Laserfiche WebLink
9 <br />�o <br />v <br />o4 <br />ata <br />m <br />t "e•. <br />0 <br />1ll <br />e <br />m <br />F? <br />ACRES t <br />7 <br />1.23 CRSS LUZ <br />_ <br />SERVICES <br />STREET LIGHTS PRIVATE <br />SANITARY SEWER PRIVATE SEPTIC SYSTEMS c,f <br />NATURAL GAS & ELECTRIC P.G.& E. �. \• <br />TELEPHONE - S B <br />CABLE TV COMCAST <br />WATER C S A. N0.43 <br />STORM DRAINAGE C S A. N0.43,� <br />EASEMENTS SHALL BE PROVIDED AS REQUIRED BY THE VARIOUS UTILITIES. <br />LEGEND <br />SSMH SANITARY TYPE I MAINTENANCE HOLE <br />SDMH STORM DRAIN TYPE I MAINTENANCE HOLE `x <br />.10'SS FLOW DIRECTION As SIZE OF SANITARY SEWER <br /><15"SD FLOW DIRECTION & SIZE OF STORM <br />W <br />WATER LINE SIZE <br />Pp' �' EXISTING POWER POLE <br />EXISTING GUY ANCHOR <br />CICB DEC TYPE I CURB INLET CATCHBASIN o <br />EXSSMHC' EXISTING SANITARY TYPE 1 MAINTENANCE HOLE <br />FxSDMH n EXISTING STORM TYPE I MAINTENANCE HOLE <br />ExIO'SS EXISTING FLOW DIRECTION & SIZE OF SANITARY SEWER ,n <br />eExl5 SO EXISTING FLOW DIRECTION & SIZE OF STORM <br />Fx-Fill EXISTING WATER LINE SIZE <br />S INSTALL WATER VALVE <br />Z EXISTING WATER VALVE o <br />Y FH INSTALL FIRE HYDRANT <br />�iFH EXISTING FIRE HYDRANT <br />5' P.U.E. PUBLIC UTILITY EASEMENT WITH WIDTH <br />B.C. BEGIN CURVE <br />E . END CURVE <br />EX. or EXIST. EXISTING <br />CO COUNTY <br />B.C.R. BEGIN CURB RETURN <br />E C R, END CURB RETURN <br />G B. GRADE BREAK <br />+ STREET SIGN POST <br />STOP SIGN POST <br />10 <br />ACRO - <br />6 <br />1.39 ACRES t <br />5 \ <br />1.63 ACRES t <br />lACRES <br />4 <br />103 ACRES t <br />13 <br />ACRES i <br />A <br />i <br />14 - <br />1 75 ACRES f <br />�A V ice/ <br />i <br />i <br />i <br />9 <br />^ X <br />J a <br />k <br />\ <br />i <br />i <br />i <br />35 AC t <br />�y <br />07 ACRES <br />\` <br />FENCE_ D FENCE1. 5 ACRES <br />CABLE t _ \ <br />nova, wxw. / <br />i, <br />EXISTING STREET LIGHT (W/30 STD, & 8' ARM) <br />"< HIGH PRESSURE SODIUM VAPOR (150 W)�' <br />INSTALL STREET LIGHT (W/0STD. & 8' ARMS <br />HIGH PRESSURE SODIUM VAPOR (150 W) .aZ Jho <br />EXCEPT WHERE NOTED i /' <br />LP. LOW POINT �� <br />[i.p. HIGH POINT �.° <br />TC TOP OF CURB 'w , <br />CO.T.G. CLEAN OUT TO GRADE <br />* BO BLOWOFF <br />Q ExBO EXISTING BLOWOFF <br />INV 31.08 PIPE INVERT ELEVATION <br />BY 31.08 EXISTING PIPE INVERT ELEVATION <br />4; CENTERLINE <br />"®' HANDICAP RAMP <br />R;W RIGHT OF WAY <br />PL PROPERTY FINE <br />1 B-4 LOCATION OF BORINGS DRILLED PER <br />{� KLEINFELDER SOILS REPORT PROJECT N0. 20 3341 01, DATED MAY 10,1990 <br />SIDE INLET CATCH BASIN <br />PROPOSED SURVEY MONUMENT BOX (FRAME AND COVER) <br />INDEMNITY CLAUSE <br />The Contractor agrees that he shall assume sole and complete responsibility for job site conditions <br />during the course of construction of this project, that this requirement shall apply continuously and <br />not be limited to normal working hours, and that the Contractor shall defend, indemnify and hold <br />harmless the Owner, Project Engineer, San Joaquin County, and Lockeford Community Services District <br />from any and all claims of litigation, damages and attorneys fees for personal or property damage of <br />035MOP0.dwg 035aHC.dwg <br />k.� <br />15 0/ <br />ACRES]// <br />i <br />0 <br />s <br />CABLE FENCE / <br />T <br />v v i <br />A <br />- WOOD FENCE <br />i <br />i <br />i <br />These Improvement Plans have been prepared with the intent that the firm of Baumbach & Piazza, Inc will <br />be performing the construction staking for the complete project If, however, another engineering and/or <br />surveying firm should be employed to use these plans for the purpose of construction staking, notice is hereby <br />given that the firm of Baumbach & Piazza, Inc. will not assume any responsibility for errrors or omissions <br />If any, which might occur and which could have been avoided, corrected or mitigated if Baumbach & Piazza, <br />Inc, had performed the staking work, or if Baumbach & Piazza, Inc. had been contacted prior to staking a .