Laserfiche WebLink
N9 <br />M <br />1. <br />ALL MATERIAL AND WORKMANSHIP SHALL CONFORM WITH THE LATEST <br />EDITIONS OF THE SPECIFICATIONS, STANDARDS AND ORDINANCES OF <br />THE TOTAL EARTHWORK QUANTITY IS: <br />SAN JOAQUIN COUNTY AND SHALL BE PART OF THESE IMPROVEMENT <br />PLANS. <br />2. <br />WHERE THE PLANS OR SPECIFICATIONS DESCRIBE PORTIONS OF THE WORK <br />THESE EARTHWORK QUANTITIES ARE NOT BID QUANTITIES. IT IS THE <br />IN GENERAL TERMS BUT NOT IN COMPLETE DETAIL, IT IS UNDERSTOOD <br />THAT ONLY THE BEST GENERAL PRACTICE IS TO PREVAIL AND THAT <br />MATERIALS AND WORKMANSHIP OF THE FIRST QUALITY ARE TO BE USED. <br />CONTRACTOR SHALL SUBMIT TO DILLON & MURPHY FOR APPROVAL <br />NOTED DIMENSIONS TAKE PRECEDENT OVER SCALE. ANY DISCREPANCY <br />SHALL IMMEDIATELY BE BROUGHT TO THE ATTENTION OF DILLON & MURPHY, <br />1820 W. KETTLEMAN LANE, SUITE E, LODI, CA, (209) 334-6613. <br />3. <br />CONTRACTORS SHALL BE RESPONSIBLE TO VISIT THE SITE AND VERIFY ALL <br />EXISTING CONDITIONS PRIOR TO SUBMITTING A BID. <br />4. <br />THE EXISTING UNDERGROUND UTILITIES ARE PLOTTED FROM AVAILABLE <br />AND PROJECT SPECIFICATIONS. SAN JOAQUIN COUNTY SHALL HAVE <br />RECORDS. CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES TO <br />PROTECT THESE UTILITIES. THE CONTRACTOR SHALL DO NO EXCAVATION <br />UNTIL ALL UTILITY AGENCIES HAVE BEEN NOTIFIED AND HAVE BEEN GIVEN <br />CONTRACTOR SHALL NOT CAUSE THE CONSTRUCTION SURVEY STAKES <br />THE OPPORTUNITY TO MARK THEIR FACILITIES IN THE FIELD. IT IS THE <br />CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION OF ALL <br />EXISTING UTILITIES. PRIOR TO OPENING AN EXCAVATION, THE <br />ACCEPTED BY THE INSPECTOR. CONTRACTOR SHALL COORDINATE <br />CONTRACTOR SHALL DETERMINE WHETHER UNDERGROUND <br />INSTALLATIONS, I.E., SEWER, WATER, STORM DRAINAGE, ELECTRICAL <br />LINES, GAS LINES, CABLE TV LINES, ETC. WILL BE ENCOUNTERED AND, THE <br />PREVIOUS SET OF CONSTRUCTION STAKES DO NOT CONFLICT WITH THE <br />APPROXIMATE LOCATION OF SUCH AN INSTALLATION. THE EXACT <br />LOCATION SHALL BE DETERMINED BY CAREFUL PROBING OR HAND <br />DIGGING AND WHEN IT IS UNCOVERED, ADEQUATE PROTECTION SHALL BE <br />ALL LINEAR FOOTAGES, AREAS OR VOLUMETRIC AMOUNTS OF PIPING <br />PROVIDED FOR THE EXISTING INSTALLATION. <br />5. <br />SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS <br />SHALL BE NOTIFIED BY THE CONTRACTOR AT <br />FILL MATERIAL SHOWN ON THESE IMPROVEMENT PLANS ARE <br />LEAST 48 HOURS IN ADVANCE OF ANY OFF-SITE CONSTRUCTION. <br />6. <br />DILLON & MURPHY SHALL