WIND EROSION AND REDUCE DUST 0 <br />NEC " - _ INSTALLDRAININLET _ ;� \ _ 6. IN CASE DEWATERING IS NECESSARY, THE CONTRACTOR SHALL ENGAGE AN EROSION CONTROL CONTRACTOR Z o <br />x:11 '. 1 /.55'PAD _ % r, - INSTAL - �- . - TO PROPERLY DISPOSE OF THE WATER. DETENTION PONDS MAY BE REQUIRED FOR DEWATERING AND THEY <br />NECESSARY F p PROTECTION I _ _____ -,_._ _______ .__ _ .e WILL BE DESIGNED IF THE NEED ARISES. ALTERNATIVE EFFECTIVE METHODS SHALL BE IMPLEMENTED IF THE +N <br />71 5 PAD 24 -- - - - FAILS TO THE SATISFACTION OF THE INSPECTOR. °' 0 0 <br />i PROPOSED METHOD <br />118 0 AD o a <br />INSTALL DRAT PAD 7.65 PBD I ----- - -- --- --- --- - -_=-a BMP NOTES: W n 00 <br />r j - - _ _ _ "1. ".-_ 1. ALL ON-SITE MATERIALS WILL BE STORED IN LOCK BOX Z x <br />N INLET - v a <br />_ PROTECTION I --_ n .__ \ \I 2. USE WATERING TRUCK FOR DUST CONTROLm <br />3. ALL PLANTER AREAS TO RECEIVE STRAW AND TACKIFIER AFTER PAVING ACTIVITIES ARE COMPLETE o <br />-- - - .. <br />O o <br />INSTALL DRAIN IN I + 9 4. ALL DEBRISAND SOLID WASTE TO BE STOCKPILED IN A 40 YARD DUMPSTER W d 3 0 <br />- INSTALL `IIB �r, <br />- I NECESSARY <br />UNTIL LET -- -"' -- �_ - - i- T' S. ALL SPOILPILESTO BE COVERED COMPLETELY WITH PLASTIC SHEETING AND SPOIL REAS TO BE <br />PROTECTION - - - if SURROUNDED WITH STRAW/FIDE ROLLS. <br />ROLL <br />�� 6 WASHED ON PROJECT SITE. ALL VEHICLE AND <br />7 5 PAD <br />34 N' MACHINERY MAINTENANCE E 0 BERPER PERFORMED FUELED Z <br />I <br />04 <br />INSTAL RAIN IOL '._ 7. ALL WATER PUMPED FROM TRENCHES OR SEDIMENT TRAP MUST PASS THROUGH A GRAVEL BAG FOR <br />PROTECTION 1 FILTRATION BEFORE R IS DISCHARGED ON PROPERTY. <br />- -- <br />N <br />lqt CLg <br />--- `-- _ 8. DURING ROUGH GRADING CONTRACTOR TO INSTALL HEARTH DIKE AND STRAW/FILTER ROLLS AT PERIMETER OF <br />INSTALL DRAIN INLT <br />1119.0 PAD �'., THE PROPERTY TO MANTAIN RUN-OFF ON SITE <br />i .: INSTALL DRAIN INLET PROTECTION,, �; '' _ ---- ------ ,; ----- �a 9. IN CASE COLLOIDAL SUSPENSION NEEDS TO BE REMOVED PRIOR TO DISCHARGE, THE CONTRACTOR WILL <br />.. ll7.r F'Ail + ,+ PROTECTION u _ DESIGN AND CONSTRUCT TEMPORARY HOLDING BASINS. THE DESIGN OF THE BASIN WILL BE ADDRESSED IF V N 0 <br />'i _ - (; • 7 7 THE NEED ARISES. <br />28 <br />1 1 } 0 PAD , 10.ALL LANDSCAPED AREAS ARE GRADED TO DRAIN IN THE DIRECTION OF THE DRAIN INLET. REFER TO Q <br />li16.5 PAD <br />116.50 PAD �- S. LANDSCAPING AND GRADING PLAN FOR DRAINAGE PATTERNS. F- Z Z <br />29 <br />1 6.5 PAD �' Q <br />INSTALL FIBER ROLL 6.5 PAD U <br />- <br />MAIN UNTIL i _ ___- EROSION CONTROL NOTES: Z H <br />---- MEf.