• <br />regarding any questions of ambiguity in the plans, interpretation of the plans, or engineering inconsistencies �w <br />contained in these plans. f <br />GENERAL NOTES <br />I. ALL WORK SHALL CONFORM to these plans and special provisions for this project <br />2_ REFER TO THE final map of this subdivision for all cemorHme and property line data. <br />3. THE CONTRACTOR SHALL receive an approved set of plans and specifications prior to <br />coaiunin, censtalctlon. <br />4. BAUMBACH & PIAllA (Engineer) shall set all survey coulids and ronstudion sl -ekes <br />=l necessary [or completion of work. The Contractor shall be responsible for the press - <br />all survey and construction stakes. Survey and construction stakes that <br />are lost or destroyed, due to Contractor's negligence will be reset by the Engineer at <br />the Contractors expense. <br />5_ THE EXISTING UNDERGROUND utilities were plotted from avaluble records. The <br />Contractor shall be responsible for coutaetlng all utility agencies to mark their <br />facilities in the field before any excavation. The Contractor shall notify and <br />coordinate all work with any agency requiring removal or relocation of their utilities. <br />S.B.C., P.G.& E, Cable T'.V. and it SA. (800) 227 2600. <br />6, Fire Hydrant k water service laterals and street light mndut shall be installed <br />prior to paving construction, All underground utilities wtor the street <br />area, including gas and telephone lines, shall be installed prior to paving <br />7. All, MANHOLES are to be set flush with the [rash grade, unless otherwise indicated. <br />8. ALL WATER LINES shall have a minimum cover of 30 <br />9. WATER USED in any phase of construction.. such as backfill cmnpaetior dust control <br />testing or other work herein required, shall as included in the suit price or <br />lump sum bid for the respective item of construction. Non -Potable Water shall be uased. <br />10- CONTRACTOR AGREES THAT he shall assume sole and complete respon [filly for !old site <br />conditions duringthe course of construction of this project, including safet' for all <br />P1 g Y <br />persons and piopery that File requirement hall apply continuously and not be limited <br />to normal working hours one that Contractor shall defend, Iridernmfyand hold the <br />Owner, Project Engineer, San Joaquin County ISM narmless from any and all eaoJitv. <br />real or alleged in connection with the performance of work on this project, <br />excepting for liability arising from the sole negligence of the Owner, Project Engineer. <br />San Joaquin County (SJC). <br />It. CONTRACTOR SHALL give Engineer a minimum of 48 hours notification prior to staking <br />any utilities <br />12. LOT GRADING SHALL he completed before starling any underground construction, <br />Refer to al:achecgP <br />radio Ian. <br />g <br />S <br />13. ALL WATER LINES shall be disinfected. flushed and tested for bacteria in conlormance. <br />with the AWWA C681rior to connecting to existing water line The number of <br />P g <br />hacls ioca'I tests shall be determined by San Joaquin County staff Can Joaquin <br />County is responsible for inspection and testing of the slormwa.er system. <br />14. ALL WATER LINESshall be pressure tested per the latest SIG standards Pipeline, <br />failing pressure test shall be repaired and retested. Contractor to provide all <br />necessary equipment for testing and provide at least 48 hours 'mice to SJC. <br />15- THE CONTRACTOR SHALL visit Hie site prior to bidding. Specifications are a separate <br />document <br />I6. NEW TRAFFIC STRIPING and the removal and restoration of any damaged existing <br />painted legend or signs is the responsibility of the contractor and shall be included <br />in his bid price. <br />17. THE CONTRACTOR SHALL be responsible, for notifying and co-ordinating all work with <br />env agency cash ring removal or relocation of utilities such as SBC. P.G.