PROVIDE ALL CONSTRUCTION STAKING. FIELD <br />CHANGES MADE BY OTHERS SHALL BE DONE AT THEIR OWN RISK. <br />7. <br />EACH CONTRACTOR IS RESPONSIBLE FOR ANY COORDINATION OF THE <br />38. <br />REMOVAL OR RELOCATION OF ANY AND ALL EXISTING UTILITIES WITH THE <br />RESPECTIVE UTILITY COMPANY. COST OF THIS COORDINATION IS TO BE <br />INSTALLED AND ENERGIZED. S.J. COUNTY WILL MAINTAIN ALL STREET LIGHTS <br />INCLUDED IN THE PRICES BID FOR THE VARIOUS IMPROVEMENTS TO <br />COMPLETE THE PROJECT. <br />B. <br />SAN JOAQUIN COUNTY BRASS DISC STAMPED "BB -42" ON SOUTHWEST <br />CONTRACTOR SHALL OBTAIN A SIGNED PLAN FOR THIS PROJECT <br />CORNER CONCRETE CULVERT 114 FEET NORTH OF LINNE ROAD ON THE <br />WEST SIDE OF MAC ARTHUR ROAD. ELEVATION = 138.584 <br />9. <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF <br />NONPOTABLE WATER SHALL BE USED ON THIS PROJECT, THE <br />ALL SURVEY AND CONSTRUCTION STAKES. SURVEY AND <br />CONSTRUCTION STAKES THAT ARE LOST OR DESTROYED DUE TO THE <br />CONTRACTOR'S NEGLIGENCE WILL BE RESET BY DILLON & MURPHY AT <br />INTENDED SOURCE PRIOR TO CONSTRUCTION. <br />THE CONTRACTOR'S EXPENSE. <br />10. <br />CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING EXISTING <br />IMPROVEMENTS FROM DAMAGE. EACH CONTRACTOR SHALL NOTIFY <br />RIGHT-OF-WAY PRIOR TO COMPLETION OF UTILITY RELOCATION WITHOUT <br />U.S.A. 48 HOURS PRIOR TO ANY EXCAVATION. <br />11. <br />CONTRACTOR AND SUBCONTRACTOR SHALL COOPERATE WITH <br />THEMSELVES AND UTILITY COMPANIES INSTALLING NEW STRUCTURES, <br />IF NECESSARY, A TRAFFIC CONTROL PLAN (TCP) SHALL BE SUBMITTED TO <br />UTILITIES AND SERVICES TO THE DEVELOPMENT. <br />12. <br />ALL UNDERGROUND SERVICES SHALL BE INSTALLED IN CONFORMANCE <br />WITH THE REQUIREMENTS OF THE SAN JOAQUIN COUNTY DEPARTMENT <br />SHALL ADDRESS ALL PHASES OF WORK, WHICH WILL IMPACT PUBLIC <br />OF PUBLIC WORKS. <br />13. <br />GRADES SHOWN ON THE PLAN ARE INTENDED TO REFLECT A BALANCE <br />OF EARTHWORK CUT AND FILL QUANTITIES. CONTRACTOR IS <br />TIMES. THE TCP SHALL BE DRAWN TO SCALE, AND IN CONFORMANCE WITH <br />RESPONSIBLE FOR PERFORMING AN INDEPENDENT BALANCE PRIOR TO <br />BEGINNING CONSTRUCTION. ANY DISCREPANCY BETWEEN THE <br />CONTRACTOR'S BALANCE AND THESE PLANS SHALL BE RESOLVED PRIOR <br />WHENEVER PAVEMENT IS BROKEN OR CUT IN THE INSTALLATION OF THE <br />TO COMMENCEMENT OF WORK. FAILURE BY THE CONTRACTOR TO <br />RECTIFY ANY DIFFERENCES SHALL SHIFT THE RESPONSIBILITY (AND <br />COSTS FOR ADDTIONAL EARTHWORK) ENTIRELY TO HIM. <br />14. <br />ANY FILL PLACE SHALL BE PROPERLY