-;,ESSARY - - �; ! - - 1. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CONSTRUCTED AND LL_ Q <br />'i 33 MAINTAINED IN ACCORDANCE WffH THIS PUNS AND SPECIFICATIONS AND THE - <br />35 Z <br />-- _ : � CALTRANS STORM WATER QUALITY HANBONS, CURRENT EDITION (MARCH 2003). Cn <br />- ,, <br />q ' _ - 7� �,'i- 6 2. EROSION CONTROL BEST MANAGEMENT PRACTICES (BMPs) SHALL INSTALLED AND 0 <br />14 I �,_ 32 \ / ! - +I I <br />117.0 PAD. - 3g, MAINTAINED DURING THE WET SEASON (OCTOBER 15 THROUGH APRIL 30). SEDIMENT W Q <br />117.0 FAD � _ � - ., CONTROL BMPs SHALL BE INSTALLED AND MAINTAINED ALL YEAR. <br />31 " -. - - 3. ALL DRAINAGE INLETS IMMEDIATELY DOWNSTREAM OF THE WORK AREAS AND <br />WITHIN THE WORK AREAS SHALL BE PROTECTED WITH SEDIMENT CONTROL AND Z <br />116.5 PA I; I _ INLET FILTER BAGS, YEAR ROUND. INLET FILTER BAGS SHALL BE REMOVED Z O <br />FROM THE DRAINAGE INLETS UPON ACCEPTANCE OF THE PUBLIC LV m Z <br />r. \ <br />IMPROVEMENTS. <br />' 4. ALL STABILIZED CONSTRUCTION ACCESS LOCATIONS SHALL BE CONSTRUCTED PER <br />ATTACHED DETAIL WHERE CONSTRUCTION TRAFFIC ENTERS OR LEAVES PAVED AREAS. THE W Q <br />STABILIZED ACCESS SHALL BE MAINTAINED ON A YEAR ROUND BASIS UNTIL COMPLETION <br />U Z <br />i <br />ix 0 <br />CONSTRUCTION <br />ALLREAS <br />_ _ CONSTRUCTION _ CONSTRUCTION 5. DISTURBED DURING CONSTRUCTION, BY GRADING, TRENCHING, OR OTHER ACTIVITIES, <br />P 'f' - ENTRANCE SHALL BE PROTECTED FROM EROSION DURING THE WET SEASON (OCTOBER 15 THROUGH C. O <br />ENTRANCE CHRISMAN ROAD -__ - ._-._ _ -_. _-__ .__..__ _._____ - , _. --_-- _-- APRIL 30). HYDROSEED, IF UTILIZED, MUST BE PLACED BY SEPTEMBER 15. HYDRO EE <br />- PLACED DURING THE SEASON SHALL USE A SECONDARY EROSION PROTECTION METHOD <br />N DURING LXkSIRUCTION, „ - <br />.. SUCH AS EROSION CONTROL BLANKETS OR STRAW MULCH W <br />6. SENSITIVE REAS AND AREAS WHERE EXISTING VEGETATION IS BEING PRESERVED Design ACCESS TO sBE FROM CHmmN ROAD S RFSIRICTED IXOEPr AT APPROVED TEMPORARY CONSTRUCTION ENTRANCES SHALL BE PROTECTED WITH CONSTRUCTION FENCING. SEDIMENT CONTROL BMPs g <br />SHALL BE INSTALLED WHERE ACTIVE CONSTRUCTION AREAS DRAIN INTO SENSITIVE AMC <br />------ INSTALL STRAW ROLL OR FILTER ROLL O OR PRESERVED VEGETATION AREAS Check <br />A DETAILED INSTALLATION AND MAINTENANCE SCHEDULE DURING <br />THE VAROUS PHASES OF CONSTRUCTION IS OUTLINED IN