&E.. <br />g Y re 9 g <br />etc. <br />0 <br />18. ALL WORK WILL be inspected b the Jan Joaquin Count public Works De ail merit adC' <br />P 9 P <br />shall inspect the Well Site along with all of the waters stem The De ailment of Public <br />P g Y P <br />Works shall be notified not less than 48 hours in advance for inspection No water <br />pipeline shall be buried prior to inspection by Public Works Department staff. <br />IECORn OR <br />orrectlensRe.._..._-645Y.I <br />n Cherl Fou . _,���- -.. <br />ny Person U..ng <br />This awlate <br />++nq nSh kj'.i rtf <br />T <br />X11 inform^4JM Pv incnoMi^" , <br />APPROVED BY SAN JOAQUIN COUNTY FIRE WARDEN <br />&-e Aver- q-z1.a <br />DATE <br />APPROVED BY SAN JOAQUIN COUNTY PUBLIC HEALTH <br />DATE <br />CAUTION!! <br />0 rh 1 <br />DO NOT SCALE THIS <br />DRAWING IF BAR DOES <br />NOT MEASURE 1INCH <br />- <br />BY CLEMENTSBvIRZ DISTRICT <br />DATE <br />ALL WORK WITHIN CALTRANS RIGHT- <br />OF-WAY SHALL BE DONE UNDER THE <br />CALTRANS ENCROACHMENT PERMIT AND <br />ACCORDING TO CALTRANS STANDARDS. <br />CALTRANS SHALL APROVE ALL WORK <br />WITHIN ITS RIGHT-OF-WAY PRIOR TO <br />COMMENCEMENT OF SUCH WORK. <br />z <br />zi <br />t� <br />BB&12 <br />SITE STRIE <br />VICINITY MAP <br />NOT TO SCALE <br />R.C.E. NO.: 6533 EXP. DATE 630 <br />IRE OR OF PUBLIC WORKS DATE <br />COUNTY OF SAN JOAQUIN <br />COUNTY APPROVAL <br />N0. DESCRIPTION : AOPDM av nnTw <br />19. IT IS AGREED that field conditions may -equl changes to these plans. It n= further <br />agreed that the San Joaquin County may require changes, alterations or additions to <br />these plans- when the Director deems them to be necessary or desirable for the <br />proper completior of [Ce wort. <br />20. FIRE HYDRANT BID shall include the following Tee 6 aterel, 6bahe and comtele <br />fire hydrant assembly. <br />21. THE CONTRACTOR SHALL notify the SIC for approval prior to connecting the water <br />line to existing water main Backflow prevenLoi creme is to be certified. <br />22. PIPE TYPE and strengths allowed for underground firdnies unless otherwise sper.f ed <br />on plans, are as follows: <br />Water (W)=PVC CLAW or greater iter AWWA Std. C-900 <br />28 All traffic signs and markings shall conform to the San Joaquin County Standards <br />'Manual on Uniform Traffic Control Devices and Traffic Control Plans and the <br />latest edition of Caltrans Traffic Manual. <br />24 ANY CHANCES TO lire approved Improvement Pians and Specihrators must be pre <br />pared and certified by the "Civil Engineer' and shall be approved by the Director <br />prior to implementation. <br />25. THE CONTRACTOR all coordinate a preconArnd:or meeting between himself. <br />the Engineer, the Pubhe Agencies and Burnt fill at _east 48 hours <br />prior to commencing work <br />26. Install a reflective, blue marker near the center line of the sheet to denote <br />the fire hydrant location. <br />27_ Material sampling and testing shall be the responsibility of the contractor All <br />resale shall be sent to the County Inspector. <br />281 The Contractor shall obtain an Encroachment. Permit from SIC for all work within <br />the existing street right-of-way <br />29. The Contractor shall obtain a grading permit from the SIC Building Division for Final Lot Grading, only. <br />30. The owner shall have compaction tests taken for street subgiade, ntilily trenches <br />and lot fill Any required retests will be at the contractors expense - <br />The Contractor shall call for tests and submit the results to the <br />County as soon as possible, Soils that fail compaction testing shall be <br />removed, recompacted and treated at the contractors