COMPACTED AS REQUIRED BY THE <br />PLANS, THESE NOTES, AND THE SOILS REPORT. <br />A. EARTH FILL TO ESTABLISH FINISHED GRADE OUTSIDE THE PAVED <br />DRAINAGE FACILITIES SHALL BE MAINTAINED DURING PERIODS OF INCLEMENT <br />AREAS AND BUILDINGS AREAS SHALL BE COMPACTED TO A <br />MINIMUM RELATIVE COMPACTION OF 90 % ON THE LOTS. <br />B. FILL SHALL BE NON -EXPANSIVE MATERIAL AND SHALL BE FREE OF <br />OF THE WORK. <br />VEGETATION OR DELETERIOUS MATTER. FILL SHALL BE COMPACTED <br />45. <br />TO A POINT SIX INCHES BELOW SUBGRADE. <br />15. <br />CONTRACTOR'S BID SHALL INCLUDE THE COST OF ANY NECESSARY <br />COMMUNITY DEVELOPMENT DEPARTMENT BEFORE ORDERING STREET SIGNS. <br />SOILS COMPACTION AND MATERIALS TESTING. <br />16. <br />CONCRETE <br />A. GENERAL - ALL CONCRETE WORK SHALL BE PERFORMED IN <br />SHALL NOTIFY THE PROPERTY OWNER 48 HOURS PRIOR TO COMMENCING WORK. <br />ACCORDANCE WITH ACI AND UBC CODES. <br />47. <br />B. CONCRETE STRENGTH - UNLESS OTHERWISE NOTED ON THE PLANS, <br />FILING <br />CONCRETE SHALL OBTAIN A MINIMUM OF DESIGN STRENGTH OF <br />OF A NOTICE OF INTENT (N01) TO COMPLY WITH THE STATE'S NATIONAL POLLUTANT <br />2500 PSI. <br />1. CEMENT - 5.5 SACKS MINIMUM PER YARD. <br />g <br />&� <br />2. WATER - MAXIMUM 7 GALS. PER SACK OF CEMENT. <br />IN THE PROJECT'S STORMWATER POLLUTION PREVENTION PLAN (SWPPP), WHICH IS <br />3. AGGREGATE - MAXIMUM SIZE 3/4". <br />zs <br />4. SLURRY - 5" MAXIMUM. <br />g <br />5. CURING - KEEP WET MINIMUM OF 7 DAYS, OR APPLY MEMBRANE <br />CURING COMPOUND APPROVED BY THE ENGINEER. <br />6. VIBRATION - ALL CONCRETE SHALL BE VIBRATED INTO PLACE <br />WITH A MECHANICAL VIBRATOR. <br />l2 <br />7. FORM REMOVAL - SIDE FORMS OF FOUNDATIONS AND SLABS, <br />MINIMUM OF 2 DAYS, <br />8. TESTING IN ACCORDANCE WITH ACI -301-72, CHAPTER 16. <br />C. REINFORCING MATERIALS: <br />g_ <br />$ <br />1. DEFORMED BARS - ASTM A615, GR. 60. <br />$ <br />2. ELECTRIC WELDED WIRE FABRIC (WWF) ASTM A-185. <br />GENERAL NOTES AND SPECIFICATIONS <br />17. ASPHALT CONCRETE: ASPHALT CONCRETE SHALL BE TYPE B AND <br />SHALL CONFORM TO THE PROVISIONS OF SECTION 39 OF THE CALTRANS <br />STANDARD SPECIFICATIONS. THE PENETRATION RANGE OF PAVING <br />ASPHALT SHALL BE AR -4000; AGGREGATE SHALL BE ONE-HALF (1/2") <br />INCH MAXIMUM MEDIUM GRADING FOR SURFACING. <br />PRIME COAT SHALL BE A LIQUID ASPHALT GRADE SC -250 OR SC -70 AND <br />SHALL BE APPLIED TO THE ENTIRE PAVED AREA AND THE COST SHALL BE <br />INCLUDED IN THE UNIT PRICE BID FOR ASPHALT CONCRETE. PRIME COAT <br />SHALL BE PLACED IN ACCORDANCE