My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-3856
PublicWorks
>
VAULT MAPS
>
Subdivision - SU (GIS FILES)
>
SU-3821-3960
>
SU-3856
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2024 9:52:28 AM
Creation date
10/9/2024 9:52:24 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EM <br />A DETAILED INSTALLATION AND MAINTENANCE SCHEDULE DURING <br />THE VAROUS PHASES OF CONSTRUCTION IS OUTLINED IN SECTION <br />3 OF THE SWPPP BOOK. <br />ROUGH GRADING: INSTALL CATCHBASIN INLET PROTECTION, INSTALL <br />STRAW OR FILTER ROLLS AT BACK OF CURB <br />AND AT EDGE OF GRADING. THE EXISTING <br />GROUND DOES NOT HAVE A DEFINED DIRECTION <br />OF FLOW. A CONSTRUCTION ENTRANCE SHALL <br />BE INSTALLED PRIOR TO COMMENCING GRADING <br />OPERATIONS. <br />PAYING: INSTALL STRAW OR FILTER ROLLS AT NEW BACK OF <br />WALK MANTAIN PROTECTION AT CATCHBASIN, INSTALL <br />ROCK BAGS IN GUTTER PAN. HYDROSEED OR STABILIZE <br />WITH OTHER METHODS DISTURBED SOIL PRIOR TO WET <br />SEASON. ALLOW FOR VEGETATION TO DEVELOP IF <br />^ HYDROSEEDING. <br />RESPONSIBLE INDIVIDUAL <br />CHAD KILTZ <br />WDID NO. <br />INSTALL FIBER ROLL <br />:A RESERVED FOR WASTE <br />AND MATERIAL STORAGE <br />MATERIALS TO BE STORED <br />LOCK BOX. ENTIRE STORAGE <br />JA TO BE WRAPPED BY <br />IIMUM 6" BERM CONTRACTOR <br />RELOCATE AS NECESSARY <br />------ INSTALL STRAW ROLL OR FILTER ROLL O <br />®INSTALL CONSTRUCTION 4 <br />ENTRANCE PROTECTION O 0 <br />®INSTALL CONCRETE WASHOUT AREA IN 5 <br />LOCATIONS APPROVED BY A CERTIFIED PROFESSIONAL <br />IN EROSION & SEDIMENT CONTROL <br />INSTALL GRAVEL BAGS AND FILTER FABRICS OO <br />TO PROTECT ALL INLETS (TYP ALL INLETS) OO <br />CONTRACTOR TO STABILIZE DISTURBED SOIL PRIOR <br />®TO RAIN EVENT THROUGH SOIL BINDERS, STRAW MULCH <br />AND/OR EROSION CONTROL BLANKETS <br />CALTRANS STD. SS -3, SS -6, SS -7 <br />STORM WATER POLLUTION PREVENTION PLAN <br />WITH THE EXCEPTION OF PROPERLY DESIL70 WATER FROM SITE DEWATERING, THE <br />CONTRACTOR SWILL NOT DISCHARGE ANY MATERIALS AND/OR LIQUIDS TO THE STORM <br />DRAINAGE SYSTEM. ACTIVITIES OF PARTICULAR CONCERN ARE: <br />A. CONTRACTOR SHALL DESIGNATE A CONCRETE TRUCK CLEAN-OUT AREA COUNTY INSPECTOR <br />APPROVED BEST MANAGEMENT PRACTICES SHALL AT ALL TIMES BE FULLY IMPLEMENTED AT <br />AND AROUND THE CLEAN-OUT AREA <br />B. TACK COAT AND PRIME COAT ASPHALTS SHALL BE CAREFULLY SPRAYED AND ANY <br />EXCESS MATERIAL SPILLED SHALL BE CLEANED UP IMMEDIATELY BY PROPER METHODS. <br />C. ALL EQUIPMENT REFUELING IN THE PROJECT AREA SHAT BE CAREFULLY DONE TO AVON) <br />SPILLAGE. ANY SPILLS SHALL BE CONTAINED AND CLEANED UP IMMEDIATELY IN <br />ACCORDANCE WITH STATE AND LOCAL REQUIREMENTS. ALL FUELING VEHICLES SHALL BE <br />EQUIPPED WITH SPIT CLEANUP MATERIALS AND EQUIPMENT. <br />D. CONTRACTOR SHAD_ CONTROL AND PROPERLY DISPOSE OF ALL LIQUIDS DURING <br />SAWCUTTMG ACTIVITIES <br />GENERAL <br />- <br />1. A CONSTRUCTION ENTRANCE SHALL BE