expense. <br />31_ All construction and materials shall be in accordance with the latest edition of <br />the San Joa9 inn County Improvement „landards. <br />32. Finala vement work shall not occur within the road right-of-way prior to <br />P g 9 <br />completion of utility relocation without specific aaproval of the Director. <br />33- A Traffic Control Plan DTCPshall be submitted to and deemed acceptable b <br />County ata minimum of two (21 weeks prior to start of work. This shall <br />address all phases of work, whish will impact public traffic. Conformance <br />with the TCP shall be maintained at all times. <br />34. Whenever pavement is broken or cut in the installation of the work covered by the <br />specifications, the pavement shall be replaced after proper backfilling with pavement <br />materials equal to or better than the materials used in the original paving. <br />35. Drainage facilities shall be maintained during periods of Inclement weather and <br />restored to their original conduions upon completion of work. <br />36. Contractor shall verify all street names with San Joaquin County Community <br />Development Department before ordering street signs. <br />37, Refer to Major Subdivision Application lication No. PA -03-569 <br />I <br />38 All references to Standard Plan Details are San Joaquinuin County Standard Plans. <br />unless otherwise octad. <br />39. All water facilities shall be tested in accordance with SJC standards. <br />40. Contractor shall submit all material specifications for water facilities <br />to SJCPWD for approval prior to construction. <br />41, The Contractor will save and protect all Oak Trees over 6' in diameter . <br />42. An encroachment permit from CalTrans shall be required for any work <br />within State Highway Route 88 right -of way. <br />43. Any construction activity that results 1n the disturbance of at least one acre <br />of soil shall require a State NPDES construction permit <br />44, Driveways shall be graded to drain towards main road. <br />EROSION & SEDIMENT CONTROL NOTES <br />REFER ALSO TO PROJECT "STORM WATER POLLUTION PREVENTION PLAN' (SW.P P P.) FOR EROSION CONTROL PLAN. <br />45. Notice of Intent (NOQ for State General NPDES Construction Permit is required prior to site work. <br />46, Reference WDID g 5S39C331709. <br />47. All catch basins shall be protected and filtered until the completion of the project. If site work extends into <br />the rainy season other measures may be taken as required b the Count at no additional cost to the owner <br />u 9 Y Y <br />refer to S.W.P.P.P. All storm drainage traps shall be cleaned poor to acceptance. <br />48. Cost of erosion control and other items of winterization shall be included in an Item entitled Erosion Control <br />and Winterization" <br />SHEET INDEX <br />KEY SHEET & NOTES <br />G2 <br />WELL SITE <br />DETAILS <br />1j3 <br />STORM DRAINAGE BASIN <br />DETAILS & STREET SECTIONS <br />14i <br />POND ACCESS ROAD <br />DETAILS <br />15 <br />WELL DETAIL <br />GRADING PLAN <br />18) <br />WELL DETAIL <br />UTILITY PLAN <br />�' <br />WELL HOUSE DETAIL <br />STREET LIGHTING PLAN <br />�v <br />,'M <br />TITLE SHEET <br />ATHEARN STREET <br />STATE HIGHWAY NO. 12 & 88 <br />ANDERSON STREET <br />\19 <br />IMPROVEMENT PLAN <br />B STREET <br />STATE HIGHWAY NO. 12 & 88 <br />OAK MEADOW LANE <br />'?O <br />STRIPING AND SIGNAGE <br />HIGHWAY NO. 12 & 88 <br />NOTE: <br />REFER TO PROJECT "STORM WATER POLLUTION PREVENTION PLAN" (S WP P P) FOR EROSION CONTROL PLAN <br />CLEMENTS OAKRIDGE ESTATES DRAWN By E. S. <br />KEY SHEET & NOTES SCALE I "=100' <br />D IN THE OFFICE OF SHEET 1 OF 20 <br />BAUMBACH & PIAllA INC. <br />CIVIL ENGINEERS DATE: 15r-1 %O S JOB N0, <br />323 WEST ELM STREET 0358 <br />ODI, CALIFORNIA 240 R.C.E. NO.: �� _ <br />DESIGNED R THE SUP ISIO OF: FILE NO. <br />nRctr.N wurtuvw9 EXP DATE 3-V-0 G-1274 <br />