WITH THE REQUIREMENTS OF <br />SECTION 39-4 OF THE CALTRANS STANDARD SPECIFICATIONS. <br />AGGREGATE BASE: AGGREGATE BASE SHALL BE CLASS TWO <br />CONFORMING TO THE REQUIREMENTS OF SECTION 26-1.026A OF THE <br />CALTRANS STANDARD SPECIFICATIONS. SPREADING AND COMPACTING <br />AGGREGATE BASE SHALL CONFORM TO THE REQUIREMENTS OF SECTION <br />26-1.04 OF THE CALTRANS STANDARDS SPECIFICATION. <br />18. THE GRADING AND PAVING CONTRACTOR SHALL ADJUST TO FINISHED <br />GRADE THE TOPS OF ALL PROPOSED AND EXISTING MANHOLES, VALVE <br />BOXES AND WATER METER BOXES, ETC. THE COST OF SUCH WORK <br />SHALL BE INCLUDED IN THE UNIT PRICES FOR STREET WORK. <br />19. THE DOMESTIC WATER LINE SHALL BE CONSTRUCTED IN ACCORDANCE <br />WITH THESE PLANS, AND SAN JOAQUIN COUNTY DEPARTMENT OF <br />PUBLIC WORKS ADOPTED IMPROVEMENT STANDARDS, AND UNIFORM <br />BUILDING CODE. PIPE MATERIAL SHALL BE THAT ALLOWED BY THE <br />PLUMBING CODE AND SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC <br />WORKS IMPROVEMENT STANDARDS. IT IS THE CONTRACTOR'S <br />RESPONSIBILITY TO VERIFY THAT THE TYPE AND SPECIFICATIONS OF ALL <br />MATERIAL, FITTINGS, ETC. CONFORM TO SAN JOAQUIN COUNTY <br />DEPARTMENT OF PUBLIC WORKS STANDARDS AND SPECIFICATIONS. <br />CONTRACTOR SHALL BE RESPONSIBLE FOR PRESSURE AND BACTERIA <br />TESTING OF WATER LINES AS REQUIRED BY SAN JOAQUIN COUNTY <br />DEPARTMENT OF PUBLIC WORKS. BACTERIA TESTS SHALL BE TAKEN BY <br />A CERTIFIED LABORATORY TECHNICIAN. <br />REFER TO SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS FOR <br />ALL WATER LINE TESTING REQUIREMENTS. <br />20. THE STORM DRAIN PIPELINE SHALL BE CONSTRUCTED IN ACCORDANCE <br />WITH THESE PLANS, AND SAN JOAQUIN COUNTY DEPARTMENT OF <br />PUBLIC WORKS ADOPTED IMPROVEMENT STANDARDS. PIPE MATERIAL <br />SHALL BE THAT ALLOWED BY THE SAN JOAQUIN COUNTY DEPARTMENT <br />OF PUBLIC WORKS IMPROVEMENT STANDARDS OR AS SHOWN ON THE <br />PLANS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THAT THE <br />TYPE AND SPECIFICATIONS OF ALL MATERIALS, FITTINGS, ETC. <br />CONFORM TO SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS <br />STANDARDS AND SPECIFICATIONS. MATERIAL SELECTION SHALL BE <br />SUBMITTED TO THE CIVIL ENGINEER FOR REVIEW. <br />21. GRADING AND PAVING CONTRACTOR SHALL COORDINATE THE <br />INSTALLATION OF ALL ELECTRICAL, LANDSCAPE, IRRIGATION, AND <br />UNDERGROUND UTILITY CONDUITS WITH APPROPRIATE SUB- <br />CONTRACTORS AND UTILITY COMPANIES PRIOR TO CONSTRUCTION. <br />22. THE OFFICE OF DILLON & MURPHY, 1820 W. KETTLEMAN LANE, SUITE