INSTALLED PRIOR TO COMMENCEMENT OF GRADING. LOCATION OF THE <br />ENTRANCE MAY BE ADJUSTED BY THE CONTRACTOR TO FACILITATE GRADING OPERATIONS. ALL CONSTRUCTION <br />TRAFFIC ENTERING THE PAVED ROAD MUST CROSS THE CONSTRUCTION ENTRANCE. d <br />2. CHANGES TO THIS EROSION AND SEDIMENT CONTROL PLAN TO MEET FIELD CONDITIONS SHALL BE MADE ONLY Z <br />WITH THE APPROVAL OF, OR AT THE DIRECTION OF THE ENGINEER. DURING THE RAINY SEASON, PUBLIC <br />ROADWAY SHALL BE KEPT CLEAR OF EARTH MATERIAL AND DEBRIS. THE SITE SHALL BE MAINTAINED SO THAT A <br />MINIMUM OF SEDIMENT LADEN RUNOFF ENTERS THE STORM DRAINAGE SYSTEM AND PUBLIC ROADWAY. THIS ai <br />PLAN COVERS ONLY THE FIRST WINTER FOLLOWING GRADING. PUNS SHALL BE RESUBMITTED FOR APPROVAL NUJ <br />PRIOR TO SEPTEMBER IST OF EACH SUBSEQUENT YEAR UNTIL THE PROPOSED IMPROVEMENTS ARE COMPLETED. Q m <br />3. CONTROL MEASURES SHALL BE INSPECTED AND REPAIRED AT THE END OF EACH WORKING DAY AND, M u C <br />ADD", AFTER EACH STORM. O <br />4. ALL EROSION CONTROL BMPs SHALL BE IN PUCE PRIOR TO ANY STORM EVENTS (n W <br />5. CONTRACTOR TO USE A WATER TRUCK DURING GRADING TO MINIMIZE WIND EROSION AND REDUCE DUST Ln <br />6. IN CASE DEWATERING IS NECESSARY, THE CONTRACTOR SHAT ENGAGE AN EROSION CONTROL CONTRACTOR 0 ; <br />TO PROPERLY DISPOSE OF THE WATER. DETENTION PONDS MAY BE REQUIRED FOR DEWATERING AND THEY y1 Z O <br />WILL BE DESIGNED F THE NEED ARISES. ALTERNATIVE EFFECTIVE METHODS SHALL BE IMPLEMENTED IF THEN` <br />PROPOSED METHOD FAILS TO THE SATISFACTION OF THE INSPECTOR. UJ O <br />BMP NOTES: Z z -n <br />1. ALL ON-SITE MATERIALS WILL BE STORED IN LOCK BOX O a Alt <br />2. USE WATERING TRUCK FOR DUST CONTROL (J U.J QC4 <br />3. ALL PLANTER AREAS TO RECEIVE STRAW AND TACKIFIER AFTER PAVING ACTIVITIES ARE COMPLETEI <br />4. ALL DEBRIS AND SOLID WASTE TO BE STOCKPILED IN A 40 YARD DUMPSTER <br />5. ALL SPOIL PILES TO BE COVERED COMPLETELY WITH PLASTIC SHEETING AND SPOIL AREAS TO BE <br />SURROUNDED WITH STRAW/FILTER ROLLS. <br />6. NO VEHICLES OR MACHINERY TO BE STORED, FUELED OR WASHED ON PROJECT SITE. ALL VEHICLE AND <br />MACHINERY MAINTENANCE TO BE PERFORMED OFF-SITE O Z <br />7. ALL WATER PUMPED FROM TRENCHES OR SEDIMENT TRAP MUST PASS THROUGH A GRAVEL BAG FOR J <br />FILTRATION BEFORE IT IS DISCHARGED ON PROPERTY. Ja <br />S. DURING ROUGH GRADING CONTRACTOR TO INSTALL HEARTH DICE AND STRAW/FILTER ROLLS AT PERIMETER OF II) <br />THE PROPERTY TO MANTAN RUM -OFF ON SITE J <br />9. IN CASE COLLOIDAL SUSPENSION HEEDS TO BE REMOVED PRIOR TO DISCHARGE, THE CONTRACTOR WILL <br />DESIGN AND CONSTRUCT TEMPORARY HOLDING BASINS, THE DESIGN OF THE BASIN WILL BE ADDRESSED IF V M <br />THE NEED ARISES. Q <br />10.ALL LANDSCAPED AREAS ARE GRADED TO DRAIN IN THE DIRECTION OF THE DRAIN INLET. REFER TO <br />LANDSCAPING AND GRADING PLAN FOR DRAINAGE PATTERNS. Z Z <br />0 <br />EROSION CONTROL NOTES:U <br />1. ALL EROSION AND SEDIMENT CONTROL. MEASURES SHALL BE CONSTRUCTED AND O Q ~ r <br />MAINTAINED IN ACCORDANCE WITH THIS PLANS AND SPECIFICATIONS AND THEW 0 <br />CALTRANS STORM WATER OUALITY HINBOOKS, CURRENT EDITION (MARCH 2003). Q <br />2. EROSION CONTROL BEST MANAGEMENT PRACTICES (BMPs) SHILL INSTALLED AND N <br />MAINTAINED DURING THE WET SEASON (OCTOBER 15 THROUGH APRIL 30). SEDIMENT W <br />CONTROL BMPs SHALL BE INSTALLED AND MAINTAINED ALL YEAR. 0- Z N <br />3. ALL DRAINAGE INLETS MAEDATELY DOWNSTREAM OF THE WORK AREAS AND <br />WITHIN THE WORK AREAS SHALL BE PROTECTED WITH SEDIMENT CONTROL AND <br />INLET FILTER BAGS, YEAR ROUND. INLET FILTER BAGS SHALL BE REMOVED Z O <br />FROM THE DRAINAGE INLETS UPON ACCEPTANCE OF THE PUBLIC W m Z <br />IMPROVEMENTS. <br />4. ALL STABILIZED CONSTRUCTION ACCESS LOCATIONS SHAT BE CONSTRUCTED PER : Q <br />ATTACHED DETAIL WHERE CONSTRUCTION TRAFFIC ENTERS OR LEAVES PAVED AREAS. THE W V Z <br />5TABIJZ OF � SHILL BE MAINTAINED ON A YEAR ROUND BASIS UNTIL COMPLETION 1 O <br />5. ALL AREAS DISTURBED DURING CONSTRUCTION, BY GRADING. TRENCHING. OR OTHER ACTIVITIES, Q: N <br />SHALL BE PROTECTED FROM EROSION DURING THE WET SEASON (OCTOBER 15 THROUGH Q <br />APRIL 30). HYDROSEED, IF UTILIZED, MUST BE PLACED BY SEPTEMBER 15. HYDROSEED <br />PLACED DURING THE WET SEASON SHALL USE A SECONDARY EROSION PROTECTION METHOD _ W <br />SUCH AS EROSION CONTROL BLANKETS OR STRAW MULCH <br />G. SENSITIVE AREAS AND AREAS WHERE EXISTING VEGETATION IS BEING PRESERVED n Desi <br />SHALL BE PROTECTED WITH CONSTRUCTION FENCING. SEDIMENT CONTROL BMPs 9 <br />SHALL BE INSTALLED WHERE ACTIVE CONSTRUCTION AREAS DRAIN INTO SENSITIVE AMC <br />OR PRESERVED VEGETATION AREAS <br />Check <br />7. SEDIMENT CONTROL EMP* SHAT BE PLACED HANG THE PROJECT PERIMETER WHERE <br />DRAINAGE LEAVES THE PROJECT. SEDIMENT CONTROL BMT Ps SHABE MAINTAINED YEAR AMC <br />ROUND UNTIL THE CONSTRUCTION IS COMPLETE OR THE DRAINAGE PATTERN HAS BEEN Date <br />CHANGED AND NO LONGER LEAVES THE SITE. 04/01/05 <br />8. THE FOLLOWING AREAS ARE TO RECEIVE HYDROSEEDING OR OTHER EROSION CONTROL: <br />LOT FRONT YARD BEHIND CURB - THE FIRST 18 FEET OR TOP OF SLOPE (WHICHEVER Scale <br />IS GREATER) 1 ^ = 80, <br />SWARDS BEHIND THE CURB - THE FIRST 7.5 FEET OR TOP OF SLOPE (WHICHEVER <br />IS GREATER) <br />SLOPES - ALL SLOPES GRATER THAT 10:1 Original Drawing Scale <br />9. EROSION AND SEDIMENT CONTROL MEASURES FOR THIS PROJECT SHALL BE IN 0 1" <br />SUBSTANTIAL COMPLIANCE AT ALL TIMES WITH THE STORM WATER POLLUTION � <br />PREVENTION PIAN (SWPPP) PREPARED FOR THE PROJECT IN ACCORDANCE WITH <br />THE STATE OF CALIFORNIA GENERA. CONSTRUCTION PERMIT. THIS PERMIT Sheet Number <br />REQUIRES THAT THE SWPPP BE KEPT UP TO DATE TO REFLECT THE CHANGING <br />SITE CONDITIONS AND THE SWPPP IS TO BE AVAILABLE ON SITE AT ALL TIMES FOR 13 <br />REVIEW BY STATE AND LOCA. INSPECTORS. Of 17 <br />Project File No. <br />04-138 <br />
The URL can be used to link to this page
Your browser does not support the video tag.