SECTION <br />3 OF THE SWPPP BOOK. <br />ROUGH GRADING: INSTALL CATCHBASIN INLET PROTECTION, INSTALL <br />STRAW OR FILTER ROLLS AT BACK OF WALK <br />AND AT EDGE OF GRADING. THE EXISTING <br />GROUND DOES NOT HAVE A DEFINED DIRECTION <br />OF FLOW. A CONSTRUCTION ENTRANCE SHALL <br />BE INSTALLED PRIOR TO COMMENCING GRADING <br />INSTALL CONSTRUCTION O <br />ENTRANCE PROTECTION 4 <br />®INSTALL CONCRETE WASHOUT AREA IN <br />LOCATIONS APPROVED BY A CERTIFIED <br />IN EROSION & SEDIMENT CONTROL <br />5 <br />PROFESSIONAL <br />7. SEDIMENT CONTROL BMPs SHALL BE PLACED ALONG THE PROJECT PERIMETER WHERE <br />DRAINAGE LEAVES THE PROJECT. SEDIMENT CONTROL BMPs SHALL BE MAINTAINED YEAR <br />ROUND UNTIL THE CONSTRUCTION IS COMPLETE OR THE DRAINAGE PATTERN HAS BEEN <br />CHANGED AND NO LONGER LEAVES THE SITE. <br />8. THE FOLLOWING AREA ARE TO RECEIVE HYDROSEEDING OR OTHER EROSION CONTROL: <br />LOT FRONT YARD BEHIND SIDEWALK - THE FIRST 18 FEET OR TOP OF SLOPE <br />(WHICHEVER IS GREATER) <br />SIDEYRDS BEHIND THE SIDEWALK - THE FIRST 7.5 FEET OR TOP OF SLOPE <br />(WHICHEVER IS GREATER) <br />SLOPES - ALL SLOPES GRATER THAT 10:1 <br />SUBSTANTIAL COMPLIANCE AT ALL TIME WITH THE STORM WATER POLLUTION <br />AMC <br />Date <br />01/27/05 <br />Scale <br />1" = 60' <br />Original Drawing Scale <br />OPERATIONS. <br />9 EROSION AND SEDIMENT CONTROL MEASURES FOR THIS PROJECT SHALL BE IN 0 1%t" 1 " <br />PAVING: INSTALL STRAW OR FILTER ROLLS AT NEW BACK OF <br />WALK. MANTAIN PROTECTION AT CATCHBASIN, INSTALL <br />ROCK BAGS IN GUTTER PAN. HYDROSEED OR STABILIZE <br />WITH OTHER METHODS DISTURBED SOIL PRIOR TO WET <br />SEASON. ALLOW FOR VEGETATION TO DEVELOP IF <br />HYDROSEEDING. <br />6 SS <br />INSTALL GRAVEL BAGS AND FILTER <br />FABRICS OO <br />SUBSTANTIAL COMPLIANCE AT ALL TIME WITH THE STORM WATER POLLUTION <br />TO PROTECT ALL INLETS (NP ALL INLETS) OO <br />CONTRACTOR TO STABILIZE DISTURBED SOIL PRIOR <br />RAIN EVENT THROUGH SOIL BINDERS, STRAW MULCH <br />PREVENTIONy PLAN OF CALFORNIA)GENEPARED FOR THE ERAL CONSTRUCTION PROJECT IN <br />THIS PERMIT WITH <br />REQUIRES THAT THE SWPPP BE KEPT UP TO DATE TO REFLECT THE CHANGING <br />SITE CONDITIONS AND THE SWPPP IS TO BE AVAILABLE ON SITE AT ALL TIMES FOR <br />REVIEW BY STATE AND LOCAL INSPECTORS. <br />LJJ_LJ_L1_LU <br />Sheet Number <br />21 Of 24 <br />®TO <br />AND/OR EROSION CONTROL BLANKETSProject <br />File No. <br />7 <br />04-137 <br />CALTRANS STD. 33-3, SS- , - <br />