E, <br />LODI, CA, SHALL BE NOTIFIED 48 HOURS (MINIMUM) IN ADVANCE OF <br />ANY REQUIRED CONSTRUCTION SURVEYING. <br />23. CONTRACTOR'S AND SUB -CONTRACTORS BIDDING ON THIS PROPOSED <br />PROJECT SHALL CAREFULLY EXAMINE THESE PLANS AND CAREFULLY <br />REVIEW THE CONSTRUCTION SITE TO DETERMINE SPECIFICALLY WHAT IS <br />REQUIRED TO BE ACCOMPLISHED IN HIS PORTION OF THE TOTAL WORK. <br />IF ANY DOUBT EXISTS TO THE INTENT OF THE PLANS, SPECIFIC DETAILS, <br />CONSTRUCTION NOTES, OR IF THE CONTRACTOR AND SUB -CONTRACTOR <br />REQUIRES ADDITIONAL INFORMATION, IT MUST BE CLARIFIED WITH <br />DILLON & MURPHY. <br />24. CONTRACTOR AND ANY SUB -CONTRACTOR USING PLANS WHICH ARE <br />UNAPPROVED BY SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC <br />WORKS SHALL DO SO AT THEIR OWN RISKS. DILLON & MURPHY WILL <br />NOT BE HELD RESPONSIBLE FOR USAGE OF SUCH PLANS FOR THE <br />CONSTRUCTION OF THIS PROJECT. <br />25. DILLON & MURPHY SHALL NOT BE RESPONSIBLE FOR ANY SURVEYING OR <br />FIELD CHANGES MADE BY ANY OTHER SURVEYING OR ENGINEERING <br />FIRMS. ANY ERRORS OR OMISSIONS DETECTED SHALL BE MITIGATED BY <br />DILLON & MURPHY. <br />26. SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS WILL PERFORM <br />FIELD INSPECTIONS FOR THIS PROJECT: ANY IMPROVEMENTS <br />CONSTRUCTED TO THE SPECIFICATIONS AND WHICH IT IS INTENDED <br />THAT SAN JOAQUIN COUNTY WILL ASSUME MAINTENANCE <br />RESPONSIBILITY, MUST BE INSPECTED DURING CONSTRUCTION BY AN <br />AUTHORIZED AGENT OF SAN JOAQUIN COUNTY. <br />27. CHANGES ON PLANS AND SPECIFICATIONS: ANY CHANGES TO THE <br />APPROVED IMPROVEMENT PLANS AND SPECIFICATIONS MUST BE <br />PREPARED AND APPROVED BY DILLON & MURPHY AND SHALL BE <br />SUBMITTED TO SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS <br />FOR APPROVAL PRIOR TO IMPLEMENTATION. <br />28. THIS SITE CONTAINS 14.42 ACRES GROSS. <br />29. ALL TRAFFIC SIGNS AND MARKINGS SHALL CONFORM TO SAN JOAQUIN <br />COUNTY STANDARDS AND TO THE MANUAL ON UNIFORM TRAFFIC <br />CONTROL DEVICES (MUTCD), THE MUTCD CALIFORNIA SUPPLEMENT, <br />AND TO THE CALTRANS TRAFFIC MANUAL ALL AS SHOWN ON THE PLANS. <br />30. CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE <br />RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF <br />CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSON <br />AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY <br />AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE <br />CONTRACTOR SHALL DEFEND; INDEMNIFY AND HOLD HARMLESS, THE <br />COUNTY OF SAN JOAQUIN, ITS ELECTED OFFICIALS, OFFICERS, <br />EMPLOYEES AND DILLON & MURPHY FROM ANY AND ALL CLAIMS, COSTS <br />OR LITIGATION, DAMAGES, AND ATTORNEY'S FEES, FOR PERSONAL <br />INJURY OR PROPERTY DAMAGE OF WHATEVER NATURE WHICH ARE <br />CLAIMED TO HAVE OCCURRED DURING THE TERM OF THIS PROJECT. <br />31. ALL UTILITIES SHALL BE UNDERGROUND, UNLESS SPECIFICALLY NOTED <br />OTHERWISE ON PLANS. <br />32. THIS PROJECT SHALL IMPLEMENT THE AIR POLLUTION CONTROL <br />DISTRICT'S FUGITIVE DUST CONTROL MEASURES AND OZONE EMISSION <br />MEASURES DURING CONSTRUCTION. <br />33. ALL EARTHWORK AND GRADING SHALL BE IN CONFORMANCE WITH <br />RECORD DRAWING <br />Corrections By <br />No Crlan9es By <br />Date <br />Any Per$or? Using This Drawing Should Verify <br />All information By insoectino The Qnc n= Work <br />BEFORE YOU DIG <br />CALL USA UNDERGROUND SERVICE ALERT <br />48 HOURS PRIOR TO CONSTRUCTION. CALL <br />TOLL FREE 1-800-227-2600 <br />KEEP ALL VEHICLES, EQUIPMENT, TOOLS AND <br />PEOPLE 10 FEET FROM POWER LINES, IF YOU <br />MUST WORK WITHIN 10 FEET OF POWER LINES <br />PLEASE CALL PG&E O 800-743-5000 <br />CHAPTERS 29 AND 70 OF THE UNIFORM BUILDING CODE, DATED 1994. <br />34. <br />THE TOTAL EARTHWORK QUANTITY IS: <br />APPROX. VOLUME OF FILL = 11,000 CYD <br />THESE EARTHWORK QUANTITIES ARE NOT BID QUANTITIES. IT IS THE <br />CONTRACTOR'S RESPONSIBILITY TO VERIFY ALL QUANTITIES. <br />35. <br />CONTRACTOR SHALL SUBMIT TO DILLON & MURPHY FOR APPROVAL <br />EQUIPMENT AND MATERIAL SPECIFICATION OF ITEMS HE WISHES TO <br />SUBSTITUTE FROM THAT WHICH IS SPECIFIED ON THE IMPROVEMENT <br />PLANS, SAN JOAQUIN COUNTY STANDARD PLANS AND SPECIFICATIONS <br />AND PROJECT SPECIFICATIONS. SAN JOAQUIN COUNTY SHALL HAVE <br />THE FINAL SAY. <br />36. <br />CONTRACTOR SHALL NOT CAUSE THE CONSTRUCTION SURVEY STAKES <br />TO BE DESTROYED OR REMOVED UNTIL THE IMPROVEMENTS HAVE BEEN <br />ACCEPTED BY THE INSPECTOR. CONTRACTOR SHALL COORDINATE <br />ACCEPTANCE OF IMPROVEMENTS BY THE INSPECTOR SO THAT THE <br />PREVIOUS SET OF CONSTRUCTION STAKES DO NOT CONFLICT WITH THE <br />NEXT PHASE OF CONSTRUCTION. <br />37. <br />ALL LINEAR FOOTAGES, AREAS OR VOLUMETRIC AMOUNTS OF PIPING <br />MATERIAL, CONCRETE, ASPHALT CONCRETE, EXCAVATION AND IMPORT <br />FILL MATERIAL SHOWN ON THESE IMPROVEMENT PLANS ARE <br />APPROXIMATE. ACTUAL AS -BUILT FIELD MEASUREMENTS SHALL <br />PREVAIL. <br />38. <br />PRIOR TO ACCEPTANCE OF IMPROVEMENTS, STREET LIGHTS SHALL BE <br />INSTALLED AND ENERGIZED. S.J. COUNTY WILL MAINTAIN ALL STREET LIGHTS <br />AND STANDARDS UPON ACCEPTANCE OF PROJECT AS COMPLETE. <br />39. <br />CONTRACTOR SHALL OBTAIN A SIGNED PLAN FOR THIS PROJECT <br />PRIOR TO BEGINNING ANY GRADING ON-SITE OR OFF-SITE. <br />40, <br />NONPOTABLE WATER SHALL BE USED ON THIS PROJECT, THE <br />CONTRACTOR SHALL NOTIFY THE COUNTY IN WRITING OF THE <br />INTENDED SOURCE PRIOR TO CONSTRUCTION. <br />41. <br />FINAL PAVEMENT WORK SHALL NOT OCCUR WITHIN ANY EXISTING ROAD <br />RIGHT-OF-WAY PRIOR TO COMPLETION OF UTILITY RELOCATION WITHOUT <br />SPECIFIC APPROVAL OF THE DIRECTOR. <br />42. <br />IF NECESSARY, A TRAFFIC CONTROL PLAN (TCP) SHALL BE SUBMITTED TO <br />AND DEEMED ACCEPTABLE BY COUNTY PRIOR TO START OF WORK. THIS <br />SHALL ADDRESS ALL PHASES OF WORK, WHICH WILL IMPACT PUBLIC <br />TRAFFIC. CONFORMANCE WITH THE TCP SHALL BE MAINTAINED AT ALL <br />TIMES. THE TCP SHALL BE DRAWN TO SCALE, AND IN CONFORMANCE WITH <br />THE LATEST MUTCD MANUAL AND CALIFORNIA SUPPLIMENTAL MANUAL. <br />43. <br />WHENEVER PAVEMENT IS BROKEN OR CUT IN THE INSTALLATION OF THE <br />WORK COVERED BY THE SPECIFICATIONS, THE PAVEMENT SHALL BE <br />REPLACED, AFTER PROPER BACKFILLING, WITH PAVEMENT MATERIALS EQUAL <br />TO OR BETTER THAN THE MATERIALS USED IN THE ORIGINAL PAVING. <br />44. <br />DRAINAGE FACILITIES SHALL BE MAINTAINED DURING PERIODS OF INCLEMENT <br />WEATHER, AND RESTORED TO THEIR ORIGINAL CONDITIONS UPON COMPLETION <br />OF THE WORK. <br />45. <br />CONTRACTOR SHALL VERIFY ALL STREET NAMES WITH SAN JOAQUIN COUNTY <br />COMMUNITY DEVELOPMENT DEPARTMENT BEFORE ORDERING STREET SIGNS. <br />46. <br />WHERE WORK IS BEING DONE IN AN OFFSITE EASEMENT, THE CONTRACTOR <br />SHALL NOTIFY THE PROPERTY OWNER 48 HOURS PRIOR TO COMMENCING WORK. <br />47. <br />GRADING/CONSTRUCTION THAT DISTURBS MORE THAN ONE ACRE WILL REQUIRE THE <br />FILING <br />OF A NOTICE OF INTENT (N01) TO COMPLY WITH THE STATE'S NATIONAL POLLUTANT <br />DISCHARGE <br />ELIMINATION SYSTEM GENERAL CONSTRUCTION PERMIT. A COPY OF THE NOI SHALL <br />BE PLACED <br />IN THE PROJECT'S STORMWATER POLLUTION PREVENTION PLAN (SWPPP), WHICH IS <br />TO BE KEPT ONSITE. <br />RECORD DRAWING <br />Corrections By <br />No Crlan9es By <br />Date <br />Any Per$or? Using This Drawing Should Verify <br />All information By insoectino The Qnc n= Work <br />BEFORE YOU DIG <br />CALL USA UNDERGROUND SERVICE ALERT <br />48 HOURS PRIOR TO CONSTRUCTION. CALL <br />TOLL FREE 1-800-227-2600 <br />KEEP ALL VEHICLES, EQUIPMENT, TOOLS AND <br />PEOPLE 10 FEET FROM POWER LINES, IF YOU <br />MUST WORK WITHIN 10 FEET OF POWER LINES <br />PLEASE CALL PG&E O 800-743-5000 <br />